Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

4-Traders Homepage  >  Equities  >  Tokyo  >  Tokyo Electric Power Company Holding Inc    9501   JP3585800000

SummaryChartsNewsAnalysisCalendarCompanyFinancialsConsensusRevisions 
News SummaryMost relevantAll newsSector newsTweets

Tokyo Electric Power : Japan's Fukushima cleanup plan delays removal of fuel rods

share with twitter share with LinkedIn share with facebook
share via e-mail
0
09/26/2017 | 04:02pm CET

TOKYO (AP) — Japan's government on Tuesday approved a revision of its 30-to-40-year plan to decommission the Fukushima nuclear plant, delaying by three more years the removal of radioactive fuel rods stored at two of the three reactors damaged in the 2011 disaster.

Six and a half years since a massive earthquake and tsunami struck the plant on Japan's northeastern coast, the amount of contaminated water that must be pumped out and treated every day has decreased significantly, and remote-controlled robots have provided a limited view of melted fuel debris inside the reactors. Still, the exact location of the melted fuel is largely unknown and robots that can withstand the high radiation for prolonged work there are still being developed.

Among the highest risks at the plant are 1,573 fuel rod units, each consisting of dozens of fuel rods, which are cooled with water in storage pools that are not enclosed within the reactor buildings. The plant operator, Tokyo Electric Power Co., had planned to start moving them to safer storage by the end of fiscal 2020, but the latest plan says three more years are needed for reactor Units 1 and 2. Including delays made in earlier revisions, the fuel rod removal plan is now up to six years behind schedule. Removal at the Unit 3 reactor is set to start next year and is expected to take about two years to finish.

Naohiro Masuda, TEPCO'sFukushima Dai-ichi plant decommissioning chief, said the delay results from previously unknown damage in the storage pool areas and the need for more radioactive decontamination.

He acknowledged that the 30-40-year cleanup plan "may not sound convincing because of all the unknowns and we haven't found most of the melted fuel" inside the reactor cores. But he said it's important to set a target for developing the technology and work toward that goal.

The decommissioning plan, the second revision approved since the disaster, still calls for the removal of the melted nuclear fuel inside the reactors to start in 2021, based on recent findings on more efficient methods.

But the plan still lacks details regarding the duration of the melted fuel removal, how the radioactive waste will ultimately be stored and the final status of the plant itself, raising doubts about whether the cleanup can really be completed in 40 years.

Removing the reactors' melted fuel is by far the hardest part of the decommissioning. An underwater robot in July saw large amounts of rock-like objects and solid lumps, apparently melted nuclear fuel mixed with melted and mangled equipment and internal structures, on the floor of the Unit 3 primary containment chamber. The search for melted fuel in Units 1 and 2 has been unsuccessful due to structural damage and extremely high radiation. Despite the unknowns, debris removal methods will be finalized in 2019 and the actual removal is set to start at one of the reactors in 2021 as planned.

Japan still has no plan for the waste that comes out of the plant during decommissioning. The government and TEPCO are to compile a basic plan during fiscal 2018 when the melted debris removal begins.

This story has been corrected to show that the removal of fuel rods has been delayed for three years instead of two.

Follow Mari Yamaguchi on Twitter at twitter.com/mariyamaguchi

Find her work at https://www.apnews.com/search/mari%20yamaguchi

Copyright 2017 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed., source Associated Press News

share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on TOKYO ELECTRIC POWER COMPA
12/13 NISSAN MOTOR : TEPCO Launch Virtual Power Plant Project
12/12 TOKYO ELECTRIC POWER : TEPCO Launches Second Edition of Free Electrons Global St..
12/11 TOKYO ELECTRIC POWER : Tepco takes 50 percent stake in a renewable energy system..
12/08 TOKYO ELECTRIC POWER : TEPCO Takes 50 Percent Stake in Battery Storage Project o..
12/08 TOKYO ELECTRIC POWER : Tepco takes 50 percent stake in a battery storage project..
12/06 TOKYO ELECTRIC POWER : Evaluation of Exposure Dose of Workers at Fukushima Daiic..
12/04 TOKYO ELECTRIC POWER : Tepco mulls halving domestic branches to streamline busin..
11/30 TOKYO ELECTRIC POWER : Fuel Cost Adjustment in Electricity Rates for January 201..
11/23 TOKYO ELECTRIC POWER : International Atomic Energy Agency (IAEA) Operational Saf..
11/22 TOKYO ELECTRIC POWER : International Atomic Energy Agency (IAEA) Operational Saf..
More news
News from SeekingAlpha
10/31 Tokyo Electric Power Company Holdings ADR reports 1H results
10/17 Kobe Steel Fallout And The Impact On Domestic Steel Firms
10/04 Tepco wins safety approval for first reactor restart since Fukushima
09/07 Tepco could get restart OK for world's largest nuclear plant, reports say
07/28 Tokyo Electric Power Company Holdings ADR reports Q1 results
Financials ( JPY)
Sales 2018 5 705 B
EBIT 2018 -
Net income 2018 252 B
Debt 2018 5 555 B
Yield 2018 -
P/E ratio 2018 3,60
P/E ratio 2019 4,06
EV / Sales 2018 1,10x
EV / Sales 2019 1,08x
Capitalization 734 B
Chart TOKYO ELECTRIC POWER COMPA
Duration : Period :
Tokyo Electric Power Compa Technical Analysis Chart | 9501 | JP3585800000 | 4-Traders
Technical analysis trends TOKYO ELECTRIC POWER COMPA
Short TermMid-TermLong Term
TrendsNeutralNeutralNeutral
Income Statement Evolution
Consensus
Sell
Buy
Mean consensus HOLD
Number of Analysts 4
Average target price 483  JPY
Spread / Average Target 5,8%
EPS Revisions
Managers
NameTitle
Tomoaki Kobayakawa President & Director
Takashi Kawamura Chairman
Toshihiro Sano Director
Yuji Masuda Director
Toshiro Takebe Director
Sector and Competitors
1st jan.Capitalization (M$)
TOKYO ELECTRIC POWER COMPANY HOLDING INC-3.18%6 518
DUKE ENERGY CORP13.44%61 855
DOMINION ENERGY INC9.52%54 147
SOUTHERN CO3.80%51 867
IBERDROLA7.70%49 944
EXELON CORPORATION15.67%40 279