With cold weather in the capital threatening to mar a series of parties scheduled during the run-up to Christmas, an immediate solution was needed to ensure these could proceed as planned.

Our response to the issue was to deliver a 500 kW packaged boiler, bunded fuel tank, air handling units and portable heaters. The boiler was deployed outside the main structure, with hoses connected to a series of air handlers located indoors.

Several DE25 and DE95 electric heaters were set-up backstage to ensure conditions within the changing areas and cloakroom were warm enough for guests and performers. These were then supplemented by three over-door heaters - ensuring temperatures were kept at the desired level throughout.

The high profile nature of this project meant that a unique system designed to particular specifications had to be implemented at short notice. Due largely to our unrivalled expertise of the events industry, we were able to recommend and install a suitable hire package that was commissioned for operation within hours of our arrival.

View full case study

distributed by