• [ Date:2016-05-20 Visits:3 ]

  •   On May 18, 2016, China Construction Second Engineering Bureau Ltd. (CSCEC 2nd Bureau) signed the civil work contract for Unit #3 & Unit #4 nuclear island of Guangxi Fangcheng Port Nuclear Power Plant (Phase II).
    Located in eastern Qisha Peninsula of Fangcheng Port City, Guangxi Zhuang Autonomous Region, the nuclear power plant is designed to build six million-kilowatt nuclear units. Unit #3 & #4, the first demonstration project of China Guangzhou Nuclear Power Group, is to adopt Hualong No.1 unit (HPR1000), China's third generation nuclear power technology with proprietary intellectual property rights. (from CSCEC 2nd Bureau)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 20 May 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 20 May 2016 07:52:03 UTC.

Original documenthttp://english.cscec.com/art/2016/5/20/art_211_275567.html

Public permalinkhttp://www.publicnow.com/view/82E7C08CFF7CA8E0E732980E8018B5F691793680