Gran Colombia Gold Corp. announced production results for the May month, first five month and trailing 12-months of 2021. For the May, the company produced 17,936 ounces of gold and 18,569 ounces of silver at Segovia in May 2021. Gran Colombia processed 49,089 tonnes in May at its Maria Dama plant, representing a daily processing rate of 1,584 tonnes per day (“tpd”), and head grades averaged 12.63 g/t in the month. For the first five months of the year to 84,467 ounces of gold and 95,342 ounces of silver, up from 78,661 ounces of gold and 72,309 ounces of silver in the first five months of 2020. the daily processing rate for the first five months of 2021 to an average of 1,522 tpd with an average head grade of 12.72 g/t compared with 1,242 tpd at an average head grade of 14.39 g/t in the first five months of 2020. For trailing 12-months total gold production amounting to 202,161 ounces, Gran Colombia remains on track to produce between 200,000 and 220,000 ounces of gold in 2021 from its Segovia Operations.