FGC UES (Rosseti Group) will provide first special reliability class power for the facilities of the Eastern Economic Forum (EEF 2017) on Russky island, Vladivostok.

Backup external and internal power interfaces allowing quick automatic switchover to backup power in an off-nominal event were set up in the campus of the Far Eastern Federal University.

Before the forum kickoff, uninterruptible power supplies and 12 diesel generator units were installed and connected. Their purpose is to contribute even further to reliability of power supply to the EEF facilities.

General anti-emergency drills were held.

FSK EES JSC published this content on 05 September 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 08 September 2017 11:27:09 UTC.

Original documenthttp://www.fsk-ees.ru/eng/public_relations/news/?ELEMENT_ID=219401

Public permalinkhttp://www.publicnow.com/view/0BEFAC6E58CC704EE32EB7D3954C4E1D4D75DFCC