• [ Date:2016-08-23 Visits:2 ]

  •   On August 18, China Station Construction Engineering Corporation Ltd (CSCEC) won the bid for the lump-sum contract of Package ZFZQ-1 for railway line constructing of Anhui Section from Zhengzhou to Zhoukou and finally to Fuyang. The contract value amounts to RMB2.7 billion.
    Located in Anhui and as an important component of Zhengzhou-Hefei High-speed Railway, the Project extends 32.8km in total and mainly consists of the roadbeds, bridges and culverts, etc. (from Infrastructure Operations & CSCEC Communications)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 23 August 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 25 August 2016 01:39:07 UTC.

Original documenthttp://english.cscec.com/art/2016/8/23/art_211_296722.html

Public permalinkhttp://www.publicnow.com/view/E65FE1732154A0D01B91347E9D96A89345D4BC85