Sif will produce the monopiles and transition pieces for the Trianel Windpark Borkum II wind farm project in joint venture with Smulders. Together comprising approximately 32 Ktons, during the first half of 2018. This will bring Sif´s orderbook for 2018 to 129 Ktons. Sif will produce monopiles and the primary steel for the transition pieces whereby Smulders will be responsible for the secondary steel and outfitting of the transition pieces.

The Trianel Windpark Borkum II wind farm is an initiative of the municipal utilities cooperation Trianel together with 17 local energy suppliers, EWE AG and ewz Offshore Borkum GmbH. The JV was awarded the contract by EPCI-contractor Seaway Heavy Lifting.

Download the press release.

Sif Holding NV published this content on 13 June 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 20 June 2017 15:15:03 UTC.

Original documenthttps://sif-group.com/en/news/project-updates/398-sif-awarded-all-mp-s-and-tp-s-for-trianel-windpark-borkum-ii

Public permalinkhttp://www.publicnow.com/view/C88A600F30C2A67EBB3E5C81C8F9D927F32C95C5