• [ Date:2017-03-29 Visits:1 ]

  • Recently, China Construction Sixth Engineering Pision Corp., Ltd. (CSCEC 6th Bureau) has won the bid for the PPP Project of Yangtze River Bridge (the No. 1 tunnel crossing the river) in the Ferry-to-Bridge Project (Phase II) in Luzhou, Sichuan Province. The investment totals about RMB446 million.
    Located in Jiangyang District and Naxi District, the Project has a dual tower cable-stayed bridge as its main part. The bridge and its connection road is 1,598.35m in total, including 1,156m for the Yangtze River Bridge. (from CSCEC 6th Bureau)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 29 March 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 29 March 2017 02:45:10 UTC.

Original documenthttp://english.cscec.com/art/2017/3/29/art_211_356027.html

Public permalinkhttp://www.publicnow.com/view/205D92987CB3AFDEB1BA16109EC753BD59F1695E