Read the PDF in English
Read the PDF in French
The execution of these contracts will start in 2018 with a firm tranche nearing €2 million for the design and approval of technical requirements. Following the approval, a conditional tranche of approximately €7 million will be executed in 2019.
ECA Group regularly supplies specific equipment using the multidisciplinary skills of its robotics, electronics and safety engineering departments for aeronautics or nuclear industries.
These new contracts illustrate ECA Group's ability to offer tailor-made solutions and win such contracts in the Defense field.
Attachments
- Original document
- Permalink
Disclaimer
ECA SA published this content on 18 July 2018 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 18 July 2018 16:06:02 UTC