Interconnector Limited confirms that the Planned Maintenance shutdown for Calendar Year 2024 will commence at 06:00 CET Tuesday 3 September 2024 for a duration of 15 days ending at 06:00 CET Wednesday 18 September 2024.

There will be no flow through the Interconnector in either direction for the duration of the maintenance period.

Media release available here.

Attachments

  • Original Link
  • Permalink

Disclaimer

Fluxys SA published this content on 17 April 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 17 April 2024 14:27:01 UTC.