Monthly drilling report - December 2013



Release Date: 8 January 2014

Key points

! 13 of 15 oil wells drilled to date in 2013/14 cased and suspended for future production and testing

! Growler-13 exploration well in PPL 242 to be cased and suspended for future production testing after successfully intersecting approximately 10 metres of oil-saturated mid- Birkhead sandstone

! Vintage Crop-3 appraisal well in PPL 241 to be cased and suspended as a future Birkhead oil producer after intersecting approximately seven metres of interpreted net oil pay

! Acrasia-6 appraisal well in PPL 203 intersects 31 metres net oil pay and an additional

15 metres probable net oil pay across stacked reservoirs including a new oil accumulation in the upper Tinchoo sandstone

! Drilling is underway on the Acrasia-8 development well in PPL 203

! Coal seam gas drilling campaign for 2013 successfully completed in the Queensland

Surat Basin with four core holes drilled

OIL EXPLORATION, APPRAISAL AND DEVELOPMENT

Since 1 July 2013, Senex Energy Limited (Senex, ASX: SXY) and its joint venture partners have drilled 15 oil wells. Of those wells, 13 have been cased and suspended for future production and testing. The location of Senex oil fields is shown in Figure 1.

Growler-13 exploration well (PPL 242: Senex 60% and operator)

The Growler-13 exploration well has confirmed an extension of the mid-Birkhead reservoir east of the main Growler field. The well spudded on 27 December 2013 and reached a total depth of 1,836 metres on 2 January 2014. Good oil and gas shows were observed during drilling and preliminary analysis of well data indicates approximately 10 metres of
oil-saturated mid-Birkhead Formation above the field oil-water contact. The well has been
cased and suspended pending production testing.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 1 of 8

ASX Announcement

Vintage Crop-3 appraisal well (PPL 241: Senex 100%)

The Vintage Crop-3 appraisal well confirmed the southern extension of the field having intersected the McKinlay Member, Murta, Birkhead and Hutton formations. Interpretation of wireline logs indicates 3.8 metres of net pay in the Murta Formation and a further 3 metres of net pay in the Birkhead Formation.
Vintage Crop-3, which was drilled to a total depth of 1,714 metres, is located approximately
430 metres south of the Vintage Crop-1 oil discovery. The well will be completed for production in the Birkhead Formation.

Acrasia-6 appraisal well (PPL 203: Senex 100%)

The Acrasia-6 appraisal well confirmed several opportunities to increase oil production from the Acrasia oil field, 125 kilometres north east of Moomba, near the Queensland border:
1. Exploitation of partially-swept oil accumulations in the Hutton, Birkhead, Poolowanna and lower Tinchoo formations;
2. Production from a newly discovered oil accumulation in a sandstone reservoir of the upper
Tinchoo Formation; and
3. Further evaluation of the oil production potential of the Arrabury Formation sandstones. Acrasia-6 spudded on 14 November 2013 and reached a total depth of 2,369 metres with
good oil shows evident throughout the sandstones of the Hutton, Birkhead, Poolowanna and Tinchoo formations. Interpretation of wireline logs indicate approximately 31 metres of net pay across these four target zones with an additional 15 metres of probable pay calculated for the Birkhead and Tinchoo formations. Net pay in the Arrabury Formation will be assessed when the results of core analysis are available to calibrate the wireline logs. Acrasia-6 is located approximately 300 metres south of Acrasia-1.

Acrasia-8 development well (PPL 203: Senex 100%)

Following successful appraisal at Acrasia-6, Ensign Rig 754 commenced drilling the Acrasia-8 development well on 30 December 2013. The deviated well, which is co-located on the Acrasia-6 well pad, was primarily designed to accelerate oil recovery from the Acrasia oil field by draining the known Poolowanna oil pool and providing an additional drainage point for the Hutton Sandstone. The secondary objectives are to access the Birkhead Formation and test the extent of the upper Tinchoo sandstone accumulation intersected by Acrasia-6.
The rig is drilling ahead, targeting total depth of 2,548 metres.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 2 of 8

FORWARD OIL DRILLING PROGRAM

ASX Announcement


By the end of December 2013, Senex had commenced drilling the sixteenth oil well of more than 30 wells planned to be drilled across the Cooper-Eromanga Basin during 2013/14. To date, the drilling program has successfully discovered four new oil accumulations in the southern Cooper-Eromanga Basin and revitalised the Acrasia field north east of Moomba.
The drilling program will now expand to encompass Senex's highly-prospective acreage on the western flank oil fairway with wells planned for Spitfire, Growler, Mustang and Snatcher oil fields. Drilling will also continue across the Company's southern permits to appraise recent discoveries and further develop known accumulations.
In December 2013, Senex announced that a year-long program of work on oil and gas prospectivity had identified more than 450 leads and prospects across majority held, operated permits in the South Australian Cooper-Eromanga Basin (refer Figure 2). These leads and prospects, combined with analysis and interpretation of more than 2,000 square kilometres of new 3D seismic data, will create a substantial portfolio of low risk exploration targets for Senex in coming years.
The next five drilling targets are described below.

Spitfire-4 appraisal well (PEL 104: Senex 60% and operator)

Spitfire-4 will appraise the extent of the mid-Birkhead reservoir encountered in previous Spitfire wells. Spitfire-4 will be drilled 500 metres north west of Spitfire-2, which intersected an interpreted net oil pay of 6.5 metres in the mid-Birkhead Formation.

Snatcher-11 appraisal well (PPL 240: Senex 60% and operator)

Snatcher-11 will assess the channel sands of the Birkhead Formation in the northern zone of Snatcher oil field. The well is located approximately 430 metres to the north of Snatcher-9, which intersected 11.2 metres of net pay.

Growler-12 appraisal well (PPL 242: Senex 60% and operator)

Growler-12 will appraise the extent the Birkhead reservoir north of the main Growler field. Growler-12 is located 1,400 metres northwest of Growler-3, which intersected an
interpreted net oil pay of 14.7 metres in the mid-Birkhead Formation.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 3 of 8

ASX Announcement

Mirage-5 appraisal well (PPL 213: Senex 100%)

EDA Rig 3 will commence the Mirage-5 well in mid January 2014. Mirage-5 is located approximately 650 metres south west of Mirage-4. The well will test the extent of the Mirage oil field which produces from the Murta Formation. Additional targets include the McKinlay Member and Hutton Sandstone.

Mirage-6 appraisal well (PPL 213: Senex 100%)

After Mirage-5, EDA Rig 3 will mobilise to drill the Mirage-6 appraisal well in early February
2014. Mirage-6 is located approximately 850 metres south east of Mirage-4 and is primarily designed to test the extent of the field. The well will also test the Namur Sandstone that is producing in the nearby Burruna oil field.

COAL SEAM GAS EXPLORATION

Western Surat Basin permits

Senex has completed a four core hole program in its western Surat Basin coal seam gas permits ATP 593P and ATP 771P (both Senex 45% and operator), which was designed to further delineate reserves and resources.
The final well, Indy-4, spudded on 9 December 2013 and reached total depth of 210 metres on
15 December 2013. Gas shows were present across multiple coal seams. Eight coal desorption samples were collected for testing and four drill stem tests were conducted to determine permeability.
All coal samples from the four wells are still presently undergoing desorption testing before more analytical testing from which Senex and its consultants will then review the results of the drilling program and then undertake a reserves and resources review across both permits.
All four wells were plugged and abandoned upon completion of testing as planned.

Eastern Surat Basin permits

Senex expects work to commence in calendar year 2014 on the six planned wells in the QGC
operated eastern Surat Basin permits PL 171 and ATP 574P (Senex 20% and 30%
respectively).

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 4 of 8

ASX Announcement

DRILLING REGISTER

Exploration, appraisal and development drilling undertaken in 2013/14 is shown below. The location of Senex oil fields is shown in Figure 1.

Oil

Well

Location

Spud date

Type

Result

Worrior-8

PPL 207

22-Jun-2013

Development

Net pay of up to 18 metres

Worrior-9

PPL 207

4-Jul-2013

Exploration

Plugged and abandoned

Burruna-2

PEL 115

6-Aug-2013

Exploration

Net pay of 5.3 metres,

3,600 bopd during testing

Acrasia-7

PPL 203

24-Aug-2013

Development

Net pay of 6.3 metres

Ventura-2

PPL 214

28-Aug-2013

Development

Net pay of 13.4 metres

Kobari-2

PEL 516

14-Sep-2013

Exploration

Oil shows over 22 metres

Pirie-11

PEL 105

30-Sep-2013

Exploration

Moderate oil shows in the

Birkhead Formation

Dunlop-1

PEL 113

1-Oct-2013

Exploration

Net pay of 3 metres,

1,200 bopd during drill stem testing

Moothandella-42

ATP 794P

5-Oct-2013

Appraisal

Interpreted net pay of

10 metres in total

Sprigg-1

PEL 514

6-Oct-2013

Exploration

Interpreted net pay of

6.3 metres

Pirraminta-2

PEL 514

22-Oct-2013

Exploration

Residual oil. Cased and suspended as a future water well

Burruna-3

PEL 115

8-Nov-2013

Appraisal

Interpreted net pay of approximately 3 metres

Acrasia-6

PPL 203

14-Nov-2013

Appraisal

31 metres net pay,

15 metres possible net pay

Vintage Crop-3

PPL 241

24-Nov-2013

Appraisal

Approximately 6.8 metres net pay

Growler-13

PPL 242

27-Dec-2013

Exploration

Oil-saturated interval intersected

Acrasia-8

PPL 203

30-Dec-2013

Development

Drilling ahead

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 5 of 8


Gas

ASX Announcement

Well

Location

Spud date

Type

Result

Paradise Downs-103

PL 171

13-Aug-2013

Appraisal

Cased and suspended

Kato-34

ATP 593P

13-Oct-2013

Exploration

Plugged and abandoned after testing

Kato-44

ATP 593P

27-Oct-2013

Exploration

Plugged and abandoned after testing

Indy-34

ATP 771P

22-Nov-2013

Exploration

Plugged and abandoned after testing

Indy-44

ATP 771P

9-Dec-2013

Exploration

Plugged and abandoned after testing

1 Operated by Tellus Resources

2 Operated by Bridgeport Energy

3 Operated by QGC

4 Core hole not designed for gas production

For further information contact:

Ian Davies Managing Director Senex Energy Limited
Phone: (07) 3837 9900
Andrew Barber

Investor Relations Manager

Senex Energy Limited
Phone: (07) 3335 9821 or 0418 783 701

Competent person's statement

Unless otherwise indicated, the statements contained in this drilling report about Senex's reserves and resources estimates have been compiled by Mr James Crowley BSc (Hons), who is General Manager - Exploration, a full time employee of Senex, in accordance with the definitions and guidelines in the 2007 Petroleum Resources Management System approved by the Society of Petroleum Engineers (SPE PRMS). Mr Crowley consents to the inclusion of the estimates in the form and context in which they appear. Senex's reserves and resources are consistent with the SPE PRMS.

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 6 of 8

Senex ASX Announcement

Senex Energy Limited

Figure 1: Senex conventional oil fields (operated and non-operated)

QUEENSLAND SOUTH AUSTRALIA

Senex gas field

Senex oil field

/'V Gas pipeline

/'V Oil pipeline

Senex permit interests

Senex permit application interests

Worrior

Senex rl o·--=25 50

Senex Energy Limited

====:::J Km

07/01/2014

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level14, 144 Edward SI, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy .com.au senexenergy.com.au

Page 7 of 8

Senex ri ASX Announcement

Senex Energy Limited

Figure 2: Cooper-Eromanga Basin leads and prospects

1- o_u_E_E !------1 M Gas leads & prospects

/A M Oil leads & prospects

M Gas Field

jiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii-=;...-...iiiiiiiiiiiiiiil C3 Oil Field

Senex gas field

Senex oil field

/"V Gas pipeline

/"V Oil pipeline

, Senex permits

WESTERN FLANK

Sprigg

Aerasia

Mustang

Growler

Worrior

Derrilyn

Toporoa

Kobari

\l

l l

Mirage

l

Vintage

Crop

Ventura

a

NEWSOUTH WALES

Senex rl o - 2c5::::===:::::5J0Km

Senex Energy Limited N

SENFXr:C)RP-GI-MA0-150-1

09/12/2013

Senex Energy Limited

ABN 50 008 942 827

Head Office

Level 14, 144 Edward St, Brisbane Qld 4000

GPO Box 2233, Brisbane Qld 4001

T +61 7 3837 9900

F +61 7 3837 9999

info@senexenergy.com.au

senexenergy.com.au

Page 8 of 8

distributed by