05.12.2014

Crude Oil Production
The amount of 2,163,784 tons of crude oil or 100.6% versus November 2013 was produced at JSC TATNEFT in November, while the production since the beginning of the year amounted to 23, 999,908 tons, which was 112,250 tons more than in 2013 (100.5%). 
The amount of 23,557,826 tons of crude oil was delivered with the above-the-plan delivery amounting to 39,056 tons.

New Drilling
The new drilling penetration for 11 months of 2014 amounted to 456 thousand meters (501.4 thousand meters in 2013). Out of that amount drilling performed for JSC TATNEFT amounted to 363.4 thousand meters (395.4 thousand meters in 2013), including drilling to bitumen deposits in the amount of 16.8 thousand meters, production drilling accounting for 333.6 thousand meters and exploratory drilling accounting for 13 thousand meters. 
20.8 thousand meters (26.4 thousand meters in 2013) were penetrated for OOO "Tatneft-Samara", including production drilling in the amount of 9.5 thousand meters and exploratory drilling amounting to 11.3 thousand meters.
291 wells (338 wells in 2013) were constructed and delivered to customers. Out of this amount 230 wells were delivered to JSC TATNEFT (256 wells in 2013), including 22 wells drilled to bitumen deposits, production drilling accounting for 198 wells and exploratory drilling - 10 wells.
6 wells (21 wells in 2013) were penetrated for OOO "Tatneft-Samara", including 5 wells in production drilling and 1 well in exploratory drilling. 

Active Well Stock Drilling
During eleven months of 2014 the penetration of sidetracking and horizontal wellbores amounted to 52.4 thousand meters (48.8 thousand meters in 2013) with 17.7 thousand meters (22.1 thousand meters in 2013) drilled for JSC TATNEFT. 
93 wells (108 wells in 2013) were delivered to customers with 50 wells for JSC TATNEFT (70 wells in 2013).
The average number of drilling crews performing conventional well drilling operations since the beginning of 2014 amounted to 36, while 12 drilling crews were engaged in drilling lateral and lateral horizontal wellbores. One drilling crew performed drilling to the bituminous deposits of Ashalchinskoye oil field for NGDU "Nurlatneft".
The penetration per crew engaged in new drilling amounted to 12,339 meters for 11 months of 2014. 70.3 thousand meters were penetrated outside the Republic of Tatarstan, including 34.7 thousand meters for penetration of sidetracks and horizontal holes.

Repair of Wells
During eleven months of 2014, the crews of well remedial servicing, workover and oil recovery enhancement performed routine overhaul in 7,590 wells (767 wells in November) and workover operations in 2,543 wells (266 wells in November).
108 wells were repaired outside the Republic of Tatarstan, including 100 wells for OOO "Tatneft-Samara" and 8 wells for OOO "Tatneft-Severny". 
Formation hydrofracking operations were performed in 622 wells (69 wells in November).
7 small diameter wells were drilled and completed for NGDU "Almetyevneft" with application of well workover equipment.

Production Performance of the JSC TANECO
The TANECO Complex of Refining and Petrochemical Plants processed 720.5 thousand tons of raw materials, including 719.5 thousand tons of crude oil, and yielded 712.8 thousand tons of oil products in November 2014.

distributed by