Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

4-Traders Homepage  >  Equities  >  Tokyo  >  Electric Power Development Co., Ltd.    9513   JP3551200003

No quotes available
-- JPY   --.--%
01/31 RELEASE OF FINA : 219kb)
01/12 J-POWER ACQUIRE : 120kb)
2016 ELECTRIC POWER : Toshiba awarded turbine supply contract for China`..
SummaryChartsNewsAnalysisCalendarCompanyFinancialsConsensusRevisions 
News SummaryMost relevantAll newsSector newsTweets 

Electric Power Development Co., Ltd. : Status of No.2 Unit Turbine Inspection at Takehara Thermal Power Plant (PDF:447KB).

share with twitter share with LinkedIn share with facebook
share via e-mail
0
01/18/2013 | 12:43pm CET

January 18, 2013
Electric Power Development Co., Ltd.

Status of No. 2 Unit Turbine Inspection at Takehara Thermal Power Plant

As Electric Power Development Co., Ltd. (hereinafter "J-POWER") previously announced on December 19, operation of the No. 2 Unit of Takehara Thermal Power Plant (location: Takehara, Hiroshima Prefecture, rated unit output: 350MW) was suspended on December 18 following detection of a
malfunction in the turbine.
Subsequent dismantling and inspection of the turbine and the individual pieces of equipment confirmed damage to the shaft of the main oil pump1, which is attached to the main turbine, and abrasion damage on the impeller2 of the main oil pump.
J-POWER is currently investigating the cause of the damage and abrasion, and is working to repair the shaft and impeller of the main oil pump. Going forward, J-POWER will work to ensure the quickest possible restoration of operations, but because time will be needed to replace the damaged shaft and impeller of the main oil pump, at this point operations are expected to resume sometime in early February,
2013.

1. Main oil pump: pump that supplies the control oil and bearing oil required during turbine operation.

2. Impeller: rotating bladed wheel inside pump.

(Attachment) Overview of the No. 2 Unit Turbine at Takehara Thermal Power Plant
(Attachment)

Overview of the No. 2 Unit Turbine at Takehara Thermal Power Plant High-pressure turbine Medium-pressure turbine Low-pressure turbine Generator Damaged area

Main oil pump

Main oil pump impeller Main oil pump shaft
distributed by
share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on ELECTRIC POWER DEVELOPMENT
01/31 RELEASE OF FINANCIAL STATEMENTS FOR : 219kb)
01/12 J-POWER ACQUIRES EQUITY INTEREST IN : 120kb)
2016 DYNEGY : Completes Sale of Elwood Energy Facility
2016 ELECTRIC POWER DEVELOPMENT : Toshiba awarded turbine supply contract for China`s..
2016 NOTICE CONCERNING POSTING OF DIVIDEN : 66kb)
2016 ELECTRIC POWER DEVELOPMENT CO., LTD. : ex-dividend day for interim dividend
2016 NOTICE CONCERNING REVISION TO THE NO : 14kb)
2016 ELECTRIC POWER DEVELOPMENT : Kyodo Top12 News
2016 ELECTRIC POWER DEVELOPMENT : J-Power postpones plan to begin Oma nuclear plant o..
2016 Electric Power Development Co., Ltd. - J-Power agrees to acquire additional i..
More news
Sector news : Fossil Fuel Electric Utilities
04:05a Politics weigh as Korea's KEPCO eyes the Toshiba nuclear option
03/23 SSE increases stake in UK Dogger Bank offshore wind development
03/22 South Korea's KEPCO in talks to buy Toshiba's stake in UK nuclear project NuG..
03/21DJPOWER ASSETS : 2016 Net Profit Down 17% at HK$6.42 Billion
03/17 Enel says not right time for big deals in European power
More sector news : Fossil Fuel Electric Utilities
Advertisement
Financials ( JPY)
Sales 2017 725 921 M
EBIT 2017 -
Net income 2017 38 133 M
Debt 2017 1 455 747 M
Yield 2017 2,70%
P/E ratio 2017 12,50
P/E ratio 2018 10,93
EV / Sales 2017 2,66x
EV / Sales 2018 2,48x
Capitalization 474 468 M
More Financials
Chart ELECTRIC POWER DEVELOPMENT
Duration : Period :
Electric Power Development Technical Analysis Chart | 9513 | JP3551200003 | 4-Traders
Full-screen chart
Technical analysis trends ELECTRIC POWER DE...
Short TermMid-TermLong Term
TrendsBearishBullishNeutral
Technical analysis
Income Statement Evolution
More Financials
Consensus
Sell
Buy
Mean consensus OUTPERFORM
Number of Analysts 10
Average target price 3 322  JPY
Spread / Average Target 28%
Consensus details
EPS Revisions
More Estimates Revisions
Managers
NameTitle
Toshifumi Watanabe President & Representative Director
Masayoshi Kitamura Chairman
Hiroshi Sasatsu Executive Officer & Manager-Technology Development
Hisanori Shizuma Manager-Nuclear Power Technology
Junji Nagashima Representative Director, VP & GM-Nuclear Power
More about the company
Sector and Competitors
1st jan.Capitalization (M$)
ELECTRIC POWER DEVELOP..-3.71%4 261
NTPC LIMITED-2.39%20 712
UNIPER SE12.81%5 828
GUANGZHOU DEVELOPMENT ..-15.51%3 748
SHANGHAI ELECTRIC POWE..-1.07%3 727
YUNIPRO PAO--.--%2 921
More Results