Exploration and Appraisal Drilling Update - February 2015

(ASX:OSH | ADR: OISHY | POMSoX: OSH)

5 March 2015

Oil Search operated wells Well Name Well Type Location Spud Date Rig Objective/ targets Status Taza 2

Oil appraisal
Taza PSC, Kurdistan Region of Iraq
10km NW of Taza 1
25 December 2013
Sakson Rig PR3
Appraise hydrocarbon-bearing intervals discovered by Taza 1 (Dhiban/Jeribe and Euphrates/Kirkuk) and explore deeper Tertiary and Cretaceous targets including the Shiranish Formation.
As at 28 February 2015, Taza 2 was at a depth of 4,200 metres* in a 7" hole. During the month, a flow test was carried out on the deepest interval, the Cretaceous, Shiranish Formation. Low rates of oil and water were observed at surface and analysis of the test is ongoing. Preparations
are underway for a second flow test.

Participants

1 Oil Search's funding interest is 75%, with the KRG's

20% interest carried by Oil Search and Total E&P Kurdistan Region of Iraq (Taza) B.V.

* All depths quoted are MDRT (Measured depth from rotary table) Oil Search Limited

Incorporated in Papua New Guinea ARBN 055 079 868

Head office Port Moresby Papua New Guinea

Sydney office

1 Bligh Street

Sydney NSW 2000

Australia

Mailing address

GPO Box 2442

Sydney NSW 2001

Australia

Tel: +61 2 8207 8400

Fax: +61 2 8207 8500 www.oilsearch.com


Well Name Well Type Location Spud Date Rig Objective/ targets Status Participants


Taza 3

Oil appraisal
Taza PSC, Kurdistan Region of Iraq
6km SE of Taza 1
22 October 2014
Sakson Rig 605
A deviated hole to better define the structural configuration, fluid contacts, reservoir quality and distribution and nature of fracturing of the carbonate reservoirs in the southern part of the PSC.
As at 28 February 2015, Taza 3 was at a depth of 3,724 metres in a 6" hole, having cut an 18 metre core in the Kirkuk Formation. During the month, the 8-1/ " hole was drilled to 3,487 metres and the hole enlarged to 9-1/ ", before setting the
7-5/ " casing. Drilling progress for the
month was 282 metres.
The well will now be drilled to a total depth of approximately 3,900 metres before logging and testing.

1 Oil Search's funding interest is 75%, with the KRG's

20% interest carried by Oil Search and Total E&P Kurdistan Region of Iraq (Taza) B.V.


Oil Search - February Drilling Report - 5 March 2015

www.oilsearch.com

2


Oil Search non-operated wells Well Name Well Type Location Spud Date Rig Objective/ Targets Status Operator1 Participants2 Antelope 4

Gas appraisal
PRL 15, Gulf Province, PNG
1km south of Antelope 2
16 September 2014
Western Drilling Rig 1
Delineate the size and structural extent of the Elk/Antelope gas field.
As at 28 February 2015, Antelope 4 was at a depth of 2,002 metres in an
8-1/ " hole, within the target carbonate
reservoir. Towards the end of the month, drilling operations resumed. Coring operations are now underway, prior to drilling ahead through the reservoir.
InterOil Corporation

1 The PRL 15 participants have voted to appoint

Total E&P PNG Limited as Operator of the PRL

15 Joint Venture. The appointment will take effect in accordance with an operator transition plan and the terms of the Joint Venture Operating Agreement.

2 Gross interests, pre-Government and landowner back-in


Oil Search - February Drilling Report - 5 March 2015

www.oilsearch.com

3


Well Name Well Type Location Spud Date Rig Objective Status Operator2 Participants3


Antelope 5

Gas appraisal
PRL 15, Gulf Province, PNG
1.7km west of Antelope 2
23 December 2014
Oil Search Rig 103
Delineate the size and structural extent of the Elk/Antelope gas field.
As at 28 February 2015, Antelope 5 was at a depth of 2,453 metres in a 6" hole. During the month, the top reservoir was intersected at 1,534 metres1, a position
that was approximately 50 metres high to Oil Search's prognosis. Drilling progress for the month was 917 metres.
The well has now reached total depth with logging and evaluation programmes in progress. An extended flow test is planned following completion of drilling operations on Antelope 5.
InterOil Corporation

Oil Search

22.8%

Total

40.1%

InterOil

36.5%

Minorities

0.5%

Total

100%

1 True vertical depth, metres sub-sea, to be confirmed by logs

2 The PRL 15 participants have voted to appoint

Total E&P PNG Limited as Operator of the PRL 15

Joint Venture. The appointment will take effect in accordance with an operator transition plan and the terms of the Joint Venture Operating Agreement.

3 Gross interests, pre-Government and landowner back-in


Oil Search - February Drilling Report - 5 March 2015

www.oilsearch.com

4


Well Name Well Type Location Spud Date Rig Objective Status Operator Participants


Hides F1 (Hides Deep)

Gas development/exploration
PDL 1, Hides field, NW Highlands, PNG
3.5km SE of Hides G-pad wells
8 October 2014
Nabors Rig 703
Designed to be completed as a Hides development well and to penetrate the Koi-Iange reservoir (currently mapped
~700m below the Hides Toro/Digimu reservoirs, in a similar structural setting).
As at 28 February 2015, Hides F1 was at a depth of 4,508 metres and drilling ahead in a 6" hole.
During the month, a sidetrack was completed to a depth of 4,009 metres, where a 7" liner was set and cemented, and the well was drilled through the Koi Iange interval. Drilling progress for the month was 546 metres.
The forward plan is to acquire logs over the Koi Iange.
ExxonMobil PNG Limited

PETER BOTTEN, CBE

Managing Director Oil Search - February Drilling Report - 5 March 2015

www.oilsearch.com

5


For further information please contact:

Ms Ann Diamant
Group Manager, Investor Relations
Tel: +61 2 8207 8440
Mob: +61 407 483 128

Oil Search - February Drilling Report - 5 March 2015

www.oilsearch.com

6

distributed by