Microsoft Word - ASX Release - Monthly Drilling Report - May 2016.docx For immediate release - 1 June 2016

Ref. #038/16

ASX Ltd

Companies Announcement Office Electronic Lodgement System

May 2016

AUSTRALIA - COOPER AND EROMANGA BASINS DEVELOPMENT

South Australian Gas

(Fixed Factor Area Joint Venture: Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

A five-well development campaign progressed in the Tirrawarra - Gooranie Field, which is located approximately 50 kilometres north of the Moomba gas processing facility. The 2011 Patchawarra Study and subsequent drilling campaigns identified potential for further development of this area. The current campaign is targeting gas and gas liquids within the Patchawarra Formation and oil within the Tirrawarra Sandstone. The first well of the campaign, Tirrawarra-93, was cased and suspended as a future producer following a high-side gas pay outcome. The well encountered net gas and oil pay of 51 metres and 10 metres, respectively, within a 337 metre gross section in the Patchawarra Formation. The well also intersected 24 metres of net oil pay within a 33 metre gross section in the Tirrawarra Sandstone. The second well of the campaign, Tirrawarra-92 was spudded on 18 May 2016 and is currently drilling ahead at 3,490 metres in the Patchawarra Formation.

EXPLORATION AND APPRAISAL

Queensland Gas

(Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)

A three-well appraisal campaign commenced in the Coolah Complex, which is located approximately 50 kilometres north of the Ballera gas processing facility. The campaign aims to appraise field limits, convert existing contingent resources into reserves for future development, and collect sufficient information to form a development plan for the Coolah Field. Targets were identified from 3D seismic acquired over the Coolah area in 2015, which complemented past 3D seismic across the Barrolka Field to the north and Durham Downs Field to the south. Dunadoo-1, the first well of the campaign, is targeting sands within the Toolachee Formation, with the Patchawarra Formation providing a secondary target. The well was spudded on 25 May 2016 and is currently drilling ahead at 2,391 metres in the Nappamerri Group.

A three-well appraisal campaign was completed in the Durham Downs Complex, which is located approximately 30 kilometres north of the Ballera gas processing facility. The campaign was undertaken following studies which identified potential to appraise and develop new reserves within the Toolachee Formation. The final well of the campaign, Durham Downs North-6, was cased and suspended as a future producer following a high-side gas pay outcome. The well encountered 30 metres of net gas pay within a 95 metre gross section in the target zone. The joint venture will evaluate results from the campaign to determine potential for further drilling in the area.

EGYPT

EXPLORATION AND APPRAISAL

Abu Sennan Concession

(Beach 22%, Kuwait Energy 50% and operator, Dover 28%)

The Al Jahraa SE-1X oil exploration well is located approximately six kilometres southeast of the Al Jahraa-1 discovery well, and was spudded on 20 May 2016. The well is testing a three-way dip closure, with the Abu Roash "C" Member the primary target and Abu Roash "D" and "E" members providing secondary targets. Al Jahraa SE-1X is currently drilling ahead at 2,100 metres in the Khoman Formation.

Monthly Drilling Report - Period ended 06:00, 1 June 2016

Well

Participants

Progress and Summary

Primary Targets

Cooper Basin non-operated

Tirrawarra-92

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 3,490 metres Current depth: 3,490 metres

Status: Drilling ahead

Patchawarra Formation Tirrawarra Sandstone

PPL 20

Gas development C/E Basin, SA

Tirrawarra-93

BPT 20.21%

STO* 66.60%

ORG 13.19%

Drilling this month: 1,373 metres

Current depth: 3,189 metres (total depth)

Status: Cased and suspended as a future Permian oil and gas producer

Patchawarra Formation Tirrawarra Sandstone

PPL 20

Gas development C/E Basin, SA

Dunadoo-1

BPT 23.20%

STO* 60.06%

ORG 16.74%

Drilling this month: 2,391 metres Current depth: 2,391 metres

Status: Drilling ahead

Toolachee Formation

PL 156

Gas appraisal C/E Basin, Qld

Durham Downs North-6

BPT 23.20%

STO* 60.06%

ORG 16.74%

Drilling this month: 2,640 metres

Current depth: 2,640 metres (total depth)

Status: Cased and suspended as a future Permian gas producer

Toolachee Formation

PL 80

Gas appraisal C/E Basin, QLD

Egypt

Al Jahraa SE-1X

BPT 22.00%

KEE* 50.00%

DOV 28.00%

Drilling this month: 2,100 metres Current depth: 2,100 metres

Status: Drilling ahead

Abu Roash C Abu Roash D/E

Abu Sennan

Oil exploration

Western Desert, Egypt

( * ) Operator

ORG Origin Energy Ltd

DOV Dover Investments

BPT Beach Energy Ltd

STO Santos Ltd

KEE Kuwait Energy

Mike Dodd

Group Executive Exploration and Development

For more information, contact the following on +61 8 8338 2833 Corporate: Mike Dodd, Group Executive Exploration and Development Investor Relations: Derek Piper, Investor Relations Manager

Beach Energy Limited published this content on 01 June 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 01 June 2016 05:16:06 UTC.