Microsoft Word - Monthly Drilling Report - November 2014 (2)

For Immediate Release - 3 December 2014

Ref. #091/14

ASX Ltd/SGX Singapore Exchange Ltd Companies Announcement Office Electronic Lodgement System

Highlights:

13 wells drilled at a success rate of 85%

November 2014

Bauer field pad well development continuing to produce results above expectations, with 2P

reserve increases expected

SACB JV close space infill drilling program near completion

DEVELOPMENT

Australia - Cooper and Eromanga Basins

Operated

PEL 91

(Beach 40%, Drillsearch 60%)

A six well development campaign is near completion at the Bauer field. This campaign is the first phase of a full field development plan aimed to support past record levels of production through the development of the highly productive Namur Sandstone reservoir. The current six well drilling campaign comprises four deviated wells drilled from a single pad location and two vertical wells.
The Bauer pad drilling campaign involves the Bauer-16 to -19 wells. This pad drilling approach involves drilling wells in close proximity without the need for rig re-mobilisation. A 'sideways walk' of the rig achieves savings in terms of footprint, drilling time and costs. As an example, the sideways rig walk from Bauer-16 to -17 was completed in two hours, a record for the Cooper Basin. Consequently, the full four well pad program is expected to be completed within 30 days.
The first of the four pad wells, Bauer-19, intersected the top of the Namur reservoir 4.7 metres high to prognosis, with 8.7 metres of net oil pay, with an additional 4.0 metre oil bearing gross interval of overlying McKinlay member. The second of the pad wells, Bauer-16, intersected the top of the Namur reservoir 1.0 metre low to prognosis, with 3.5 metres of net oil pay and an additional 4.0 metre oil bearing gross interval of overlying McKinlay member. This was followed by Bauer-17, which intersected the top of the Namur 3.5 metres high to prognosis, with 5.4 metres of net oil pay and a 4.2 metre oil bearing gross interval of overlying McKinlay member.

Monthly Drilling Report - November 2014


Bauer-16, -17 and -19 were cased and suspended as future oil producers. Bauer-18 is the final pad well and is expected to reach total depth this weekend.
The first of the two vertical wells, Bauer-14, was drilled in October 2014 in the central part of the field and intersected the top Namur reservoir 0.6 metres low to prognosis. The well was cased and suspended as a future McKinlay oil producer based on a 4.1 metre gross oil bearing interval. The well was perforated in the McKinlay member and flow tested at ~250 barrels of oil per day ("bopd") over a four hour period. The Namur reservoir was observed to be swept due to offset production. The second vertical well, Bauer-15, was drilled in the northern part of the field in November and intersected the top of the Namur reservoir 2.2 metres high to prognosis, with 5.1 metres of net oil pay. Flow testing over a half hour period produced a flow rate of ~5,000 bopd from the Namur Sandstone.

Non-operated

South Australian Gas

(Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

During calendar years 2013 and 2014, the gas development program on the South Australian side of the Cooper Basin has primarily focused on close space infill drilling at the Cowralli, Moomba North and Big Lake fields. The infill drilling campaign is targeting the conversion of undeveloped reserves to developed reserves to enable ramp-up of gas production in 2015. The campaign for calendar year
2014 is near completion and the operator is expected to provide the production ramp-up profile in
December 2014.
During November, drilling focused on five wells in the Big Lake field. Big Lake-121, -122 and -123 were drilled on a single pad in the central area of the field. Big Lake-131 and -132 are standalone wells in the south-west sector of the field. Positive results from these wells will de-risk future drilling in the area. During the month, Big Lake-121, -122 and -131 were cased and suspended as future Permian gas producers and Big Lake-123 and -132 are currently drilling ahead.
The Nephrite South field is located north-west of Moomba and towards the western boundary of the SACB JV permit area. During November, Nephrite South-10, the first of a four well pad program, was spudded and is currently drilling ahead. Development drilling in the Nephrite South field is consistent with the joint venture's objective for more geographically widespread drilling relative to the close space infill drilling conducted near Moomba during 2013 and 2014. Up to four development wells are planned for Nephrite South in calendar year 2015.

Queensland Gas

(Beach 23.2%, Santos 60.06% and operator, Origin 16.5%, Australia Pacific LNG Ltd 0.24%)

The Durham Downs North-4 development well was drilled on a small culmination in the north-west sector of the field. The well confirmed gas pay in the Toolachee and Patchawarra Formations and as
a result was cased and suspended.

Page 2 of 6

Monthly Drilling Report - November 2014

EXPLORATION and APPRAISAL

Australia - Cooper and Eromanga Basins

Operated

PEL 106

(Beach 50%, Drillsearch 50%)

A four well exploration and appraisal campaign is currently underway, targeting gas and gas liquids in the Patchawarra Formation and Tirrawarra Sandstone. The program is proximal to the existing Canunda field and gas pipeline to Middleton.
Canunda-2, the first well in the program, was cased and suspended in October2014. Maupertuis-1, the second well in the program, was spudded in November with oil fluorescence and moderate gas shows in the Tirrawarra Sandstone detected during drilling. The well was cased and suspended, with Beach electing not to participate. Antechamber-1 is the next well in the program and is expected to spud in December 2014.

Non-operated

SACB JV deep natural gas

(Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

The Gaschnitz-3 vertical well was cased and suspended in November after confirming log gas pay in the Toolachee, Epsilon and Patchawarra Formations and Tirrawarra Sandstone. The objective of this well is to further evaluate all unconventional lithotypes, including tight sand, shale and deep coal targets.
The rig has now moved to the Gaschnitz-2 well location, the last well in the 2014 Gaschnitz drilling campaign. Fracture stimulation of the three Gaschnitz wells across multiple lithologies is planned for
2015. Details of the fracture stimulation program are still to be agreed by the joint venture partners.
Other potential SACB JV deep natural gas activities during the 2015 calendar year (subject to joint venture approval) may include: 1. drilling, fracture stimulation and testing of one well located on a structural high within the Nappamerri Trough, targeting an interpreted 'sweet spot' for permeability and natural fracturing, and 2. completion of the fracture stimulation program at Van der Waals-1, with a possible further nine stages and subsequent flow testing (multiple lithologies / stacked targets).

South Australian Gas

(Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

The Swan Lake-11 appraisal well was drilled in the north-east sector of the field and confirmed gas pay in the Toolachee, Epsilon and Patchawarra Formations and Tirrawarra Sandstone, and was subsequently cased and suspended. As a result, the field limit was extended and the results of this well have de-risked planned future development drilling. Development drilling in the Swan Lake field is consistent with the joint venture's objective for more geographically widespread drilling relative to the close space infill drilling conducted near Moomba during 2013 and 2014. Up to six development
wells are planned for Swan Lake in calendar year 2015.

Page 3 of 6

Monthly Drilling Report - November 2014

Queensland oil

The Tickalara-28 appraisal well (Beach 30%, Santos 70%) was spudded on 26 October 2014 with the aim of appraising the north-east area of the Tickalara field, targeting the McKinlay Formation on the down-dip flank of the field. The well encountered approximately 1.4 metres of net pay in the McKinlay Formation but was plugged and abandoned due to the result being sub-economic.
The Munro-8 appraisal well (Beach 40%, Santos 60%) was spudded during November to appraise the northern extent of the Munro field. The primary target was the Birkhead Formation, which had no evident pay on wireline logs. However, an approximate two metre net pay sand was encountered in the Mid-Namur Sandstone and the well was subsequently cased and suspended as a future Mid- Namur oil producer.

Egypt Abu Sennan Concession

(Beach 22%, Kuwait Energy 50% and operator, Dover 28%)

The ASH-1X exploration well continued drilling ahead during November. The well is at a current depth of 3,520 metres, targeting the Alam El Bueib / Khatatba and Abu Roash "C" and "E" members.
Al Jahraa-3 testing is currently underway on the Abu Roash "C" member. The appraisal well intersected seven metres of net pay in the Abu Roash "C" member and this zone was tested for 11
hours at a rate equivalent to 1,385 barrels of oil per day.

Monthly Drilling Report - Period ending 06:00, 1 December 2014

Well

Participants

Progress and summary

Primary targets

Bauer-15

Cooper Basin operated

BPT* 40.00% Drilling this m onth: 1,321 m etres McKinlay Mem ber

PPL 253 (ex PEL 91) Oil developm ent Cooper, SA

DLS 60.00% Current depth: Status :

1,721 m etres (total depth)

Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

Nam ur Sands tone

Bauer-16 (Pad)

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,515 m etres

Current depth: 1,515 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

PPL 253 (ex PEL 91)

Oil developm ent

Cooper, SA

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,515 m etres

Current depth: 1,515 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

Bauer-17 (Pad)

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,583 m etres

Current depth: 1,583 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

PPL 253 (ex PEL 91)

Oil developm ent

Cooper, SA

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,583 m etres

Current depth: 1,583 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

Bauer-18 (Pad)

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 646 m etres

Current depth: 646 m etres

Status : Drilling ahead

McKinlay Mem ber

Nam ur Sands tone

PPL 253 (ex PEL 91)

Oil developm ent

Cooper, SA

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 646 m etres

Current depth: 646 m etres

Status : Drilling ahead

McKinlay Mem ber

Nam ur Sands tone

Bauer-19 (Pad)

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,443 m etres

Current depth: 1,443 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

PPL 253 (ex PEL 91)

Oil developm ent

Cooper, SA

BPT* 40.00%

DLS 60.00%

Drilling this m onth: 1,443 m etres

Current depth: 1,443 m etres (total depth)

Status : Cas ed and s us pended as a future McKinlay Mem ber and

Nam ur Sands tone oil producer

McKinlay Mem ber

Nam ur Sands tone

Maupertuis-1

BPT* 50.00%

DLS 50.00%

Drilling this m onth: 2,814 m etres

Current depth: 2,814 m etres (total depth)

Status : Cas ed and s us pended (DLS to s ole ris k)

Patchawarra Form ation

Tirrawarra Sands tone

PPL 257 (ex PEL 106)

Gas apprais al

C/E Bas in, SA

BPT* 50.00%

DLS 50.00%

Drilling this m onth: 2,814 m etres

Current depth: 2,814 m etres (total depth)

Status : Cas ed and s us pended (DLS to s ole ris k)

Patchawarra Form ation

Tirrawarra Sands tone

Page 4 of 6

Monthly Drilling Report - November 2014


Monthly Drilling Report - Period ending 06:00, 1 December 2014

Well

Participants

Progress and summary

Primary targets

Cooper Basin non-operated

Big Lake-121

BPT

20.21%

Drilling this m onth:

229 m etres

Patchawarra Form ation

PPL 11

STO*

66.60%

Current depth:

3,175 m etres (total depth)

Tirrawarra Sands tone

Gas developm ent

C/E Bas in, SA

ORG

13.19%

Status :

Cas ed and s us pended as a future Perm ian Gas producer

Big Lake-122

BPT

20.21%

Drilling this m onth:

3,132 m etres

Patchawarra Form ation

PPL 11

STO*

66.60%

Current depth:

3,132 m etres (total depth)

Tirrawarra Sands tone

Gas developm ent

C/E Bas in, SA

ORG

13.19%

Status :

Cas ed and s us pended as a future Perm ian Gas producer

Merrim elia Form ation

Big Lake-123

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,215 m etres

Current depth: 2,215 m etres

Status : Drilling ahead

Patchawarra Form ation

Tirrawarra Sands tone

Merrim elia Form ation

PPL 11

Gas developm ent

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,215 m etres

Current depth: 2,215 m etres

Status : Drilling ahead

Patchawarra Form ation

Tirrawarra Sands tone

Merrim elia Form ation

Big Lake-131

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,340 m etres

Current depth: 3,130 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Patchawarra Form ation

Tirrawarra Sands tone

PPL 11

Gas developm ent

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,340 m etres

Current depth: 3,130 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Patchawarra Form ation

Tirrawarra Sands tone

Big Lake-132

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,912 m etres

Current depth: 2,912 m etres

Status : Drilling ahead

Patchawarra Form ation

Tirrawarra Sands tone

Merrim elia Form ation

PPL 11

Gas developm ent

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,912 m etres

Current depth: 2,912 m etres

Status : Drilling ahead

Patchawarra Form ation

Tirrawarra Sands tone

Merrim elia Form ation

Swan Lake-11

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 1,544 m etres

Current depth: 3,120 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Patchawarra Form ation

Tirrawarra Sands tone

PPL 101

Gas apprais al

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 1,544 m etres

Current depth: 3,120 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Patchawarra Form ation

Tirrawarra Sands tone

Nephrite South-10

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,454 m etres

Current depth: 2,454 m etres

Status : Drilling ahead

Patchawarra Form ation

PPL 101

Gas developm ent

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 2,454 m etres

Current depth: 2,454 m etres

Status : Drilling ahead

Patchawarra Form ation

Gaschnitz-3

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 133 m etres

Current depth: 3,939 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Toolachee Form ation

Eps ilon Form ation Patchawarra Form ation Tirrawarra Sands tone

PPL 101

Unconventional

C/E Bas in, SA

BPT 20.21%

STO* 66.60% ORG 13.19%

Drilling this m onth: 133 m etres

Current depth: 3,939 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Toolachee Form ation

Eps ilon Form ation Patchawarra Form ation Tirrawarra Sands tone

Durham Downs Nth-4

BPT 23.20%

STO* 60.06% ORG 16.50% APL 0.24%

Drilling this m onth: 586 m etres

Current depth: 2,660 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Toolachee Form ation

Patchawarra Form ation

PL 80

Gas developm ent

C/E Bas in, QLD

BPT 23.20%

STO* 60.06% ORG 16.50% APL 0.24%

Drilling this m onth: 586 m etres

Current depth: 2,660 m etres (total depth)

Status : Cas ed and s us pended as a future Perm ian Gas producer

Toolachee Form ation

Patchawarra Form ation

Tickalara-28

BPT 30.00%

STO* 70.00%

Drilling this m onth: 0 m etres

Current depth: 1,554 m etres (total depth) Status : Plugged and abandoned

McKinlay Mem ber

PL 34

Oil apprais al

C/E Bas in, QLD

BPT 30.00%

STO* 70.00%

Drilling this m onth: 0 m etres

Current depth: 1,554 m etres (total depth) Status : Plugged and abandoned

McKinlay Mem ber

Munro-8

BPT 40.00%

STO* 60.00%

Drilling this m onth: 1,515 m etres

Current depth: 1,515 m etres (total depth)

Status : Cas ed and s us pended as a future Birkhead Form ation oil producer

Bas al Birkhead

PL 55

Oil apprais al

C/E Bas in, QLD

BPT 40.00%

STO* 60.00%

Drilling this m onth: 1,515 m etres

Current depth: 1,515 m etres (total depth)

Status : Cas ed and s us pended as a future Birkhead Form ation oil producer

Bas al Birkhead

International

ASH-1X

BPT 22.00%

KEE* 50.00% DOV 28.00%

Drilling this m onth: 2,823 m etres

Current depth: 3,520 m etres

Status : Drilling ahead

Alam El Bueib / Khatatba

Abu Roas h C, E

Abu Sennan

Oil exploration

Egypt, Wes tern Des ert

BPT 22.00%

KEE* 50.00% DOV 28.00%

Drilling this m onth: 2,823 m etres

Current depth: 3,520 m etres

Status : Drilling ahead

Alam El Bueib / Khatatba

Abu Roas h C, E

Al Jahraa-3

BPT 22.00%

KEE* 50.00% DOV 28.00%

Drilling this m onth: 664 m etres

Current depth: 3,321 m etres (total depth) Status : Press ure testing

Abu Roas h C, D, E

Abu Sennan

Oil Appraisal

Egypt, Wes tern Des ert

BPT 22.00%

KEE* 50.00% DOV 28.00%

Drilling this m onth: 664 m etres

Current depth: 3,321 m etres (total depth) Status : Press ure testing

Abu Roas h C, D, E

( * ) Operator

ORG Origin Energy Ltd DOV Dover Investments Ltd

BPT Beach Energy Ltd STO Santos Ltd

DLS Drillsearch Energy Ltd APL A ustralia Pacif ic LNG Ltd

KEE Kuw ait Energy Egypt Ltd

Page 5 of 6


Monthly Drilling Report - November 2014

South

Australia

Queensland

COOPER BASIN

!( Durham Downs North-4

Bauer-15,-16,-17,-18,-19

Nephrite South-10

!(!(!(!(!( !( Gaschnitz-3

!(

!( !(

Maupertius-1

Swan Lake-11

0 20 40 60 80

Kilometres

Big Lake-121,-122,-123,-131,-132 !(!( !(!(!(

!( Tickalara-28

!( Munro-8

!( Oil well

!( Gas well

Beach operated permits

SACB and SWQ JVs permits

Beach non-operated permits

CE14-0193

NSW

COOPER BASIN WELLS NOVEMBER 2014

Badr El Din 05

Badr El Din 04

Badr El

Abu El Gharadig NE

Sheiba 18 1

EGYPT

Badr El Din 01

Abu El Gharadig

Din 11

Westn Desert 33

BW 1

Al Jahraa-3

Abo Senan

Gpt

Southwest

GPT

GPZZ GPY

Abu Sennan

ASH-1X

Westn Desert

33/15

ABU SENNAN

Baraka NE

Oil well

0 10 20

30 km

El Diyur

West

Beach Energy development lease

Beach Energy permit

Oil field/pipeline

Gas field/pipeline

Neil Gibbins

Chief Operating Officer

For more information, contact the following on +61 8 8338 2833

Corporate

Neil Gibbins Chief Operating Officer

Investor Relations

Chris Jamieson General Manager Investor Relations
Derek Piper Investor Relations Manager

Page 6 of 6