Situated in the hi-tech heart of China's Ningdong Energy Chemical Industry Park, the world's largest indirect liquefaction processing facility covers 2.8 square miles and required an investment of US$100 billion. Shenhua Ningxia Coal Industry Group Ltd chose HQCEC* to engineer and design the plant using AVEVA PDMS.

'This national demonstration project is a landmark event for China's coal oil and chemical industry,' said Zhongyang Li, chief engineer at HQCEC.
The ecology-friendly Ningdong chemical industry base has superior coal, land, water and communications resources. The Shenhua project includes a coal gasification plant, a synthetic oil plant, catalyst plant, and installations for all other processes.

The upstream module has a staggering output of 4 million tons of oil per year. The downstream module uses 1 million tons of naphtha and other olefin production - produced by the upstream project - to make fine chemical products. The system is huge and working conditions are complex.

Aveva Group plc published this content on 24 February 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 24 February 2017 18:03:01 UTC.

Original documenthttp://discover.aveva.com/china-hqcec-designs-worlds-largest-coal-liquefaction-construction-plant-with-aveva-solutions

Public permalinkhttp://www.publicnow.com/view/BBEA25EA61449DD033E09D5BF109DE8E8C6286C5