ASX Announcement & Media Release
1 May 2017
Fast Facts
ASX Code: EMR
Shares on issue: 2,108 million Market Cap: ~$100 million
Cash: A$10.7 million (31 Mar 2017)
Board & Management
Simon Lee AO, Non-Exec Chairman Morgan Hart, Managing Director Justin Tremain, Executive Director Ross Stanley, Non-Exec Director Ross Williams, Non-Exec Director Mick Evans, Chief Operating Officer Mark Clements, Co. Secretary
Company Highlights
First mover in an emerging gold province in Cambodia
Okvau Deposit (100% owned): Indicated and Inferred Mineral Resource Estimate of 1.14Moz at 2.0g/t Au (refer Table Three)
DFS completed and demonstrates high grade, low cost, compelling development economics:
Ore Reserve of 14.3Mt & 2.0g/t Au for 0.9Mozs in a single open pit with waste:ore ratio of 5.8:1
LOM average annual production of 106,000ozs pa
AISC US$731/oz over LOM
Using US$1.250/oz Au gold price:
NPV(5%)US$223M pre-tax and US$160M post-tax
IRR 48% pa pre-tax and 40% post-tax
Payback ~2.2 years pre-tax and
2.5 years post-tax
Highly credentialed gold project development team
Significant resource growth potential.
Registered Office 1110 Hay Street West Perth WA 6005
T: +61 8 9286 6300
F: +61 8 9286 6333
W: www.emeraldresources.com.au
Okvau DFS Delivers Ore Reserve of 907,000oz Emerald to Become +100,000ozpa Gold ProducerDefinitive Feasibility Study ('DFS') confirms the 100% owned Okvau Gold Project in Cambodia as a robust and compelling project
DFS delivers an initial Ore Reserve of 14.3Mt @ 2.0g/t Au for 907,000oz at an average AISC of US$731/oz over an initial 7 year Life-of-Mine ('LOM') operating period
The DFS is based on a 2.0Mtpa plant to produce approximately 106,000oz pa on average over the initial operating LOM of over 7 years
Updated Mineral Resource estimate of 17.7Mt at 2.0g/t gold for 1.14Moz (at 0.7g/t cut-off)with 1.01Moz as Indicated and 0.13Moz as Inferred (refer Table Three)
Key operating and financial results of the DFS (US$1,250/oz gold) include1:
Development Capital Costs2
US$91M
Mining Contractor Capital & Pre-Production Mining
US$7M
US$98M
LOM C1 Cash Costs3
US$650/oz
LOM AISC4
US$731/oz
Operating Cash Flow (pre-tax)
US$419M (A$558M)
Project Cash Flow After Capital (pre-tax)
US$298M (A$397M)
NPV(5%) (pre-tax)
US$223M (A$298M)
NPV(5%) (post-tax)
US$160M (A$213M)
Payback (pre-tax)
26 months
Payback (post-tax)
30 months
IRR (pre-tax)
48% pa
IRR (post-tax)
40% pa
1 All economics are 100% attributable to Emerald. Exchange rate of US$0.75. Refer Table One for further details
2 Includes US$4.4M of capital spares and first fills
3 C1 Cash Costs include site based mining, processing and admin operating costs plus transport and refining costs
4 Includes C1 Cash Costs plus royalties, sustaining capital costs and rehabilitation & closure costs
90% of Indicated Resources converted to Ore Reserves
Low development capital intensity of US$122/oz of LOM production
NPV(5%)to Pre-Production Capital Costs ratio of2.3x
Operating margin of 46% at US$1,250/oz gold price
Targeting commencement of project development in late 4Q 2017 with gold production in early 2019
Financing plans underway, targeting conventional debt and equity funding
Emerald has cash reserves in excess of A$10M. Well placed to progress pre- development activities and exploration before project funding
Emerald Resources NL(ASX: EMR)('Emerald') is pleased to announce the completion of the DFS on the development of a 2.0Mtpa operation at its 100% owned Okvau Gold Project located in the Mondulkiri province of eastern Cambodia ('Project'). The DFS has been completed to +/-15% level of accuracy. The Board of Emerald has approved the Project to proceed to construction subject to financing arrangement and permitting, including a Mineral Investment Agreement with the Royal Government of Cambodia to support an Industrial Mining Licence.
The DFS confirms the robust nature of the Project with an initial operating LOM of over 7 years, producing approximately 106,000 ounces of gold per annum on average from a single open pit, with ore processed through a plant utilising a single stage crushing circuit and SAG mill, sulphide flotation, regrind mill followed by conventional cyanide leaching.
Key operating and financial outcomes of the DFS, prepared in accordance with the requirements of the JORC Code (2012 Edition), are presented below in Table One.
Table One | Study Results1Ore Reserve | 14.3Mt @ 2.0g/t gold for 907koz contained | ||
LOM Strip Ratio (waste t : ore t) | 5.8:1 | ||
Throughput | 2.0Mtpa | ||
Life of Mine | 7.2 years | ||
Processing Recovery | 84% | ||
Recovered Ounces | 762koz | ||
Average Annual Production | 106koz | ||
Pre-production Capital Costs2 | US$98M | ||
Sustaining Capital Costs3 | US$23M | ||
Gold Price | US$1,100/oz | US$1,250/oz | US$1,400/oz |
Gross Revenue | US$838M | US$952M | US$1,066M |
LOM Net Revenue (net of royalties4and refining) | US$801M | US$911M | US$1,020M |
Operating Cash Flow pre-tax | US$309M | US$419M | US$528M |
Project Cash Flow pre-tax | US$188M | US$298M | US$407M |
NPV(5%)pre-tax | US$133M | US$223M | US$313M |
NPV(5%)post-tax5 | US$95M | US$160M | US$224M |
Payback pre-tax | 3.0 years | 2.2 years | 1.6 years |
Payback post-tax | 3.3 years | 2.5 years | 1.8 years |
IRR pre-tax | 32% | 48% pa | 63% |
IRR post-tax5 | 27% | 40% pa | 54% |
LOM C1 Cash Costs6 | US$650/oz | US$650/oz | US$650/oz |
LOM All-In Sustaining Costs ('AISC')7 | US$725/oz | US$731/oz | US$737/oz |
1 All economics are 100% attributable to Emerald
2 Includes US$4.4M of capital spares and first fills and US$7.0M of mining capital and pre-production mining costs
3 Includes US$14.4M of rehabilitation and closure costs
4 Royalties include Government royalty of 2.5% gross and a third party royalty of 1.5% gross (capped to A$22.5M)
5 Taxation is based on current and draft Cambodian tax law and does not allow for any incentives or tax relief
6 C1 Cash Costs include site based mining, processing and admin operating costs plus transport and refining costs
7 Includes C1 Cash Costs plus royalties, sustaining capital costs, contributions to environmental & community funds and rehabilitation & closure costs
Emerald Managing Director, Morgan Hart said:"Today the Emerald team has delivered a maiden Ore Reserve of just under 1 million ounces of gold along with a DFS demonstrating the exceptional economics of the Okvau Gold Project, all of which has been achieved within 12 months of Emerald becoming formally involved in the Project. The results of the DFS, including a pre-tax NPV(5%)of approximately A$300M with an IRR of 48% pa, vindicates Emerald's decision to acquire 100% ownership of this project. Importantly, given the reserve grade of 2.0g/t and moderate strip ratio, the Project has low AISC of US$731/oz over the LOM. This will be the first large scale gold project to be developed in Cambodia. Emerald is confident this first mover status will result in a number of growth opportunities and it is very easy to envisage this Project increasing in scale and mine life." Project ImplementationEmerald will manage the construction and development of the Project with its own internal construction team. Key senior members of this team have been actively involved in the DFS and have many years' experience working together on the development of other successful gold projects, within Australia and Overseas. Certain works will be outsourced to independent consultants and contractors as required.
Cambodia is well located for the cost effective procurement of key equipment and materials. An important objective will be to maximise the extent of procurement from within Cambodia.
Table Two shown below outlines the key Project milestones being targeted by the Emerald development team.
Table Two | Okvau Gold Project Schedule2017
Q2 Q3 Q4 Q1
2018
Q2 Q3 Q4
2019
Q1
Regulatory Approvals Granted Project Funding
Commence Plant Construction Processing Plant Commissioned Commence Okvau pit mine dev't First Gold Production
assessment
ongoing discussions
process plant & infrastructure construction
open pit mining
Next StepsGiven the completion of the DFS and the targeted development commencement late in the 4thQuarter of 2017, Emerald is focussed on:
Procuring project approvals and permitting including environmental approval of the completed Environmental & Social Impact Assessment ('ESIA') and an Industrial Mining Licence which is to be supplemented with a Mineral Investment Agreement with the Royal Government of Cambodia
Securing requisite project funding
Identifying additional cost-saving measures from the forecast capital and operating expenditure
Optimising open pit staging and scheduling
Pursuing an active exploration program aimed at discovering nearby additional gold deposits that can deliver additional mill feed to the Okvau Gold Project. This will include a dedicated effort to expand Emerald's already substantial 400km2ground position. Significant progress is being made in this area.
Growth Potential Substantial opportunities exist for new gold discoveries across the broader Okvau and adjoining O'Chhung project areas covering approximately 400km2(refer Figure One). Further drilling around the Okvau Deposit and exploration targets within close proximity to the Okvau Deposit offer an opportunity to expand the existing resource inventory and add to the current production target, both in terms of annual production and mine life. The Okvau Deposit remains open to the north and north-east where anomalous gold-in-soils and geophysics indicate the potential for additional mineralisation. This DFS has only considered an open pit mining operation. The Okvau Deposit remains 'open' at depth with high grade shoots providing longer term underground potential. High grade resources have been defined immediately below the floor of the final pit design (refer Figure Two). | Figure One | Emerald Licence Position with Surface Geochemistry |
Historical drilling results beneath the DFS pit design include (refer Renaissance Minerals Ltd ASX announcement 17 September 2012):
Emerald recently drilled two deep diamond core holes to test for strike and down dip continuity of high grade gold zones intersected with previous deeper drilling. Results included (refer Figure Two): | Figure Two | Depth Potential at the Okvau Gold Deposit |
This announcement lifts the trading halt that Emerald requested on Friday 28 April 2017. Emerald is not aware of any reason why the ASX would not allow trading to recommence immediately.
Emerald Resources NL published this content on 01 May 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 01 May 2017 14:38:01 UTC.
Original documenthttp://emeraldresources.com.au/sites/emeraldresources.com.au/files/EMR0237%20-%20Okvau%20DFS%20Delivers%20Ore%20Reserve%20of%20907000oz.pdf
Public permalinkhttp://www.publicnow.com/view/D262E9F18348CD2F5D1568E37C71535D92868AC3