28 October 2016

ASX Code: WCN

Extension of time to hold Annual General Meeting

White Cliff Minerals Limited (ASX: WCN) ("White Cliff" or "the Company") announces that it has received ASIC approval to extend the time within which to hold its annual general meeting (AGM) from 30 November 2016 until 15 December 2016.

This extension has been granted to allow the Company time to complete a capital raising that it is currently undertaking.

The Company submitted that it was in shareholders' interests to delay the AGM to allow it to put certain resolutions to the AGM that will relate to this capital raising.

Michael Langoulant

Executive Chairman

White Cliff Minerals Limited ABN 22 126 299 125 Suite 2, Level 1, 47 Havelock Street, West Perth WA 6005.

PO Box 368 West Perth WA 6872. Telephone +61 8 9321 2233 Facsimile +61 8 9324 2977 www.wcminerals.com.au

For further information please contact:

www.wcminerals.com.au

Todd Hibberd Managing Director

+61 8 9321 2233

About White Cliff Minerals Limited White Cliff Minerals Limited is a Western Australian based exploration company with the following main projects: Aucu Gold Project (89%): The Project contains extensive porphyry related gold and copper mineralisation starting at the surface and extending over several kilometres. Drilling during 2014 has defined a major gold discovery with an initial inferred resource of 1.15Mt at 4.2 g/t containing 156,000 ounces of gold Drilling has also defined a significant copper deposit at surface consisting of 10Mt at 0.41% copper containing 40,000 tonnes of copper. Extensive mineralisation occurs around both deposits demonstrating significant expansion potential. The project is located in the Kyrgyz Republic, 350km west-southwest of the capital city of Bishkek and covers 83 square kilometres. The Aucu gold project is located in the western part of the Tien Shan Belt, a highly mineralised zone that extending for over 2500 km, from western Uzbekistan, through Tajikistan, Kyrgyz Republic and southern Kazakhstan to western China. Merolia Project (100%): The project consists of 771 square kilometres of the Merolia Greenstone belt and contains extensive ultramafic sequences including the Diorite Hill layered ultramafic complex, the Rotorua ultramafic complex, the Coglia ultramafic complex and a 51 kilometre long zone of extrusive ultramafic lava's. The Intrusive complexes are prospective for nickel-copper sulphide accumulations possibly with platinum group elements, and the extrusive ultramafic rocks are prospective for nickel sulphide and nickel-cobalt accumulations.

The project also contains extensive basalt sequences that are prospective for gold mineralisation where recent soil sampling has identified significant gold in soil anomalies at the Ironstone, Comet Well and Burtville East prospects.

Bremer Range (100%): The project covers over 127 square kilometres in the Lake Johnson Greenstone Belt, which contains the Emily Ann and Maggie Hayes nickel sulphide deposits. These mines have a total resource of approximately 140,000 tonnes of contained nickel. The project area has excellent prospectivity for both komatiite associated nickel sulphides and amphibolite facies high-grade gold mineralisation. Laverton Gold Project (100%): The project consists of 136 square kilometres of tenement applications in the Laverton Greenstone belt. The core prospects are Jupiter North and Dacian North located 20km southwest of Laverton in the core of the structurally complex Laverton Tectonic zone immediately north of the Granny Smith Gold Mine (3 MOz) and 7 kilometres north of the Wallaby Gold Mine (7 MOz).

White Cliff Minerals Limited 2

White Cliff Minerals Limited published this content on 28 October 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 28 October 2016 04:26:02 UTC.

Original documenthttp://wcminerals.com.au/content/uploads/2016/10/WCN-AGM-extension-28.10.16.pdf

Public permalinkhttp://www.publicnow.com/view/A466E43D74EE2F22AE03D3C00FB7087DC81C6C42