Open Pit and Underground Indicated Resources at Wassa Grow to 3.5 Million Ounces

TORONTO, March 26, 2015 /PRNewswire/ - Golden Star is pleased to announce its Mineral Reserves and Mineral Resources as at December 31, 2014.

Highlights:


    --  Total Proven and Probable Mineral Reserves at year end are estimated to
        be 1.9 million ounces primarily as a result of the removal of the high
        cost refractory material, in addition to:
        --  removal of Prestea Underground Mineral Reserves pending completion
            of the Prestea Underground Feasibility Study on non-mechanized
            mining in mid-2015;
        --  a lower gold price assumption of $1,200 per ounce;
        --  the introduction of an underground mining concept at Wassa, which
            greatly accelerates access to high grade ore and thus improves the
            mine economics, but reduces overall reserve ounces; and
        --  2014 mining depletion
    --  Total Measured and Indicated Mineral Resources increased by 5% to 6.6
        million ounces using a gold price assumption of $1,400 per ounce
    --  Wassa Mineral Reserves grade increased 16% resulting in 24.1 million
        tonnes at 2.04 grams per ton of gold ("g/t Au") for 1.58 million ounces
    --  Wassa Measured and Indicated Mineral Resources increased 6% to 3.5
        million ounces at a 10% higher average grade of 2.21 g/t Au
    --  Mineral Reserves at Bogoso decreased to 356,000 ounces.

Sam Coetzer, President and CEO of Golden Star, commented:

"Since 2013 we have focused on developing our lower cost non-refractory targets and have moved our efforts away from the development of the Bogoso refractory production. The results of the latest reserves estimation are in line with this strategy as can be seen in the first two tables.

The results of the Wassa Underground Feasibility Study recently released have, as expected, brought about a reserve reduction and a grade increase with the change in mining concept from one large pit with slow return to a smaller pit and a high grade underground mine. The Wassa Underground deposit remains open down plunge and has great potential to grow. The Company plans to extend development as funds permit to enable conversion from Inferred Mineral Resources to Measured and Indicated Mineral Resources, and to do more exploration drilling south of existing drilling to determine the extent of the deposit.

Our focus continues to be on developing our high return non-refractory projects. The published results of the Wassa Underground Feasibility Study are positive and we expect to release the results of the Prestea Underground Feasibility Study in the second quarter, which will allow the Company to update its 2014 Mineral Reserves with the material from Prestea Underground."

The following tables provide a breakdown of the non-refractory Mineral Reserves and the refractory Mineral Reserves, respectively, at Wassa and Bogoso as at December 31, 2014 and December 31, 2013.



        Non-                 Dec 31, 2014       Dec 31, 2014     Dec 31, 2014 Proven    Dec 31, 2013 Proven and
     refractory             Proven Mineral        Probable       and Probable Mineral      Probable Mineral
      Reserves                 Reserve        Mineral Reserve           Reserve                Reserve
      --------                 -------        ---------------           -------                -------

       tonnes                   grade              ounces               tonnes             grade     ounces     tonnes      grade     ounces     tonnes      grade     ounces
       ------                   -----              ------               ------             -----     ------     ------      -----     ------     ------      -----     ------

       (000)                   g/t Au                    (000)                 (000)     g/t Au       (000)      (000)     g/t Au      (000)      (000)     g/t Au      (000)
        ----                    ------                     ----                   ----      ------        ----        ----      ------       ----        ----      ------       ----

                      Wassa                 -                 -                     -       17,831       1.42         812       17,831       1.42         812       33,721       1.72       1,863
                   Open Pit
                   --------

                      Wassa                 -                 -                     -        5,437       4.27         746        5,437       4.27         746            -         -          -
                Underground
                -----------

                 Stockpiles               820               0.73                     19             -         -          -         820       0.73          19          497       0.67          11
                 ----------               ---               ----                    ---           ---       ---        ---         ---       ----         ---          ---       ----         ---

                      Wassa                 -                 -                     -            -         -          -           -         -          -         694       4.31          96
                      Other
                      -----

                   Subtotal               820               0.73                     19        23,268       2.08       1,558       24,089       2.04       1,578       34,911       1.75       1,970
                      Wassa
                      -----

                     Bogoso                 -                 -                     -            -         -          -           -         -          -           -         -          -
                     ------               ---               ---                   ---          ---       ---        ---         ---       ---        ---         ---       ---        ---

                     Dumasi                 -                 -                     -            -         -          -           -         -          -         545       1.66          29
                     ------               ---               ---                   ---          ---       ---        ---         ---       ---        ---         ---       ----         ---

                     Mampon                 -                 -                     -          320       4.43          46          320       4.43          46          433       3.86          54
                     ------               ---               ---                   ---          ---       ----         ---          ---       ----         ---          ---       ----         ---

                    Prestea               315               2.00                     20         1,381       2.30         102        1,697       2.24         122        2,014       2.18         141
                      South
                      -----

                    Prestea                 -                 -                     -            -         -          -           -         -          -       1,434       9.61         443
                Underground
                -----------

                 Stockpiles                 -                 -                     -            -         -          -           -         -          -           -         -          -
                 ----------               ---               ---                   ---          ---       ---        ---         ---       ---        ---         ---       ---        ---

                   Subtotal               315               2.00                     20         1,702       2.70         148        2,017       2.59         168        4,427       4.69         667
                     Bogoso
                     ------

                  GSR Total             1,135               1.08                     40        24,970       2.13       1,706       26,106       2.08       1,746       39,338       2.08       2,637
                  ---------             -----               ----                    ---        ------       ----       -----       ------       ----       -----       ------       ----       -----


    * Prestea Underground is pending
     completion of a non-mechanized
     Feasibility Study in mid-2015
     which we expect will be added to
     the above non-refractory
     Mineral Reserves

The Company has down-graded most of the refractory reserves to resources, other than material remaining in the Bogoso pits and on the stockpiles, based on current gold prices.



        Refractory              Dec 31, 2014 Proven    Dec 31, 2014     Dec 31, 2014 Proven    Dec 31, 2013 Proven and
         Reserves                 Mineral Reserve    Probable Mineral   and Probable Mineral   Probable Mineral Reserve
                                                         Reserve               Reserve
    ---                                                  -------               -------

          tonnes                       grade              ounces               tonnes                    grade             ounces           tonnes              grade               ounces              tonnes                  grade                 ounce
          ------                       -----              ------               ------                    -----             ------           ------              -----               ------              ------                  -----                 -----

          (000)                       g/t Au                    (000)                 (000)            g/t Au                    (000)             (000)       g/t Au                     (000)                (000)          g/t Au                       (000)
           ----                        ------                     ----                   ----             ------                     ----               ----        ------                      ----                  ----           ------                        ----

                 Wassa Open Pit                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                 --------------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                      ---                ---           ---

                          Wassa                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                    Underground
                    -----------

                     Stockpiles                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                     ----------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                      ---                ---           ---

                    Wassa Other                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                    -----------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                      ---                ---           ---

                       Subtotal                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                          Wassa
                          -----

                         Bogoso                1,251               2.51                    101                         703             2.54                 57                1,954                2.52                   158                   4,662                  2.63          394
                         ------                -----               ----                    ---                         ---             ----                ---                -----                ----                   ---                   -----                  ----          ---

                         Dumasi                    -                 -                     -                          -               -                 -                   -                  -                    -                    8,396                2.42            653
                         ------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                    -----                ----            ---

                         Mampon                    -                 -                     -                          -               -                 -                   -                  -                    -                      700                6.09            137
                         ------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                      ---                ----            ---

                  Prestea South                    -                 -                     -                          -               -                 -                   -                  -                    -                    1,124                3.33            120
                  -------------                  ---               ---                   ---                        ---             ---               ---                 ---                ---                  ---                    -----                ----            ---

                        Prestea                    -                 -                     -                          -               -                 -                   -                  -                    -                        -                  -             -
                    Underground
                    -----------

                     Stockpiles                  405               1.82                     24                           -               -                 -                 405                1.82                    24                     106                  1.79            6
                     ----------                  ---               ----                    ---                         ---             ---               ---                 ---                ----                   ---                     ---                  ----          ---

                       Subtotal                1,656               2.34                    125                         703             2.54                 57                2,359                2.40                   182                  14,989                  2.72        1,310
                         Bogoso
                         ------

                      GSR Total                1,656               2.34                    125                         703             2.54                 57                2,359                2.40                   182                  14,989                  2.72        1,310
                      ---------                -----               ----                    ---                         ---             ----                ---                -----                ----                   ---                  ------                  ----        -----

Mineral Reserve and Mineral Resource Estimation

The Mineral Reserve and Mineral Resource estimates have been compiled by the Company's technical personnel in accordance with definitions and guidelines set out in the Definition Standards for Mineral Resources and Mineral Reserves adopted by the Canadian Institute of Mining, Metallurgy, and Petroleum and as required by Canada's National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Mineral Reserves and Mineral Resources were estimated using a gold price of $1,200 and $1,400 per ounce, respectively, as well as the other assumptions described below in this news release.

Mineral Reserves

Total Mineral Reserves as at December 31, 2014 declined to approximately 1.9 million ounces from approximately 3.9 million ounces as at December 31, 2013. The reduced gold price assumption of $1,200 per ounce used in 2014 compared to $1,300 per ounce used in 2013 has resulted in the exclusion of the Dumasi pit from Mineral Reserves as it showed very low returns on the capital invested at these gold prices. This exclusion of almost 9 million tonnes of refractory material means that the refractory plant is scheduled to be placed on care and maintenance from the end of 2015 when mining at our current Bogoso pits is expected to be complete. With this plant on care and maintenance, the additional refractory material from Mampon and Prestea South pits has also been removed from the Mineral Reserves.

Prestea Underground is currently undergoing a Feasibility Study for non-mechanized shrinkage mining. The Mineral Reserves for mechanized mining reported at the end of 2013 have been removed pending completion of the new Prestea Underground Feasibility Study in mid-2015.

The removal of the refractory material, combined with the new strategy for non-mechanized mining at Prestea Underground, which is awaiting completion of a Feasibility Study, and the mining depletion during 2014, resulted in a reduction in the total Bogoso Mineral Reserve of 82%.

At the end of 2014, the Wassa Mineral Reserve ounces decreased by 20% and tonnes decreased by 31%, while grade increased by 16%. This reduction in Mineral Reserve ounces is a result of changing our strategy from mining the deep, high grade material from a large open pit, as was the case in 2013, to developing a combined open pit and underground mining operation. Underground mining should enable us to access the high grade material much earlier in the life of the mine and will significantly improve the cash flow and mine economics compared to an open pit only operation.

The following table provides a breakdown of the Mineral Reserves at Wassa and Bogoso as at December 31, 2014 and December 31, 2013.



                        Dec 31, 2014 Proven  Dec 31, 2014 Probable  Dec 31, 2014 Proven    Dec 31, 2013 Proven and
                          Mineral Reserve       Mineral Reserve     and Probable Mineral   Probable Mineral Reserve
                                                                           Reserve
                                                                           -------

     tonnes                    grade                 ounces                tonnes             grade     ounces     tonnes      grade     ounces     tonnes      grade     ounces
     ------                    -----                 ------                ------             -----     ------     ------      -----     ------     ------      -----     ------

     (000)                    g/t Au                        (000)                 (000)     g/t Au       (000)      (000)     g/t Au      (000)      (000)     g/t Au      (000)
      ----                     ------                         ----                   ----      ------        ----        ----      ------       ----        ----      ------       ----

                  Wassa                    -                     -                     -       17,831       1.42         812       17,831       1.42         812       33,721       1.72       1,863
               Open Pit
               --------

                  Wassa                    -                     -                     -        5,437       4.27         745        5,437       4.27         746            -         -          -
            Underground
            -----------

             Stockpiles                  820                   0.73                     19             -         -          -         820       0.73          19          497       0.67          11
             ----------                  ---                   ----                    ---           ---       ---        ---         ---       ----         ---          ---       ----         ---

                  Wassa                    -                     -                     -            -         -          -           -         -          -         694       4.31          96
                  Other
                  -----

               Subtotal                  820                   0.73                     19        23,268       2.08       1,558       24,089       2.04       1,578       34,911       1.75       1,970
                  Wassa
                  -----

                 Bogoso                1,251                   2.51                    101           703       2.54          57        1,954       2.52         158        4,662       2.63         394
                 ------                -----                   ----                    ---           ---       ----         ---        -----       ----         ---        -----       ----         ---

                 Dumasi                    -                     -                     -            -         -          -           -         -          -       8,941       2.37         682
                 ------                  ---                   ---                   ---          ---       ---        ---         ---       ---        ---       -----       ----         ---

                 Mampon                    -                     -                     -          320       4.43          46          320       4.43          46        1,133       5.24         191
                 ------                  ---                   ---                   ---          ---       ----         ---          ---       ----         ---        -----       ----         ---

                Prestea                  315                   2.00                     20         1,381       2.30         102        1,697       2.24         122        3,139       2.59         261
                  South
                  -----

                Prestea                    -                     -                     -            -         -          -           -         -          -       1,434       9.61         443
            Underground
            -----------

             Stockpiles                  405                   1.82                     24             -         -          -         405       1.82          24          106       1.79           6
             ----------                  ---                   ----                    ---           ---       ---        ---         ---       ----         ---          ---       ----         ---

               Subtotal                1,971                   2.29                    145         2,405       2.65         205        4,376       2.49         350       19,415       3.17       1,977
                 Bogoso
                 ------

              GSR Total                2,791                   1.83                    164        25,673       2.14       1,763       28,465       2.11       1,928       54,327       2.26       3,947
              ---------                -----                   ----                    ---        ------       ----       -----       ------       ----       -----       ------       ----       -----


    Notes to the Mineral Reserve Statement:

             (1)    The stated Mineral Reserves have been
                     prepared in accordance with the
                     requirements of NI 43-101 and are
                     classified in accordance with the
                     Canadian Institute of Mining,
                     Metallurgy and Petroleum's "CIM
                     Definition Standards - For Mineral
                     Resources and Mineral Reserves".
                     Mineral Reserve estimates reflect the
                     Company's reasonable expectation that
                     all necessary permits and approvals
                     will be obtained and maintained. Mining
                     dilution and mining recovery vary by
                     deposit and have been applied in
                     estimating the Mineral Reserves.

             (2)    The 2014 Mineral Reserves for Bogoso
                     were prepared under the supervision of
                     Dr. Martin Raffield, Senior Vice
                     President Project Development and
                     Technical Services for the Company.
                     Dr. Raffield is a "Qualified Person" as
                     defined by Canada's NI 43-101.

             (3)    The 2014 Mineral Reserves for Wassa were
                     prepared under the supervision of Mr.
                     Mike Beare, Ceng Beng ACSM MIMMM, SRK
                     Corporate Consultant (Mining
                     Engineering).  Mr. Beare is a
                     "Qualified Person" as defined by
                     Canada's NI 43-101 and is independent
                     of the Company.

             (4)    The Mineral Reserves at December 31,
                     2014 were estimated using a gold price
                     assumption of $1,200 per ounce.

             (5)    The slope angles of all pit designs are
                     based on geo-technical criteria as
                     established by external consultants.
                     The size and shape of the pit designs
                     are guided by consideration of the
                     results from a pit optimization
                     program.

             (6)    Cut-off grades have been estimated
                     based on operating cost projections,
                     mining dilution and recovery, royalty
                     payment requirements and applicable
                     metallurgical recovery and estimates
                     are as follows: Wassa pit 0.77 g/t;
                     Wassa underground 2.50 g/t; Bogoso
                     refractory pits 1.60 g/t; Mampon and
                     Prestea South oxide pits 1.00 g/t.

             (7)   Numbers may not add due to rounding.

             (8)    Further information regarding the
                     Company's Mineral Reserves as at
                     December 31, 2013 can be found in the
                     Company's annual information form for
                     the year ended December 31, 2013, which
                     is available under the Company's
                     profile at www.sedar.com.

Reconciliation of Mineral Reserves

To view the graphs presenting the Wassa, Bogoso and total combined Mineral Reserve reconciliation on an ounces basis between December 31, 2013 and December 31, 2014, please click here.

Mineral Resources

The Measured Mineral Resources and Indicated Mineral Resources reported below are inclusive of the Proven and Probable Mineral Reserves as shown above and have been estimated in accordance with the requirements of NI 43-101. All comparisons made are to December 31, 2013 Measured Mineral Resources and Indicated Mineral Resources.

The total Measured Mineral Resources and Indicated Mineral Resources as well as the Inferred Mineral Resources have been estimated on a gold price assumption of $1,400 per ounce for December 31, 2014; the same gold price assumption that was used for the December 31, 2013 estimate. The economic cut-off grades for Mineral Resources are lower than those for Mineral Reserves and are indicative of the fact that the Mineral Resource estimates include material that may become economically viable under more favorable conditions including increases in gold price.

Wassa's total Measured and Indicated Mineral Resource has increased by 6% to 3.52 million ounces from December 31, 2013. This is largely due to the increase and conversion of Mineral Resources from the Wassa Main pit to Wassa Underground. Measured and Indicated Resources at Wassa Underground now stand at 1.47 million ounces, a 409% increase over the 289,000 ounces of Measured and Indicated Mineral Resource disclosed at December 31, 2013. Overall, the Measured and Indicated Mineral Resource grade for Wassa has increased from 2.02 g/t Au as at December 31, 2013 to 2.21 g/t Au as at December 31, 2014.

Bogoso's Measured and Indicated Mineral Resource increased 3% to 3.1 million ounces from December 31, 2013, primarily due to the lower cost assumptions used to constrain the Measured and Indicated Resources with the largest increase observed at the Prestea South project. Overall grades of the Bogoso Measured and Indicated Mineral Resource decreased by 5% to 3.12 g/t Au from December 31, 2013.

The following table provides a breakdown of the Measured and Indicated Mineral Resources at Wassa and Bogoso as at December 31, 2014 and December 31, 2013.



                           Dec 31, 2014         Dec 31, 2014          Dec 31, 2014                Dec 31, 2013
                             Measured            Indicated       Measured and Indicated      Measured and Indicated
                         Mineral Resources   Mineral Resources     Mineral Resources            Mineral Resources
                         -----------------   -----------------     -----------------            -----------------

     Tonnes                    Grade               Ounces                Tonnes            Grade     Ounces     Tonnes      Grade     Ounces     Tonnes      Grade     Ounces
      (000)                  g/t Au                      (000)                   (000)    g/t Au      (000)      (000)     g/t Au      (000)      (000)     g/t Au      (000)
      ----                    ------                       ----                     ----     ------       ----        ----      ------       ----        ----      ------     ----

              Wassa Open                   -                  -                       -     33,039       1.37       1,458       33,039       1.37       1,458       45,082     1.78    2,580
                     Pit
                     ---

                   Wassa                   -                  -                       -     11,248       4.07       1,471       11,248       4.07       1,471        2,446     3.67      289
             Underground
             -----------

             Wassa Other                   -                  -                       -      5,199       3.53         590        5,199       3.53         590        3,807     3.74      458
             -----------                 ---                ---                     ---      -----       ----         ---        -----       ----         ---        -----     ----      ---

                Subtotal                   -                  -                       -     49,486       2.21       3,519       49,486       2.21       3,519       51,336     2.02    3,327
                   Wassa
                   -----

                  Bogoso               1,975                2.56                      163       2,022       2.67         173        3,997       2.62         336        4,553     2.94      431
                  ------               -----                ----                      ---       -----       ----         ---        -----       ----         ---        -----     ----      ---

                  Dumasi               3,505                2.49                      281      10,685       2.39         820       14,190       2.41       1,102       13,123     2.45    1,032
                  ------               -----                ----                      ---      ------       ----         ---       ------       ----       -----       ------     ----    -----

                  Mampon                   -                  -                       -      1,859       4.37         261        1,859       4.37         261        1,553     4.79      239
                  ------                 ---                ---                     ---      -----       ----         ---        -----       ----         ---        -----     ----      ---

           Prestea South               1,292                2.59                      108       4,430       2.43         346        5,722       2.47         454        4,304     2.67      370
           -------------               -----                ----                      ---       -----       ----         ---        -----       ----         ---        -----     ----      ---

                 Prestea                   -                  -                       -      1,322      14.82         630        1,322      14.82         630        1,356    14.50      632
             Underground
             -----------

            Bogoso Other                   -                  -                       -      4,153       2.63         351        4,153       2.63         351        3,835     2.64      325
            ------------                 ---                ---                     ---      -----       ----         ---        -----       ----         ---        -----     ----      ---

                Subtotal               6,772                2.53                      551      24,471       3.28       2,583       31,243       3.12       3,134       28,724     3.28    3,029
                  Bogoso
                  ------

               GSR Total               6,772                2.53                      551      73,957       2.57       6,101       80,730       2.56       6,653       80,060     2.47    6,356
               ---------               -----                ----                      ---      ------       ----       -----       ------       ----       -----       ------     ----    -----

Inferred Mineral Resources

Wassa's Inferred Mineral Resource has increased by 428% from December 31, 2013 to a total of 1.41 million ounces. This increase is largely due to the addition of the Wassa Underground project where the 2014 drill programs focused on extending the high grade mineralization at depth and to the South of the Wassa Underground Feasibility Study area.

Bogoso's Inferred Mineral Resource increased by 9% to 1.2 million ounces from December 31, 2013, primarily due to lower cost assumptions used for 2014. Overall grades decreased by 13% compared to 2013.



                                        Dec 31, 2014                     Dec 31, 2013
                                          Inferred                         Inferred
                                      Mineral Resources               Mineral Resources
                                      -----------------               -----------------

     Tonnes                      Grade     Ounces     Tonnes      Grade    Ounces
     (000)                      g/t Au      (000)      (000)    g/t Au      (000)
      ----                       ------       ----        ----     ------       ----

                 Wassa Open Pit      137       1.47           6         313       1.28        13
                 --------------      ---       ----         ---         ---       ----       ---

              Wassa Underground   10,331       3.69       1,227         646       3.10        64
              -----------------   ------       ----       -----         ---       ----       ---

                    Wassa Other    1,127       4.97         180       1,006       5.88       190
                    -----------    -----       ----         ---       -----       ----       ---

                 Subtotal Wassa   11,596       3.79       1,414       1,964       4.23       267
                 --------------   ------       ----       -----       -----       ----       ---

                         Bogoso    1,293       2.43         101         288       2.08        19
                         ------    -----       ----         ---         ---       ----       ---

                         Dumasi        -         -          -          -         -        -
                         ------      ---       ---        ---        ---       ---      ---

                         Mampon      344       1.67          19         221       1.79        13
                         ------      ---       ----         ---         ---       ----       ---

                  Prestea South      843       4.79         130         581       6.00       112
                  -------------      ---       ----         ---         ---       ----       ---

            Prestea Underground    3,253       8.05         842       3,289       8.02       848
            -------------------    -----       ----         ---       -----       ----       ---

                   Bogoso Other      908       2.32          68         892       2.37        68
                   ------------      ---       ----         ---         ---       ----       ---

                Subtotal Bogoso    6,642       5.43       1,159       5,271       6.25     1,060
                ---------------    -----       ----       -----       -----       ----     -----

                      GSR Total   18,238       4.39       2,573       7,236       5.71     1,327
                      ---------   ------       ----       -----       -----       ----     -----


    Notes to the Measured and Indicated Mineral Resources
     and the Inferred Mineral Resources (collectively, the
     "Mineral Resources"):

    (1)                The Mineral Resources were estimated in
                       accordance with the requirements of NI
                       43-101.

    (2)                The Mineral Resources for Wassa Other
                       include Father Brown, Benso and
                       Chichiwilli.

    (3)                The Mineral Resources for Bogoso Other
                       include Buesichem and Ablifa.

    (4)                The Wassa Underground Mineral Resource
                       has been estimated below the $1,400 per
                       ounce of gold pit shell using an
                       economic gold grade cut-off of 2.08 g/
                       t Au, which the Company believes would
                       be the lower cut-off for underground.

    (5)                The Father Brown Underground Mineral
                       Resource has been estimated below the
                       $1,400 per ounce of gold pit shell
                       using an economic gold grade cut-off
                       of 2.81 g/t Au, which the Company
                       believes would be the lower cut-off
                       for underground.

    (6)                Prestea Underground Mineral Resource has
                       been estimated below the $1,400 pit
                       shell of Prestea South down to 3800m
                       elevation using a gold cut-off at 4.94
                       g/t Au

    (7)                Mineral Resources were estimated using
                       optimized pit shells at a gold price of
                       $1,400 per ounce.  Other than gold
                       price, the same optimized pit shell and
                       underground parameters and modifying
                       factors used to determine the Mineral
                       Reserves were used to determine the
                       Mineral Resources.

    (8)                The Qualified Person reviewing and
                       validating the estimation of the
                       Mineral Resources is S. Mitchel Wasel,
                       Golden Star Resources Vice President of
                       Exploration.

    (9)               Numbers may not add due to rounding.

    (10)               Further information regarding the
                       Company's Mineral Resources as at
                       December 31, 2013 can be found in the
                       Company's annual information form for
                       the year ended December 31, 2013, which
                       is available under the Company's
                       profile at www.sedar.com.

Mineral Resource and Mineral Reserve Development

The Company's strategy is to grow production from low cost non-refractory ore sources while reducing overall operating costs. The expansion of the Wassa orebody and the potential development of an underground mine at Wassa are central to this strategy. The current Wassa Measured and Indicated Mineral Resource of 3.5 million ounces includes 1.47 million ounces reflected as Wassa Underground Measured and Indicated Mineral Resource.

Company Profile

Golden Star Resources (NYSE MKT: GSS; TSX: GSC; GSE: GSR) ("Golden Star" or the "Company") is an established gold mining company that holds a 90% interest in the Wassa, Prestea and Bogoso gold mines in Ghana. In 2014, Golden Star produced 261,000 ounces of gold and is expected to produce 250,000 - 275,000 ounces in 2015. The Company is pursuing brownfield development projects at its Wassa and Prestea mines that are expected to transform these mines into lower cost producers from 2016 onwards. As such, Golden Star offers investors leveraged exposure to the gold price in a stable African mining jurisdiction with significant development upside potential.

Statements Regarding Forward-Looking Information:

Some statements contained in this news release are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and "forward looking information" within the meaning of Canadian securities laws. Forward looking statements and information include but are not limited to, statements and information regarding: conversion of Inferred Mineral Resources to Measured and Indicated Mineral Resources; Mineral Reserve and Mineral Resource estimates and underlying assumptions; drilling and exploration at Wassa underground; timing for completion and release of the Prestea Underground Feasibility Study; timing for completing updated Mineral Reserve Estimates at Prestea Underground; access to higher grade material at Wassa Underground; cash flow improvements at Wassa Underground; the timing of accessing the high grade material at Wassa; placing the Bogoso refractory plant on care and maintenance; timing for completing mining at Bogoso; anticipated production in 2015; and transformation of Wassa and Prestea to lower cost mines. Generally, forward-looking information and statements can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such words and phrases (including negative or grammatical variations) or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Investors are cautioned that forward-looking statements and information are inherently uncertain and involve risks, assumptions and uncertainties that could cause actual facts to differ materially. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these and other factors in our Annual Information Form for the year ended December 31, 2013. Our Annual Information Form for the year ended December 31, 2013 will be superseded by our Annual Information From for the year ended December 31, 2014, which will contain similar information and will be made available on SEDAR at www.sedar.com . The forecasts contained in this press release constitute management's current estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will change as new information is received. While we may elect to update these estimates at any time, we do not undertake any estimate at any particular time or in response to any particular event.

Technical Information and Quality Control

The technical contents of this press release have been reviewed and approved by S. Mitchel Wasel, BSc Geology, a Qualified Person pursuant to NI 43-101. Mr. Wasel is Vice President Exploration for Golden Star and an active member of the Australasian Institute of Mining and Metallurgy. The 2014 estimates of Mineral Resources were prepared under the supervision of Mr. Wasel. The 2014 estimates of Mineral Reserves were prepared under the supervision of Dr. Martin Raffield, Senior Vice President Technical Services for the Company. Dr. Raffield is a "Qualified Person" as defined by NI 43-101.

The results for Wassa quoted herein are based on the analysis of saw-split HQ/NQ diamond half core or a three kilogram ("kg") single stage riffle split of a nominal 25 to 30 kg Reverse Circulation chip sample which has been sampled over nominal one meter intervals (adjusted where necessary for mineralized structures). Sample preparation and analyses have been carried out at SGS Laboratories, which is independent of the Company, in Tarkwa using a 1,000 gram slurry of sample and tap water which is prepared and subjected to an accelerated cyanide leach (LEACHWELL). The sample is then rolled for twelve hours before being allowed to settle. An aliquot of solution is then taken, gold extracted into Di-iso Butyl Ketone (DiBK), and determined by flame Atomic Absorption Spectrophotometry (AAS). Detection Limit 0.01ppm.

The results for Bogoso herein are based on the analysis of saw-split HQ sized (64mm) diamond half core or a three kilogram single stage riffle split of a nominal 25 to 30 kg Reverse Circulation chip sample which has been sampled over nominal one meter intervals (adjusted where necessary for mineralized structures). Sample preparation and analyses have been carried out at SGS Laboratories in Tarkwa using a 50 gram assay charge with a flame Atomic Absorption Spectrophotometry (AAS) finish and a detection limit of 0.01 ppm.

All analytical work is subject to a systematic and rigorous Quality Assurance-Quality Control. At least 5% of samples are certified standards and the accuracy of the analysis is confirmed to be acceptable from comparison of the recommended and actual "standards" results. The remaining half core is stored on site for future inspection and detailed logging, to provide valuable information on mineralogy, structure, alteration patterns and the controls on gold mineralization.

Cautionary Note to US Investors Concerning Estimates of Measured and Indicated Mineral Resources

This press release uses the terms "Measured Mineral Resources" and "Indicated Mineral Resources". The Company advises US investors that while these terms are recognized and required by National Instrument 43-101, the US Securities and Exchange Commission ("SEC") does not recognize them. Also, disclosure of contained ounces is permitted under Canadian regulations; however the SEC generally requires Mineral Resource information to be reported as in-place tonnage and grade. US Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into Mineral Reserves.

Cautionary Note to US Investors Concerning Estimates of Inferred Mineral Resources

This press release uses the term "Inferred Mineral Resources." The Company advises US investors that while this term is recognized and required by National Instrument 43-101, the SEC does not recognize it. "Inferred Mineral Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of Inferred Mineral Resources will ever be upgraded to a higher category. In accordance with Canadian rules, estimates of Inferred Mineral Resources cannot form the basis of feasibility or other economic studies. US investors are cautioned not to assume that any part or all of the Inferred Mineral Resource exists, or is economically or legally mineable.

SOURCE Golden Star Resources Ltd.