• [ Date:2015-11-26 Visits:1 ]

  •   China Construction Fourth Engineering Division Corp., Ltd (CSCEC 4th Bureau) has developed and worked out two technologies during the construction of Guangzhou East Tower Project, namely 'Solution and Technical Innovation on Vertical Ways to Transport Large-Scale Equipments during Construction Period of High-rise Buildings' and 'Research and Application of General Contracting Management System Based on BIM', which were identified on November 24, 2015 to have arrived at world advanced level in their entirety.

      Before then, the technological achievement of 'Research and Application of Green Concrete with High Adaptability Applied in Super High-rise Buildings' had already wholly reached world leading level.(from CSCEC 4th Bureau)

    【print】 【closed】
distributed by