• EUR 1.7 mn to build new railway section of 1.4 km inside refinery perimeter
  • Railway network used inside Petrobrazi refinery measures approximately 50 km in length

OMV Petrom, the largest oil and gas producer in Southeastern Europe, has inaugurated a new railway section inside Petrobrazi refinery. It measures 1.4 km in length and required investments of around EUR 1.7 mn.

You can find additional details in the enclosed press release.

  • Investment in railway extension within Petrobrazi refinery,

OMV Petrom SA published this content on 14 July 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 14 July 2017 08:44:10 UTC.

Original documenthttp://www.omvpetrom.com/portal/generic-list/display?lang=en&contentId=1255776192591501

Public permalinkhttp://www.publicnow.com/view/AF0CB6E9C9E1C9EABD9B987E3E9D4140C64F9B8E