06.04.2018, Press release

Hamburg, 6 April 2018. The Nordex Group has opened a plant in the North Brazilian state of Brazil Piaui for the production of concrete towers. The plant is to produce the 65 towers required for the 'Lagoa do Barro' wind farm, which Nordex will be installing in the near future.

It marks one of the first major investments in this state's wind power industry. Large parts of the plant were originally used at a former facility in the south of Brazil and transported in heavy-duty loads to Lagoa do Barro City in a good 300 trips.

With this step, Nordex is able to optimize the construction costs of the wind farm and complete construction work with minimum environmental impact. 'We also wanted to ensure that the local population directly benefits from the project. Tower production alone will provide work for some 300 people,' said David Lobo, Head of Sales Brazil, who is managing the project for the Nordex Group.

About the Nordex Group

The Group has installed wind power capacity of more than 23 GW in over 25 markets, generating sales of almost EUR 3.1 billion in 2017. It currently has roughly 5,000 employees. The production network comprises plants in Germany, Spain, Brazil, the United States and India. The product range primarily concentrates on onshore turbines in the 1.5 - 4.5 MW class addressing the requirements of land constrained as well as grid constrained markets.

Attachments

  • Original document
  • Permalink

Disclaimer

Nordex SE published this content on 06 April 2018 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 06 April 2018 13:45:06 UTC