Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

4-Traders Homepage  >  News  >  Companies  >  All News

News : Companies

Latest NewsCompaniesMarketsEconomy & ForexCommoditiesInterest RatesBusiness LeadersFinance ProfessionalsCalendarSectors

Instor Launches Data Center Fit Up Estimator for Facility Whitespace Planning

share with twitter share with LinkedIn share with facebook
share via e-mail
0
02/08/2017 | 02:31pm CET

Owner/operators can now quickly estimate the costs and scope of projects at their outset to forecast anticipated expenses for a new data center build

Instor Solutions, Inc. (Instor), an international leader in data center infrastructure solutions, today announced the release of its complimentary Data Center Fit Up Estimator. The new tool allows owners, operators and colocation sales teams to quickly estimate anticipated expenses in the initial stages of a new project or whitespace build out to forecast total cost.

Analyzing actual specifications, vendor products, and regional differences, the Data Center Fit Up Estimator produces a rough estimate of the financial impact of a new build or expanded data center project. By adjusting size factors, power requirements, and other details, data center owners, operators and colo sales teams can review various scenarios of a new build and make allowances accordingly while watching the financial total adjust alongside those changes.

The Data Center Fit Up Estimator integrates information from multiple elements within a typical data center whitespace project.

As project costs vary from region to region, the Estimator takes into consideration the geographic location of the data center, in addition to the configuration, based on real-life component costs from projects completed in those areas. The Estimator maintains a running total to help facility owners and operators benchmark the financial perimeters of a project. After receiving an estimate, users have the option to validate their project’s total cost and scope.

“The release of the Data Center Fit Up Estimator will provide an innovative tool for understanding the potential buildout costs for data center fit ups,” said Jack Vonich, Vice President of Sales and Marketing at Instor. “Whether used to validate numbers, estimate projections, or gain budget approvals for projects, the Estimator was designed to benchmark new builds within realistic financial perimeters. Its flexibility allows users to scale potential projects and make informed decisions about space and power financial requirements to ensure clarity and success for the project from its earliest stages.”

The Estimator is also designed to work in conjunction with Instor’s full service, Data Center Fit Up, which was formally announced in 2016.

About Instor Solutions, Inc.

Instor collaborates with businesses ranging from high-growth startups to Fortune 1000 companies providing customized data center infrastructure solutions and facilitating individual data center needs.

Instor builds out wholesale colocation, lab, and data center spaces from whitespace to operation ready. Instor’s specialized data center fit up service reduces overall build time and project costs.

Instor is an industry leader in data center design, structured cabling, power infrastructure, and specialized containment and cooling solutions. With over 25 years of experience, Instor is headquartered in the San Francisco Bay Area. Instor has complete North American coverage with regional hubs in the Ashburn Area and the Dallas-Fort Worth Area. Instor has capabilities extending to Europe with a European headquarters based in Dublin, Ireland.

Additional information can be found at http://www.instor.com


© Business Wire 2017
share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news "Companies"
09:32pPatent Issued for Semiconductor Optical Device Integrating Photodiode with Optical Waveguide and Method of Forming the Same (USPTO 9893100)
AQ
09:32pIF BANCORP : Announces Cash Dividend
AQ
09:32pPUBLIC STORAGE : Opens New Storage Units in Gardena, California
AQ
09:31pFARMMI, INC. : Announces Full Exercise of the Underwriters' Over-Allotment Option
PR
09:30pPANHANDLE OIL AND GAS : to Present at EnerCom Dallas Investor Conference on Feb. 21st
AQ
09:30pFIRST REPUBLIC BANK : Wins Top Award for Private Banking
AQ
09:30pSCHNEIDER ELECTRIC : Patent Application Titled "Busway Vertical Spring Hanger" Published Online (USPTO 20180041016)
AQ
09:29pMOLECULAR MEDICINE : Findings from National Hellenic Research Foundation Update Understanding of Molecular Medicine [Role of the CRISPR system in controlling gene...
AQ
09:29pHUNTSMAN : MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (form 10-K)
AQ
09:29pINNOLUX : Researchers Submit Patent Application, "Display Device", for Approval (USPTO 20180040638)
AQ
Latest news "Companies"
Advertisement