The 19th China Metallurgical Construction Group (19MCC Group) won the bidding on the UFC (Ultra Fast Cooling) Transformation Works of the 2nd Hot Rolling Plant of Wuhan Iron & Steel Group on August 25, 2014.
In order to meet the demand of product quality and cost control of the enterprise, Wuhan Iron & Steel Group determines to close down outdated production facilities, utilize high-tech and carry out transformation works for UFC system and coiling fast transportation chains. As one of the major innovation projects of Wuhan Iron & Steel Group, it is located in the plant area of Wuhan Steel Works. The project scope various areas for concentrated water treatment, laminar cooling section of the main rolling line, UFC bump station and the main power room of the rolling line. The project implementation tasks include 14 construction and installation items such as medium-voltage power supply, low-voltage power supply, automation system, drive system, instrument system and public auxiliary system.



distributed by