Ariana Resources plc provides production guidance for 2021 from Kiziltepe Mine. Gold production guidance for 2021 from Kiziltepe is expected to be c. 19,000 ounces of gold, c. 90% above feasibility plan for this approximate stage of mine life. Average monthly production is expected at approximately 27,000 tonnes of ore, peaking during Second Quarter 2021; a stockpile of over 240,000 tonnes, representing well over a year of current production capacity, has already been built up on site. Ore throughput to the mill during 2021 is expected to be c. 325,000 tonnes, once operating capacity is increased as planned, which represents a 115% increase over the feasibility plan. Average grade of gold to be mined during the year is expected to be c. 2.1 g/t Au and gold recovery is expected to exceed 90%.