For immediate release - 6 July 2016
Ref. #045/16
ASX Ltd
Companies Announcement Office Electronic Lodgement System
June 2016AUSTRALIA - COOPER AND EROMANGA BASINS DEVELOPMENT
South Australian Gas (Fixed Factor Area Joint Venture: Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)A five‐well development campaign progressed in the Tirrawarra - Gooranie Field, which is located approximately 50 kilometres north of the Moomba processing facility. The 2011 Patchawarra Study and subsequent drilling campaigns identified potential for further development of this area. The current campaign is targeting gas and gas liquids within the Patchawarra Formation and oil within the basal Patchawarra Formation and Tirrawarra Sandstone. The second and third wells of the campaign, Tirrawarra‐92 and Tirrawarra‐91, respectively, were cased and suspended as future producers following high‐side gas and oil pay outcomes, as summarised below.
Gas | Oil | |
Well Zone Net Pay Gross Section Zone Net Pay Gross Section (metres) (metres) (metres) (metres) | ||
Tirrawarra‐92 | Patchawarra 39 309 | Patchawarra 9 11 |
Tirrawarra 27 32 | ||
Tirrawarra‐91 | Patchawarra 45 372 | Patchawarra 6 11 |
Tirrawarra 24 39 |
The fourth well of the campaign, Tirrawarra‐90, was spudded subsequent to month‐end.
EXPLORATION AND APPRAISAL
Queensland Gas (Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)A three‐well appraisal campaign progressed in the Coolah Complex, which is located approximately 50 kilometres north of the Ballera processing facility. The campaign aims to appraise field limits and collect sufficient information to form a development plan for the Coolah Field. The campaign is targeting sands within the Toolachee Formation, with the Patchawarra Formation providing a secondary target. Targets were identified from 3D seismic acquired over the Coolah area in 2015, which complemented past 3D seismic across the Barrolka Field to the north and Durham Downs Field to the south. The first two wells of the campaign, Dunadoo‐1 and Coolah‐3, respectively, were cased and suspended as future producers following identification of gas pay in the Toolachee Formation, which was in line with pre‐drill estimates. Dunadoo‐1 encountered net gas pay of 15 metres within a 71 metre gross section, and Coolah‐3 encountered net gas pay of 16 metres within a 74 metre gross section. The final well of the campaign, Coolah‐4, was spudded subsequent to month‐end.
EGYPT
EXPLORATION AND APPRAISAL
Abu Sennan Concession (Beach 22%, Kuwait Energy 50% and operator, Dover 28%)The Al Jahraa SE‐1X oil exploration well is located approximately six kilometres southeast of the Al Jahraa‐1 discovery well. The well reached total depth of 3,361 metres in the Bahariya Formation and will be cased and completed. The well intersected approximately 16.4 metres of net pay within the target Abu Roash "C" Member, secondary Abu Roash "E" Member and secondary Upper Bahariya Formation. Production testing is currently underway.
Monthly Drilling Report - Period ended 06:00, 1 July 2016Well | Participants | Progress and Summary | Primary Targets |
Cooper Basin non‐operated | |||
Tirrawarra‐92 | BPT 20.21% STO* 66.60% ORG 13.19% | Drilling this month: 130 metres Current depth: 3,620 metres (total depth) Status: Ca sed and suspended as a future Pe rmian oil and gas producer | Patchawarra Formation Tirrawarra Sandstone |
PPL 20 Gas development C/E Basin, SA |
Tirrawarra‐91 | BPT 20.21% STO* 66.60% ORG 13.19% | Drilling this month: 3,157 metres Current depth: 3,157 metres (total depth) Status: Ca sed and suspended as a future Pe rmian oil and gas producer | Patchawarra Formation Tirrawarra Sandstone |
PPL 20 Gas Development C/E Basin, SA |
Dunadoo‐1 | BPT 23.20% STO* 60.06% ORG 16.74% | Drilling this month: 326 metres Current depth: 2,717 metres (total depth) Status: Cased and suspended as a future Pe rmian gas producer | Toolachee Formation |
PL 156 Gas appraisal C/E Basin, Ql d |
Coolah‐3 | BPT 23.20% STO* 60.06% ORG 16.74% | Drilling this month: 2,706 metres Current depth: 2,706 metres (total depth) Status: Cased and suspended as a future Pe rmian gas producer | Toolachee Formation |
PL 155 Gas appraisal C/E Basin, Ql d |
Egypt | |||
Al Jahraa SE‐1X | BPT 22.00% KEE* 50.00% DOV 28.00% | Drilling this month: 1,261 metres Current depth: 3,361 metres (total depth) Status: Running tests | Abu Roash "C" |
Abu Sennan Oil exploration Western Desert, Egypt |
( * ) Operator | DOV Dover Investments | ORG Origin Energy Ltd |
BPT Beach Energy Ltd | KEE Kuwa i t Energy | STO Santos Ltd |
Under delegation of authority for:
Mike DoddGroup Executive Exploration and Development
For more information, contact the following on +61 8 8338 2833 Corporate
Janet Skinner Manager Growth
Investor Relations:Derek Piper Investor Relations Manager
Beach Energy Limited published this content on 06 July 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 06 July 2016 00:50:03 UTC.