24f4f83e-d33d-46f9-b420-ec3bf4f99ba4.pdf 13 January 2016


December Drilling Report


  • Oil Business
    • Bauer-24 and 25 cased and suspended as future oil production wells
  • Wet Gas Business
    • Willow-1 exploration well cased and suspended for further testing


Oil Business

The Ex-PEL 91 joint venture (Drillsearch 60%, Beach 40% and Operator) commenced the two-well Bauer appraisal program during December, with both Bauer-24 and Bauer-25 cased and suspended as future production wells.

Bauer24 is the southernmost well drilled on the Bauer Field,

located approximately 950 metres south of Bauer-13 and 850 metres northeast of Chiton- 3 (see map). The well was drilled to appraise a structural high between the Bauer and Chiton fields as a possible extension of

Bauer. Primary targets were the McKinlay Member and Namur Sandstone reservoirs, with the Birkhead Formation providing a secondary target. Bauer-24 was cased and suspended as a future producer following intersection of a 3-metre net oil column in the Namur Sandstone and a 3.5-metre gross oil- bearing interval in the overlaying McKinlay Member.


Bauer25 spudded on 28 December 2015. Drilling operations at the well were briefly suspended in early January due to heavy rain, before restarting on 8 January 2016. Bauer-25 is the northernmost well drilled

on the Bauer field, located approximately 400 metres north of Bauer-15 and 1,350 metres southwest of

Bauer North-1 (see map). The well successfully tested the northern extension of Bauer and was cased and suspended as a future producer following intersection of a 2-metre net oil column in the Namur Sandstone and a 3.5-metre gross oil bearing interval in the overlaying McKinlay Member.


Wet Gas Business

The two-well exploration drilling and testing campaign in PRLs 173 and 174 began on 17 December 2015 with the spudding of the first well, Willow-1 (see map). Willow-1 was drilled to a total depth of 3,402 metres with good gas shows observed across the sandstones and coals of the Toolachee, Epsilon and Patchawarra Formations from 3,007 to 3,333 metres.


Drillsearch's preliminary interpretation of wireline logs calculated a total of approximately 8 metres of net conventional pay consisting of 1.5 metres and 4.0 metres in the Toolachee and Epsilon Formations



Level 18, 321 Kent Street Sydney, NSW 2000 Australia


T +61 2 9249 9600

F +61 2 9249 9630


ABN 73 006 474 844

www.drillsearch.com.au

respectively and 2.5 metres in the Patchawarra Formation within a gross interval of 326 metres. Stacked reservoirs were identified, and in addition to the conventional pay, several zones with potential for unconventional pay were also observed.


Willow-1 has been cased and suspended and an Extended Production Test is currently planned for the June 2016 quarter in order to establish a stabilised flow rate.


The Ensign 932 Rig is now in the process of moving to the second well site, Jute-1, with an anticipated spud date in late January 2016.


Monthly Drilling Summary

As at 11 January 2016


Well

Participants

Progress & Summary

Primary Target

Secondary Targets

Oil Wells

Bauer - 24

DLS BPT*

60%

40%

Spud Date: Rig Release: Depth: Operation:

Progress:

Saturday, 12 December 2015

Thursday, 24 December 2015

1,750 m (TD)

Cased and Suspended 1,750 m (TD)

McKinlay Member Namur Sandstone

Birkhead Formation

PPL 253

Oil Business

Western Flank Oil C/E Basin, SA

Bauer - 25

DLS BPT*

60%

40%

Spud Date: Rig Release: Depth: Operation:

Progress:

Monday, 28 December 2015

Thursday, 14 January 2016 (Projected)

1,743 m (TD)

Case and Suspend Operations 1,743 m (TD)

McKinlay Member Namur Sandstone

Birkhead Formation

PPL 253

Oil Business

Western Flank Oil C/E Basin, SA

Wet Gas Wells

Willow - 1

DLS*

Midcontinent

80%

20%

Spud Date: Rig Release: Depth: Operation:

Progress:

Thursday, 17 December 2015

Wednesday, 13 January 2016 (Projected)

3,402 m (TD)

Running production casing 3,402 m (TD)

Toolachee Formation Epsilon Formation

Patchawarra Sandstone

PRL 173

Wet Gas Business

Northern Gas & Liquids C/E Basin, SA

* Indicates operator.


For further information please contact:


Dudley White

General Manager - Corporate Communications

Phone: +61 2 9249 9669 Email: dudley.white@drillsearch.com.au

Drillsearch Energy Limited issued this content on 13 January 2016 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 08 February 2016 14:04:24 UTC

Original Document: http://drillsearch.com.au/?wpdmdl=2541