On April 12th, The Third Company of MCC22 started Inner Mongolia Xinneng Energy Source's Strong Brine Emissions Reduction EPC Project.
The Project is located in Dalad Banner, Erdos City, Inner Mongolia. Its construction consists of nine works: a strong brine workshop, regulating reservoir, mixed reaction pond, water producing pond, thick salt pond, de-watering house, sludge thickening tank, biochemical pool and hydrochloric acid irrigation area.
This purpose of the Project is to transform the original sewage re-using device, the original sewage treatment unit and the newly-built concentrated water treatment plant in order to keep the emissions reduction rate of strong brine at or above 90%. The remaining strong brine could enable the enterprise to realize near-zero sewage emissions through evaporative crystallization in the second-stage construction of Xinneng's Demonstration Project of Near-Zero Emissions of Strong Brine, representing a huge environmental benefit and social comprehensive efficiency.



distributed by