Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 

4-Traders Homepage  >  Equities  >  Tokyo  >  Electric Power Development Co., Ltd.    9513   JP3551200003

SummaryChartsNewsAnalysisCalendarCompanyFinancialsConsensusRevisions 
News SummaryMost relevantAll newsSector news 

Electric Power Development Co., Ltd. : Status of No.2 Unit Turbine Inspection at Takehara Thermal Power Plant (PDF:447KB).

share with twitter share with LinkedIn share with facebook
share via e-mail
0
01/18/2013 | 12:43pm CEST

January 18, 2013
Electric Power Development Co., Ltd.

Status of No. 2 Unit Turbine Inspection at Takehara Thermal Power Plant

As Electric Power Development Co., Ltd. (hereinafter "J-POWER") previously announced on December 19, operation of the No. 2 Unit of Takehara Thermal Power Plant (location: Takehara, Hiroshima Prefecture, rated unit output: 350MW) was suspended on December 18 following detection of a
malfunction in the turbine.
Subsequent dismantling and inspection of the turbine and the individual pieces of equipment confirmed damage to the shaft of the main oil pump1, which is attached to the main turbine, and abrasion damage on the impeller2 of the main oil pump.
J-POWER is currently investigating the cause of the damage and abrasion, and is working to repair the shaft and impeller of the main oil pump. Going forward, J-POWER will work to ensure the quickest possible restoration of operations, but because time will be needed to replace the damaged shaft and impeller of the main oil pump, at this point operations are expected to resume sometime in early February,
2013.

1. Main oil pump: pump that supplies the control oil and bearing oil required during turbine operation.

2. Impeller: rotating bladed wheel inside pump.

(Attachment) Overview of the No. 2 Unit Turbine at Takehara Thermal Power Plant
(Attachment)

Overview of the No. 2 Unit Turbine at Takehara Thermal Power Plant High-pressure turbine Medium-pressure turbine Low-pressure turbine Generator Damaged area

Main oil pump

Main oil pump impeller Main oil pump shaft
distributed by
share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on ELECTRIC POWER DEVELOPMENT
07/29 RELEASE OF FINANCIAL STATEMENTS FOR : 110kb)
06/08 SIEMENS : To Supply Turbines For Onshore Wind Power Plant In Japan
06/07 ELECTRIC POWER DEVELOPMENT : Siemens to supply turbines for wind project in Japa..
06/03 J-POWER ANNOUNCES EXECUTION OF LOAN : 128kb)
04/28 OUTLINE OF FISCAL 2016 ELECTRIC POWE : 21kb)
04/27 OUTLINE OF FISCAL 2016 ELECTRIC POWE : 40kb)
04/22 KANSAI ELECTRIC POWER : Cooperation between Electric Power Companies in Nuclear ..
04/12 ELECTRIC POWER DEVELOPMENT : Notice Regarding Change in Way to Release on Unplan..
03/31 ELECTRIC POWER DEVELOPMENT : Plans for Appointment of Directors (PDF:26KB)
03/29 ELECTRIC POWER DEVELOPMENT CO., LTD. : ex-dividend day for final dividend
More news
Sector news : Fossil Fuel Electric Utilities
04:05pDJSunEdison to Sell Some Assets to GCL-Poly Energy -- Update
12:16pDJSunEdison to Sell Some Assets to GCL-Poly Energy
06:55aDJTyphoon Lionrock Closes In on Japan
08/26DJTXU Energy, Luminant Cleared to Exit Bankruptcy
08/25 Britain's Big Six energy suppliers stem customer exodus as prices rebound
More sector news : Fossil Fuel Electric Utilities
Advertisement
Financials ( JPY)
Sales 2017 721 851 M
EBIT 2017 -
Net income 2017 39 911 M
Debt 2017 1 486 270 M
Yield 2017 2,80%
P/E ratio 2017 11,60
P/E ratio 2018 10,18
EV / Sales 2017 2,69x
EV / Sales 2018 2,66x
Capitalization 457 628 M
More Financials
Chart ELECTRIC POWER DEVELOPMENT
Duration : Period :
Electric Power Development Technical Analysis Chart | 9513 | JP3551200003 | 4-Traders
Full-screen chart
Technical analysis trends ELECTRIC POWER DE...
Short TermMid-TermLong Term
TrendsNeutralBearishBearish
Technical analysis
Income Statement Evolution
More Financials
Consensus
Sell
Buy
Mean consensus OUTPERFORM
Number of Analysts 12
Average target price 3 639  JPY
Spread / Average Target 46%
Consensus details
EPS Revisions
More Estimates Revisions
Managers
NameTitle
Toshifumi Watanabe President & Representative Director
Masayoshi Kitamura Chairman
Itaru Nakamura Director, Head-Human Resources & Finance
Hitoshi Murayama Representative Director, VP & Head-Technology
Junji Nagashima Director, VP & GM-Nuclear Power Business
More about the company
Sector and Competitors
1st jan.Capitalization (M$)
ELECTRIC POWER DEVELOP..-41.62%4 493
NTPC LIMITED0.00%19 395
GUANGZHOU DEVELOPMENT ..-36.66%3 270
YUNIPRO PAO--.--%2 758
JOINTO ENERGY INVESTME..--.--%2 520
K-ELECTRIC LTD--.--%2 342
More Results