Capstone Green Energy Corporation announced that Laibach d.o.o, Capstone's exclusive Distribution partner for Slovenia, Croatia, and Serbia, has secured an order for a Capstone C600 Signature Series microturbine system from Pomurske Mlekarne. The 600kW system is expected to be commissioned in Spring 2023 at its Murska Sobota facility. The C600S microturbine is part of a major modernization project that includes a state-of-the-art steam system.

Utilizing the heat by-product from a microturbine will allow operators to reduce emissions and offers cost savings by eliminating the need to produce heat or steam in a separate unit. While traditional electricity from the grid with coal and gas-fired plants produces power at 33% efficiency, Capstone's combined heat and power systems can reach efficiencies of more than 80%. Another key factor in the equipment selection process was Capstone's industry-leading comprehensive Factory Protection Plan long-term service contract.

The Capstone FPP provides customers' needs to ensure the smooth operation of its system at a fixed cost over several years.