ABN 39 118 153 825 ASX ANNOUNCEMENT 28 JUNE 2017 Bynoe Lithium Project, NT - Drilling Update
  • Initial phase of 2017 drilling completed comprising 20 RC holes for 2,222m
  • Significant pegmatites (>10m thick) intersected at most prospects
  • Program curtailed due to wet ground conditions preventing access for heavy equipment
  • Testing of high-priority targets to resume in coming Quarter

Liontown Resources Limited (ASX: LTR) advises that it has completed part of its initial 2017 drilling program at the 100%-owned Bynoe Lithium Project, located near Darwin in the Northern Territory, with 20 Reverse Circulation (RC) holes drilled for a total 2,222m.

The drilling was designed to assess new targets defined by geochemical and geophysical surveys completed earlier in the year; however, due to boggy ground conditions the program was not completed and a number of high priority targets remain to be tested. Only seven of the new targets weretested with significant pegmatites (>10m thick) intersected at most prospects and >1% Li2O values recorded at Carlton and Hang Gong West (Figure 1/see Appendix 1 for drill-hole statistics).

Figure 1: Bynoe Project - EL30015 showing lithium-in-soil image and main prospects

1

The results confirm that primary, ore grade lithium mineralisation is widespread at Bynoe highlighting the prospectivity of the Project with numerous pegmatites remaining to be drill tested.

Atthe Carlton prospect, drill-hole LBRC071 intersected 16m @ 0.8% Li2Ofrom 70m including 3m @ 1.4% Li2O from70m and 2m @ 1.8% Li2O from78m.

The Carlton prospect comprises a >200m long, 20m thick, east-dipping pegmatite which has only been effectively tested by a single drill hole (LBRC071). Two other holes (LBRC059 and 060) were drilled towards the east, sub-parallel to the dip of mineralisation, and failed to intersect the main pegmatite (Figure 2).

Figure 2: Bynoe Project - Carlton Prospect/Drill hole plan on magnetic image

Priority targets remaining to be tested include:

  • The >1km Litchfield soil anomaly, which is located ~2km SSW on the same mineralised trend as Core Exploration's high-grade Grant's resource (see CXO release dated 8th May 2017). At this prospect soil sampling has recorded strongly elevated lithium values (Figure

    1. and field traversing has observed numerous historical workings and extensive sub- cropping pegmatites; and

    2. The southern extension of the Sandras trend. Drilling at Sandras in 2016 recorded multiple thick >1%Li2Ointersections (up to 42m @ 1%Li2Ofrom 93m) hosted by a pegmatite which is coincident with a 250m long magnetic low. A similar, larger (~700m long) magnetic feature is located 200m south of Sandras (Figure 3) beneath transported cover.

    2

    Figure 3: Bynoe Project - Magnetic image (RTP_F1p5VD_H_Wet) of Sandras area

    Further drilling is scheduled to recommence next Quarter once ground conditions permit. In addition to new targets, the drilling will also follow up the Carlton intersection and a number of other prospects where thick pegmatites have been intersected at shallow depths but where lithium would have been depleted by weathering.

    DAVID RICHARDS

    Managing Director 28 June 2017

    The Information in this report that relates to Exploration Results is based on and fairly represents information and supporting documentation prepared by Mr David Richards, who is a Competent Person and a member of the Australasian Institute of Geoscientists (AIG). Mr Richards is a full-time employee of the company.

    Mr Richards has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Richards consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

    This announcement contains forward-looking statements which involve a number of risks and uncertainties. These forward looking statements are expressed in good faith and believed to have a reasonable basis. These statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently available information. Should one or more of the risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this announcement. No obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect other future developments.

    3

    APPENDIX 1 - BYNOE PROJECT - 2017 DRILL HOLE STATISTICS

    Hole ID

    Prospect

    East

    North

    RL

    Dip

    Azimuth

    Depth (m)

    Significant (>0.5%) Lithium Results

    From (m)

    To (m)

    Interval (m)

    Grade (%)

    LBRC056

    Hang Gong

    694550

    8598806

    27

    -65

    260

    97

    81

    84

    3

    1.5

    incl. 1m @2.1% from 82m

    LBRC057

    Hang Gong

    694534

    8598781

    28

    -60

    260

    75

    No significant assays

    LBRC058

    Hang Gong

    694589

    8598791

    27

    -75

    260

    120

    74

    79

    5

    0.9

    incl. 1m @ 1.7% from 76m

    LBRC059

    Carlton

    693760

    8597980

    33

    -66

    90

    130

    No significant assays

    LBRC060

    Carlton

    693730

    8597927

    35

    -60

    90

    132

    LBRC061

    Rubix

    693764

    8597356

    36

    -65

    135

    64

    LBRC062

    Roadside

    691545

    8594745

    29

    -65

    120

    146

    LBRC063

    Bells Mona

    691157

    8594165

    35

    -70

    110

    122

    LBRC064

    Hang Gong

    694591

    8598701

    28

    -67

    260

    93

    55

    57

    2

    1.4

    LBRC065

    Hang Gong

    694251

    8598702

    30

    -65

    115

    108

    No significant assays

    LBRC066

    Hang Gong

    694350

    8598651

    30

    -65

    295

    109

    LBRC067

    Hang Gong

    694351

    8598650

    30

    -65

    115

    109

    LBRC068

    Hang Gong

    694443

    8598604

    30

    -65

    295

    109

    LBRC069

    Hang Gong

    694449

    8598601

    30

    -65

    115

    150

    LBRC070

    Johnstones

    693730

    8598940

    24

    -65

    125

    109

    LBRC071

    Carlton

    693845

    8597930

    33

    -60

    270

    115

    70

    86

    16

    0.8

    incl. 3m @ 1.4% from 70m and

    2m @ 1.8% from 78m

    LBRC072

    Hordens

    693027

    8596695

    33

    -70

    235

    83

    No significant assays

    LBRC073

    Roadside

    691655

    8594683

    30

    -60

    300

    93

    LBRC074

    Bells Mona

    691241

    8594124

    35

    -70

    290

    108

    LBRC075

    Hang Gong

    694601

    8598534

    30

    -60

    270

    150

    True widths - 75% of down hole widths

    APPENDIX 2 - BYNOE PROJECT - SANDRAS DRILL HOLE STATISTICS

    Hole ID

    Prospect

    East

    North

    RL

    Dip

    Azimuth

    Depth (m)

    Significant (>0.5%) Lithium Results

    From (m)

    To (m)

    Interval (m)

    Grade (%)

    LBRC012

    Sandras

    693222

    8576799

    55

    -65

    290

    102

    No significant assays

    LBRC013

    693252

    8576866

    52

    -65

    297

    96

    65

    73

    8

    0.8

    LBRC014

    693253

    8576866

    52

    -80

    297

    162

    93

    135

    42

    1

    incl. 4m @ 2.6% from 94m and

    incl. 3m @ 1.5% from 132m

    LBRC015

    693307

    8576976

    53

    -65

    300

    114

    70

    94

    24

    1.1

    incl. 1m @ 2.4% from 70m and

    4m @ 1.5% from 83m

    LBRC022

    693270

    8576903

    52

    -80

    295

    163

    94

    121

    27

    1.1

    incl. 3m @ 1.6% from 108m and

    2m @ 1.8% from 119m

    130

    140

    10

    0.7

    incl. 1m @ 1.8% from 131m

    LBRC023

    693269

    8776903

    52

    -65

    295

    120

    52

    81

    29

    0.9

    incl. 4m @ 1.5% from 69m

    and 2m @ 2.3% from 78m

    96

    99

    3

    1.1

    LBRC024

    693235

    8676830

    52

    -65

    295

    103

    No significant assays

    LBRC025

    693256

    8576830

    52

    -80

    295

    169

    109

    110

    1

    1.4

    136

    152

    16

    1.1

    incl. 6m @ 1.7% from 139m

    LBRC026

    693235

    8576874

    52

    -60

    295

    85

    61

    66

    5

    0.6

    LBRC027

    693286

    8576939

    52

    -65

    295

    120

    65

    71

    6

    1.1

    incl. 2m @ 2.3% from 66m

    77

    105

    28

    1

    incl. 2m @ 1.6% from 79m and

    3m @ 1.5% from 87m and

    3m @ 1.5% from 98m

    LBRC028

    693287

    8576939

    52

    -80

    295

    168

    116

    136

    20

    0.9

    incl. 2m @ 1.8% from 122m

    LBRC029

    693202

    8576757

    52

    -73

    295

    127

    No significant assays

    LBRC030

    693338

    8577047

    52

    -65

    295

    127

    True widths ~50% of down hole widths

    4

    Liontown Resources Limited published this content on 28 June 2017 and is solely responsible for the information contained herein.
    Distributed by Public, unedited and unaltered, on 21 July 2017 08:44:07 UTC.

    Original documenthttp://www.ltresources.com.au/sites/default/files/asx-announcements/6841239.pdf

    Public permalinkhttp://www.publicnow.com/view/546213BDFEBAE0275A2A51CA3B70C32D41C63BF7