Details 21 September 2016

According to The National Institute of Standards and Technology (NIST), engineers spend 40 to 60 percent of their time looking for information and validating it.

A new whitepaper from McLaren Software, an Idox company, explores change management of plant documentation, and how critical decision-making begins with having trusted documents and data available to engineers at all times, from all locations.

The whitepaper explains how:

  • Quality control and reuse of plant documentation affect the success of your turnaround project
  • Plant turnarounds can be accelerated by reducing re-work, contractual disputes and ensuring regulatory compliance
  • Asset information and engineering content can be made available to all, throughout projects
  • Multiple users can access the most up-to-date information, regardless of format or source.

To learn more,download your copy of the whitepaper here.

IDOX plc published this content on 21 September 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 21 September 2016 09:18:01 UTC.

Original documenthttp://www.idoxgroup.com/news-and-events/idox-news/899-collaboration,-confidence-and-control-during-plant-turnaround-projects.html

Public permalinkhttp://www.publicnow.com/view/AFC05165383E0BAFCC357E1682ECA1BFE0CCDDCA