• [ Date:2015-11-30 Visits:1 ]

  •   China Construction Eighth Engineering Pision Corp., Ltd (CSCEC 8th Bureau) has recently cut through successfully the Dahua Road Tunnel in Yuzhong District of Chongqing.
    The Project is a spiral double-track tunnel in urban high drop (nearly 60m), with the left line being 415m and a radius of 100m. The right line, belonging to a minor radius spiral tunnel, has the length of about 475m and a radius of 110m.
    The spiral rotary tunnel is rare in China, and upon its completion, it will facilitate travelling of the local residents in Yuzhong District. (from CSCEC 8th Bureau)

    【print】 【closed】
distributed by