SAVANNAH RESOURCES PLC

AIM: SAV

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS - 25 May 2017

PROJECT

PORTFOLIO

MINERAL SANDS MOZAMBIQUE

(CONSORTIUM AGREEMENT WITH RIO TINTO)

COPPER/GOLD

OMAN

LITHIUM PORTUGAL AND FINLAND

Savannah Resources Plc Strategic Lithium Project Acquisition with Near-Term Production Potential, Portugal

Savannah Resources plc (AIM: SAV) ('Savannah' or 'the Company'), is pleased to announce that it has entered into an agreement with a consortium of vendors led by Slipstream Resources Investments Pty Ltd ('Vendors' or 'Slipstream') to acquire a series of highly prospective lithium projects with near-term production potential in the north of Portugal (the "Transaction").

HIGHLIGHTS:
  • Strategic opportunity to become the first significant lithium producer in Europe having acquired the Mina do Barroso prospect in northern Portugal;

  • Approved Mining Plan ('MP'), Environmental Impact Assessment ('EIA') and a 30-year mining concession/Mining Licence ('ML') means that with a defined JORC resource a development decision could be made by the end of 2018;

  • Significant exploration results include:

    • Due diligence rock chip sampling identifying desirable spodumene pegmatites

      >70m wide with Li2O grades >3.12%

    • Continuous rock chipping returning broad zones of lithium mineralisation including30m at 1.18% Li2O,30m at 1.35% Li2Oand 35m at 1.67% Li2O

    • High-grade drill results which commence from at or near surface including 32mat 1.16% Li2Ofrom 20m, 12m at 1.6% Li2Ofrom 1m and 16m at 1.35% Li2Ofrom surface;

  • Preliminary metallurgical test work has indicated that a high-grade (over 6% Li2O), clean, low iron, lithium concentrate can be produced;

  • Further exploration underway including mapping and rock chip sampling with drilling expected to commence in around two weeks with the initial focus on defining a JORC resource at Mina do Barroso to support a potential mine development;

  • Acquisition is part of an enlarged acquisition that included a 75% interest in four project areas covering up to 1,018km2 of tenure with proven high-grade lithium mineralisation offering additional upside potential;

  • Secured Portuguese operating partner Mineralia Minas, Geotecnia e Construcoes, Lda., which has commissioned over 11 quarries and mines in Portugal;

  • Portugal has consistently ranked highly in the world for desirability for investment (2016 Fraser Institute study) and is in the top 7 lithium-producing countries (linked to the ceramics industry); and

  • Consideration for the Transaction will comprise of initial cash consideration of AUD$1.0million plus the issue of 20,000,000 ordinary shares of 1p each in Savannah ('Ordinary Shares') to the Vendors.

  • Additional milestone based, conditional consideration, as summarised below, which could lead to an aggregate consideration of AUD$10.1m (£5.8m) (cash and shares) based on Savannah's closing share price on 24 May 2017.

Savannah's CEO, David Archer said: "This transaction provides Savannah with a unique opportunity to secure what we believe to be one of the most advanced lithium mining concessions in Europe, in a low-cost and stable political environment. With an approved Mining Plan, Environmental Impact Assessment, Mining Licence and the potential to produce high grade lithium product, we believe the Mina do Barroso prospect could transform the European lithium / Electric Vehicle ('EV') industry by becoming the first producer of battery quality lithium in Europe.

"Mainland Europe currently consumes around 25% of the world's lithium and is an early adopter of EVs and battery storage solutions. With battery production by major European manufacturers rapidly expanding, any potential local supplies from mainland Europe are being keenly sought and we believe the Mina do Barroso, together with our enlarged portfolio of lithium assets in Portugal, is ideally situated to address this strategic need. Work is now underway to define a JORC resource at Mina do Barroso so that we may be in a position to make a development decision by the end of 2018. This is undoubtedly a highly strategic and valuable growth opportunity for Savannah."

FURTHER INFORMATION

Savannah is acquiring a 75% interest in actual and contingent assets spread over four project areas with over 1,018km2 of tenure including: one granted mining concession (5.42km2), and nine pending exploration licence applications (the 'Projects').

Of the 1,018km2 Project area relating to the pending applications: 348km2 is on track for government approval and 670km2 is currently subject in part to overlapping exploration licence applications from third parties.

1) TECHNICAL INFORMATION ON THE PROJECTS

The advanced nature of the Mina do Barroso prospect, with an approved ML, MP and EIA means that with the definition of a JORC resource, a development decision could potentially be made by the end of 2018. Mina do Barroso is part of the enlarged Covas do Barroso Project area.

Figure 1. Mining Licence Details

Region

Concession Name

Area

Expiry*

Covas do Barroso

C-100: 'Mina do Barroso'

5.42km2

12/05/2036

*Mining licence may benefit from a contract extension of 20 years at agreement of licence holder and Portuguese State.

Figure 2. Exploration Licence Applications Details

Region

Tenement Name

Area (km2)

Approximate Overlap by Other Applications (km2)

% Economic Interest Held by Slipstream Resources Unipessoal Lda

Covas do Barroso

Vilar

99

79

100%

Beça

21

Nil

100%

Reigoso

83

Nil

100%

Serra D'Arga

Calvelo

73

Nil

100%

Ponte de Lima

294

147

100%

Caminha

193

174

100%

Barca D'Arga

Meda

171

Nil

60%

Almendra

57

17

100%

Tâmega

Caramos

29

26

100%

Figure 3. Country Map for the Projects Figure 4. Location of the Projects

Savannah Resources plc published this content on 25 May 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 25 May 2017 08:55:23 UTC.

Original documenthttp://savannahresources.com/cms/wp-content/uploads/2017/05/Portugal-acquisition-25.05.17.pdf

Public permalinkhttp://www.publicnow.com/view/AA07A9FCDCBA78C90F7DB29E7EE92BCA0AE5F5F2