• [ Date:2017-01-03 Visits:1 ]

  •   The first BRT line, Xiongchu Avenue BRT, built by China Construction Third Engineering Bureau Co., Ltd (CSCEC 3rd Bureau), was open to traffic on December 28th, 2016.
    The overall length of Xiongchu Avenue BRT Line is 13.6km, consisting of East and West passage sections. CSCEC 3rd Bureau undertakes the West section (Jingan Road to Chuping Road) which includes 18 stations (9 pairs), 11 BRT pedestrian crossover bridges, and 1 underground passage. (from CSCEC 3rd Bureau)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 03 January 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 10 January 2017 04:13:03 UTC.

Original documenthttp://english.cscec.com/art/2017/1/3/art_211_329602.html

Public permalinkhttp://www.publicnow.com/view/07606CAA11119311028DEDE5BAA8E1BBDF87A1E2