• [ Date:2016-12-07 Visits:1 ]

  •   On November 30, the main line viaduct bridge in the reconstruction project of Wuhan-Xianning Highway (The Third Ring Road to Hongxia Village) undertaken by China Construction Third Engineering Bureau Corp., Ltd. (CSCEC 3rd Bureaun) was open to traffic.
    Located on Baishazhou Avenue in Wuhan, the 3.6km-long project involves the contract value of about RMB900 million, and the main line viaduct bridge is 2.2 km long. As an artery in the city, the project, once completed, will connect the main urban area of Wuhan to highways surrounding the city, and make it easier for people to go out of the city through the South Gate. (from CSCEC 3rd Bureau)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 07 December 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 07 December 2016 14:26:07 UTC.

Original documenthttp://english.cscec.com/art/2016/12/7/art_211_320565.html

Public permalinkhttp://www.publicnow.com/view/9E7AAE8DFE45DF1E5A6D763DD65CC83872993ED5