Key points

! Mustang-2 appraisal well in PPL 243 cased and suspended after intersecting net pay of

6.4 metres of excellent quality sands in the mid-Birkhead reservoir

! Drilling ahead on the Tornado-1 exploration well in PEL 104 southeast of Mustang oil field on the western flank of the Cooper Basin

! Drilling program for FY14 completed as planned with 30 oil wells drilled

OIL EXPLORATION, APPRAISAL AND DEVELOPMENT

Senex Energy Limited (Senex, ASX: SXY) and its joint venture partners have completed the planned 30 well drilling program for FY14. The oil drilling program for FY15 will be announced in July 2014, with drilling expected to commence shortly thereafter.

Tornado-1 exploration well (PEL 104: Senex 60% and operator, Beach Energy Limited

(Beach, ASX: BPT) 40%)

EDA Rig 3 is drilling ahead on the Tornado-1 exploration well, targeting a total depth of approximately 2,200 metres. The rig commenced drilling on 26 May 2014 approximately
4 kilometres southeast of Mustang-1 on the western flank of the South Australian Cooper
Basin.
Tornado-1 is the first exploration well to be drilled from the results of the Lignum 3D seismic survey. The primary objective is the mid-Birkhead reservoir sands within a combined structural-stratigraphic trap. As secondary objectives, the well will evaluate the Patchawarra Formation and Namur Sandstone.
The location for Tornado-1 was selected on the basis of the same AVO/Inversion1 work used
to predict the presence of Birkhead reservoir in the Mustang wells. Further prospects identified from the Lignum 3D seismic survey will be drilled as part of the FY15 drilling campaign.

1 A brief description of AVO/Inversion enhanced seismic interpretation techniques is provided on page 5.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 1 of 6

ASX Announcement

Mustang-2 appraisal well (PPL 243: Senex 60% and operator, Beach 40%)

The Mustang-2 appraisal well was cased and suspended as a future Birkhead oil producer after intersecting 6.4 metres of net oil pay updip of the Mustang-1 oil discovery. The well intersected 12 metres of gross sand, which is almost twice the thickness of the reservoir section intersected at Mustang-1 (refer Figure 1).
EDA Rig 3 commenced drilling the Mustang-2 appraisal well on 2 May approximately
570 metres northwest of Mustang-1. Mustang-2 was drilled to a total depth of 1,915 metres to evaluate the oil bearing potential of the mid-Birkhead Formation.

Figure 1: Well correlation for Mustang wells

MUSTANG OIL WATER CONTACT

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 2 of 6

DRILLING REGISTER

ASX Announcement


Exploration, appraisal and development drilling undertaken in FY14 is shown below. The location of Senex oil fields is shown in Figure 2.

Oil

Well

Location

Spud date

Type

Result*

Worrior-8

PPL 207

22-Jun-2013

Development

Up to 18 metres in the McKinlay, Namur, Birkhead and Patchawarra

Worrior-9

PPL 207

4-Jul-2013

Exploration

Plugged and abandoned

Burruna-2

PEL 115

6-Aug-2013

Exploration

5.3 metres of net pay in the Namur

3,600 bopd during testing

Acrasia-7

PPL 203

24-Aug-2013

Development

7.1 metres of net pay in the Hutton, Poolowanna, Tinchoo and Arrabury

Ventura-2

PPL 214

28-Aug-2013

Development

13.4 metres of net pay in the Murta and

McKinlay

Kobari-2

PEL 516

14-Sep-2013

Exploration

Oil shows over 22 metres

Pirie-11

PEL 105

30-Sep-2013

Exploration

Moderate oil shows in the Birkhead Formation

Dunlop-1

PEL 113

1-Oct-2013

Exploration

Approx 3 metres of net pay in the McKinlay

Moothandella-42

ATP 794P

5-Oct-2013

Appraisal

10 metres of net pay Murta, Namur and

Westbourne

Sprigg-1

PEL 514

6-Oct-2013

Exploration

No net pay calculated with a gas show in the Paning Member. Well suspended pending evaluation of test results

Pirraminta-2

PEL 514

22-Oct-2013

Exploration

Residual oil. Cased and suspended as a future water well

Burruna-3

PEL 115

8-Nov-2013

Appraisal

Interpreted net pay of approximately 3 metres in the lower Birkhead

Acrasia-6

PPL 203

14-Nov-2013

Appraisal

32.8 metres of net pay in the Hutton, Poolowanna and Tinchoo

Vintage Crop-3

PPL 241

24-Nov-2013

Appraisal

4.2 metres of net pay in the Murta and

Birkhead

Growler-13

PPL 242

27-Dec-2013

Exploration

Oil-saturated interval intersected

Acrasia-8

PPL 203

30-Dec-2013

Development

29.8 metres of net pay in the Birkhead, Hutton, Poolowanna and Tinchoo

Mirage-5

PPL 213

04-Jan-2014

Appraisal

12.1 meters of net pay in the Murta

Spitfire-4

PEL 104

09-Jan-2014

Appraisal

13.8 metres of net pay in the Birkhead

Growler-12

PRL 15

17-Jan-2014

Appraisal

Intersected an oil saturated interval

Snatcher-11

PPL 240

31-Jan-2014

Appraisal

Approximately 4.5 metre oil-saturated interval

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 3 of 6

ASX Announcement

Well

Location

Spud date

Type

Result*

intersected in the Birkhead

Mirage-6

PPL 213

01-Feb-2014

Appraisal

11.6 metres of net pay in the Murta

Vintage Crop-4

PEL 516

21-Feb-2014

Appraisal

2.5 metres of net pay in the McKinlay

8.0 metres of net pay in the Murta

Worrior-10

PPL 207

27-Feb-2014

Appraisal

4.5 metres of net pay in the Patchawarra

4.9 metres of calculated net pay in the Murta

Vintage Crop-5

PEL 516

08-Mar-2014

Appraisal

4.3 metres of calculated net pay in the Murta

5 metres of porous sand with oil and gas shows in the McKinlay Member

Spitfire-5

PEL 104

23-Mar-2014

Development

7.2 metres of net pay in the Birkhead

Spitfire-3

PEL 104

24-Mar-2014

Appraisal

6.1 metres of net pay in the Birkhead

Spitfire-6

PEL 104

04-Apr-2014

Development

8.9 metres of net pay in the Birkhead

Mustang-3

PPL 243

19-Apr-2014

Appraisal

Plugged and abandoned

Mustang-2

PPL 243

2-May-2014

Appraisal

6.4 metres of net pay in the Birkhead

Tornado-1

PEL 104

26-May-2014

Exploration

Drilling ahead

* Net pay figures represent the latest calculations and may differ from originally published numbers.

Gas

Well

Location

Spud date

Type

Result

Paradise Downs-103

PL 171

13-Aug-2013

Appraisal

Cased and suspended

Kato-34

ATP 593P

13-Oct-2013

Exploration

Plugged and abandoned after testing

Kato-44

ATP 593P

27-Oct-2013

Exploration

Plugged and abandoned after testing

Indy-34

ATP 771P

22-Nov-2013

Exploration

Plugged and abandoned after testing

Indy-44

ATP 771P

9-Dec-2013

Exploration

Plugged and abandoned after testing

1 Operated by Tellus Resources

2 Operated by Bridgeport Energy

3 Operated by QGC

4 Core hole not designed for gas production

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 4 of 6

For further information contact:

Ian Davies Managing Director Senex Energy Limited Phone: (07) 3837 9900

ASX Announcement


Andrew Price

Chief Financial Officer Senex Energy Limited Phone: (07) 3335 9777

About AVO/Inversion enhanced seismic interpretation techniques

AVO (Amplitude variation with offset): This technique uses the changes in seismic reflection amplitude to determine rock-type and fluid content. Successful AVO analysis requires special processing of seismic data and modelling of rock properties with a known fluid content. When the rock-types and their seismic properties have been determined, it is possible to interrogate the seismic volume and find other areas where those criteria are met. In the Cooper Basin, this process can be used to predict the presence or absence of the Jurassic reservoirs and sealing shales.

Inversion: A mathematical process by which the components of seismic data are used to generate a model that is consistent with well data where rock and seismic properties are known i.e. the process of solving the inverse problem. In seismology, 3D seismic data, vertical seismic profiles and well log data can be used to perform inversion, the result of which is a model of geological layers and their thickness, density and seismic velocities. These data can be directly related to the quality of the reservoir rocks being investigated and is used on Senex's 3D seismic surveys to optimise well locations and to help define the limits of stratigraphic traps.

Competent person

Information about Senex's reserves and resources estimates has been compiled in accordance with the definitions and guidelines in the 2007 SPE PRMS. The information is based on, and fairly represents, information and supporting documentation prepared by, or under the supervision of, Mr James Crowley BSc (Hons) who has consented to the inclusion of this information in the form and context in which it appears in this report. Mr Crowley is a qualified petroleum reserves and resources evaluator, a member of Society of Petroleum Engineers and full time employee of Senex.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 5 of 6

Senex rl ASX Announcement

Senex Energy Limited

Figure 2: Senex conventional oil fields (operated and non-operated)

QUEENSLAND SOUTH AUSTRALIA

Senex gas field

Senex oil field

/'V Gas pipeline

/'V Oil pipeline

SOUTHERN OILFAIRWAY

COOPER BASIN NEWSOUTH

WALES

Senex. o - =2s====:::sJo

Senex Energy Umited

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@sen ex e ne r g y.com.au senexenergy.com.au

Page 6 of 6

distributed by