Joint venture of Zvezda Shipbuilding Complex and Hyundai Samho Heavy Industries Co., Ltd. (HSHI) LLC Zvezda-Hyundai signed a contract with Lazurit Design Bureau for development of design documentation for building Aframax type tankers using gas engine fuel.

The agreement will allow creating conditions for construction of Aframax tankers at Zvezda Shipbuilding Complex.

Справка:

The Zvezda Shipbuilding Complex is being built on the basis of the Zvezda Far Eastern Shipyard by the Consortium of Rosneftegaz, Rosneft and Gazprombank. The shipbuilding complex design provides for the construction of a heavy outfitting berth, a dry dock, full-cycle production shops, and also, shops for the construction of offshore marine facilities.

The Zvezda Shipbuilding Complex will produce heavy tonnage ships, elements of offshore platforms, ice-class vessels, special vessels and other marine equipment.

Zvezda Shipbuilding Complex and HSHI set up an engineering and project management joint venture Zvezda-Hyundai in April 2017 for technology transfer and ship construction management.

Currently, a series of five Aframax vessels using gas engine fuel is under construction for Rosnefteflot, steel cutting is scheduled for late 2017, delivery of the first vessel to the customer is scheduled for 2020.

Rosneft Information Divisiontel.: + 7 (499) 517-88-978 September 2017

These materials contain statements about future events and expectations that are forward-looking in nature. Any statement in these materials that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements expressed or implied by such forward-looking statements to differ. We assume no obligations to update the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements.

OJSC Oil Company Rosneft published this content on 08 September 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 08 September 2017 06:47:04 UTC.

Original documenthttps://www.rosneft.com/press/releases/item/187653/

Public permalinkhttp://www.publicnow.com/view/0A177EA93CFEDA7987CFF3C0B468BB3A74A0C236