Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

4-Traders Homepage  >  Equities  >  Tokyo  >  Tokyo Electric Power Company Holding Inc    9501   JP3585800000

SummaryChartsNewsAnalysisCalendarCompanyFinancialsConsensusRevisions 
News SummaryMost relevantAll newsSector newsTweets

Debris to be removed from side of Fukushima reactors: state-backed entity

share with twitter share with LinkedIn share with facebook
share via e-mail
0
08/31/2017 | 07:23am CET

A state-backed entity tasked with supporting the decommissioning of the Fukushima nuclear power station proposed Thursday that melted fuel be removed from the side of three of the crippled reactors as part of the process to scrap the complex.

Based on a formal proposal, the government and the plant operator Tokyo Electric Power Company Holdings Inc. will determine specific approaches to carry out the process on each reactor next month and update the plant decommissioning road map.

Under its strategic plan for 2017, the Nuclear Damage Compensation and Decommissioning Facilitation Corp. called for the removal of the fuel by partially filling the three reactors with water to cover some of the nuclear debris while allowing access to carry out the work.

The entity also pointed out that the decommissioning work requires phased efforts while maintaining flexibility, as the project still faces many uncertainties.

The extraction work from the Nos. 1-3 units at the Fukushima Daiichi nuclear complex, which suffered meltdowns following the massive 2011 earthquake and tsunami disaster, is seen as the most difficult step toward the ultimate goal of decommissioning the entire complex, set to take at least 30 to 40 years to complete.

The government and Tepco are currently aiming to start the extraction work from 2021.

Under the plan, the Nuclear Damage Compensation and Decommissioning Facilitation body proposed using a remotely controlled apparatus to shave debris from the underside of the lower section of the reactors' containment vessel while controlling the level of water.

Debris remains not only in the reactors' pressure vessel but also piled and scattered at the bottom of the containment vessel that houses the reactor vessel.

As for debris left in the reactors' pressure vessel, the entity will consider removing it from the upper part of the reactors, it said.

The decommissioning body had previously considered a strategy to fill the containment vessel with water as water is effective in containing radiation, but it has shelved the idea as the reactor containers are believed to have been damaged and would leak.

Following a magnitude-9.0 earthquake in March 2011, tsunami inundated the six-reactor plant, located on ground 10 meters above sea level, and flooded power supply facilities.

Reactor cooling systems were crippled and the three reactors suffered fuel meltdowns, while hydrogen explosions damaged the buildings housing the Nos. 1, 3 and 4 units.

The Nuclear Damage Compensation and Decommissioning Facilitation entity was established after the Fukushima crisis, the worst nuclear disaster since Chernobyl, to help the utility pay damages. The state-backed entity holds a majority stake in the operator.

==Kyodo

© Kyodo News International, Inc., source Newswire

share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on TOKYO ELECTRIC POWER COMPA
12/13 NISSAN MOTOR : TEPCO Launch Virtual Power Plant Project
12/12 TOKYO ELECTRIC POWER : TEPCO Launches Second Edition of Free Electrons Global St..
12/11 TOKYO ELECTRIC POWER : Tepco takes 50 percent stake in a renewable energy system..
12/08 TOKYO ELECTRIC POWER : TEPCO Takes 50 Percent Stake in Battery Storage Project o..
12/08 TOKYO ELECTRIC POWER : Tepco takes 50 percent stake in a battery storage project..
12/06 TOKYO ELECTRIC POWER : Evaluation of Exposure Dose of Workers at Fukushima Daiic..
12/04 TOKYO ELECTRIC POWER : Tepco mulls halving domestic branches to streamline busin..
11/30 TOKYO ELECTRIC POWER : Fuel Cost Adjustment in Electricity Rates for January 201..
11/23 TOKYO ELECTRIC POWER : International Atomic Energy Agency (IAEA) Operational Saf..
11/22 TOKYO ELECTRIC POWER : International Atomic Energy Agency (IAEA) Operational Saf..
More news
News from SeekingAlpha
10/31 Tokyo Electric Power Company Holdings ADR reports 1H results
10/17 Kobe Steel Fallout And The Impact On Domestic Steel Firms
10/04 Tepco wins safety approval for first reactor restart since Fukushima
09/07 Tepco could get restart OK for world's largest nuclear plant, reports say
07/28 Tokyo Electric Power Company Holdings ADR reports Q1 results
Financials ( JPY)
Sales 2018 5 705 B
EBIT 2018 -
Net income 2018 252 B
Debt 2018 5 555 B
Yield 2018 -
P/E ratio 2018 3,60
P/E ratio 2019 4,06
EV / Sales 2018 1,10x
EV / Sales 2019 1,08x
Capitalization 734 B
Chart TOKYO ELECTRIC POWER COMPA
Duration : Period :
Tokyo Electric Power Compa Technical Analysis Chart | 9501 | JP3585800000 | 4-Traders
Technical analysis trends TOKYO ELECTRIC POWER COMPA
Short TermMid-TermLong Term
TrendsNeutralNeutralNeutral
Income Statement Evolution
Consensus
Sell
Buy
Mean consensus HOLD
Number of Analysts 4
Average target price 483  JPY
Spread / Average Target 5,8%
EPS Revisions
Managers
NameTitle
Tomoaki Kobayakawa President & Director
Takashi Kawamura Chairman
Toshihiro Sano Director
Yuji Masuda Director
Toshiro Takebe Director
Sector and Competitors
1st jan.Capitalization (M$)
TOKYO ELECTRIC POWER COMPANY HOLDING INC-4.24%6 518
DUKE ENERGY CORP13.44%61 288
DOMINION ENERGY INC9.52%54 127
SOUTHERN CO3.80%51 867
IBERDROLA7.70%49 507
EXELON CORPORATION15.67%39 520