+ . -

  On April 5th, the MCCCE Group's Third Company won the bidding for the Degan Binjiang Road East Section Phase I Project. It is located in Degan Binjiang New Town of Jiangjin, Chongqing, and owned by Chongqing Jiangjin Binjiang New Town Development and Construction Co., Ltd.

  With a total length of 2,436.344m, the stake number of this project is K1+025.696-K3+462.040 from the north of the Chengdu-Chongqing Railway to the north bridgehead interchange of Jijiang Yangtze River Bridge. It is a secondary trunk road, with a designed speed of 30 km/h, four two-way lanes and a standard road width of 24m. The main structure includes a bridge with a length of 137m and 10 barricades. The project has a duration of 30 months. Upon completion, the urban capability of flood control and city quality will be further improved, integrating Degan, Jijiang and Binjiang New Town organically into a whole.

Metallurgical Corporation of China Ltd. published this content on 10 April 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 16 April 2017 10:41:17 UTC.

Original documenthttp://www.mcc.com.cn/mccen/focus/_325423/460089/index.html

Public permalinkhttp://www.publicnow.com/view/89038DA06A065D537A8A2B480ED55732F80DA22F