Ref. #029/17
ASX Ltd
Companies Announcement Office Electronic Lodgement System
HIGHLIGHTS
May 2017- McKinlay Member success from first two oil wells of five-well Callawonga campaign
- Record drill time of 5.1 days for Callawonga-14
- Cooper Basin JV gas development success from directional drilling initiative AUSTRALIA - COOPER AND EROMANGA BASINS
Western Flank Oil - ex PEL 92
(Beach 75% and operator, Cooper Energy 25%)A five-well development and appraisal campaign commenced in the Callawonga Field. The campaign is seeking to develop new oil reserves in the McKinlay Member and appraise the extent and productivity of this reservoir. Past drilling has proved oil within the McKinlay Member, however there has been minimal production to date. The first two wells of the campaign, Callawonga-14 and Callawonga-18, both intersected the McKinlay Member approximately two metres high to prognosis, extending the reservoir's western and eastern limits. Callawonga-14 intersected one metre of net oil pay and Callawonga-18 intersected two metres of net oil pay. These results were in-line with expectations and both wells were cased and suspended as future producers. The third well of the campaign, Callawonga-15, spudded immediately prior to month-end.
Continued efficiency improvements were evident with Callawonga-14 drilled in 5.1 days (from spud to rig release), a record time for a Beach operated well. Efficiency gains and faster drill times support plans for expanded future drilling campaigns.
South Australian Gas - Cooper Basin JV
(Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)A two-well directional drilling development campaign utilising a workover rig commenced in the Dullingari and Dullingari North fields, located approximately 65 kilometres east of the Moomba processing facility. The primary objective is the Patchawarra Formation, with the Toolachee and Epsilon formations providing secondary targets.
The first well of the campaign, Dullingari-43 DW1, was side-tracked from the currently non-producing Dullingari-43 well. Dullingari-43 DW1 intersected approximately 25 metres of net gas pay across a 286 metre gross section in the Patchawarra Formation, and approximately 12 metres of net gas pay across the secondary targets. These results were in-line with pre-drill estimates and the well was cased and suspended as a future producer. Success using this side-track drilling technique may allow additional development opportunities to be pursued across the Cooper Basin.
EXPLORATION AND APPRAISALWestern Flank Oil - PEL 630
(Beach operator and farming into 50% interest with Bridgeport)A two-well oil exploration campaign was completed in the western block of the PEL 630 permit, located approximately 60 kilometres northeast of the Bauer Field. The wells were located outboard of existing oil discoveries to test a possible northern extension of the Namur and Birkhead play fairways. The second well of the campaign, Harvey's Return-1, was drilled to test the mapped crest of an anticlinal structure within the Namur Sandstone. No oil shows were detected and the well was plugged and abandoned. Results from the campaign have helped refine the northern extent of the oil play fairways. Gas prospects in the eastern block of PEL 630 are currently being assessed and may be included in the FY18 gas exploration program.
Queensland Gas - Cooper Basin JV
(Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)Lepard-3 was drilled as a standalone appraisal well on the western flank of the Lepard Field. The well targeted the Toolachee and Patchawarra formations as primary objectives, and the Epsilon Formation as a secondary objective. The well was cased and suspended as a future gas producer with preliminary assessment of results indicating a low-side outcome.
A six-well near-field gas exploration and appraisal campaign progressed in southwest Queensland. Cougar-1, the fourth well of the campaign, is located on the southeast flank of the Windorah Trough and follows successful exploration and infrastructure installations in the region in 2016. The well is targeting the Toolachee Formation as a primary objective and the Patchawarra Formation and Nappamerri Group as secondary objectives. At month-end, Cougar-1 was drilling ahead.
Monthly Drilling Report - Period ended 06:00, 1 June 2017
Well | Participants | Progress and Status | Primary Targets |
Cooper Basin operated | |||
Callawonga-14 | BPT* 75.00% COE 25.00% | Drilling this month: 1,429 metres Current depth: 1,429 metres (total depth) Status: Cased and suspended as a future McKinlay Member oil producer | McKinlay Member |
PPL 220 Oil development C/E Basin, SA |
Callawonga-18 | BPT* 75.00% COE 25.00% | Drilling this month: 1,582 meres Current depth: 1,582 metres (total depth) Status: Cased and suspended as a future McKinlay Member oil producer | McKinlay Member |
PPL 220 Oil development C/E Basin, SA |
Callawonga-15 | BPT* 75.00% COE 25.00% | Drilling this month: 262 metres Current depth: 262 metres Status: Drilling ahead | McKinlay Member |
PPL 220 Oil development C/E Basin, SA |
Harvey's Return-1 | BPT* 50.00% BEL 50.00% | Drilling this month: 2,174 metres Current depth: 2,174 metres (total depth) Status: Plugged and abandoned | Namur Sandstone |
PEL 630 Oil exploration C/E Basin, SA |
Cooper Basin non-operated | |||
Dullingari-43 DW1 | BPT 20.21% STO* 66.60% ORG 13.19% | Drilling this month: 2,853 metres Current depth: 2,853 metres (total depth) Status: Cased and suspended as a future Permian gas producer | Patchawarra Formation |
PPL 12 Gas development C/E Basin, SA |
Lepard-3 | BPT 23.20% STO* 60.06% ORG 16.74% | Drilling this month: 2,847 metres Current depth: 2,847 metres (total depth) Status: Cased and suspended as a future Permian gas producer | Toolachee Formation Patchawarra Formation |
PL 254 Gas apprais al C/E Basin, QLD |
Cougar-1 | BPT 23.20% STO* 60.06% ORG 16.74% | Drilling this month: 2,756 metres Current depth: 2,756 metres Status: Drilling ahead | Toolachee Formation |
ATP 1189 Gas exploration C/E Basin, QLD |
( * ) Operator
BPT Beach Energy Ltd
BEL Bridgeport Pty Ltd COE Cooper Energy Ltd ORG Origin Energy Ltd STO Santos Ltd
Jeff Schrull
Group Executive Exploration and Development
For more information please contact the following on +61 8 8338 2833 Corporate: Jeff Schrull, Group Executive Exploration and Development Investor Relations: Derek Piper, Investor Relations Manager
Beach Energy Limited published this content on 07 June 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 07 June 2017 03:13:16 UTC.