19.02.2018

As part of the ongoing preparation of the next TYNDP 2018 by the ENTSO-E, the reports of the Regional Investment Plans and of the European Power System 2040 are open to public consultation until 28 February.

The Regional Investment Plans and the European Power Systems 2040 reports seek to identify, at the European level and with a long-term view, the needs concerning new network reinforcements and targets for interconnection capabilities, in order to promote the integration of the energy markets, the integration of renewable sources and the safe supply.

You can participate in the public consultation using the following link.'

REN - Redes Energéticas Nacionais SGPS SA published this content on 19 February 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 19 February 2018 17:20:02 UTC.

Original documenthttp://www.ren.pt/en-GB/media/comunicados/detalhe/entso_e___tyndp_2018_public_consultation_of_the_regional_investment_plans_and_european_power_system_2040_reports

Public permalinkhttp://www.publicnow.com/view/6F2E53A555D7E29802B0395445A676B054B3F318