Participate in our market consultation that will take place from 21 March 2024 to 22 April 2024. The following changes are introduced in the regulatory documents:

  1. Introducing the required changes accompanying the new configuration of the L-gas market zone after the end of the L-gas to H-gas conversion
  2. Introducing a new obligation on the TSO to inform in advance the relevant end users in case a local producer connects to the grid
  3. Clarification of applicable quality specifications and responsibilities following previous consultation 66

The following document summarizes the proposed changes: Summary Note Consultation 67

An online info session will be given on Friday March 29th as from 10h30: Join the meeting now (Meeting ID: 326 036 845 042 ; Passcode: EVAH6i).

Documents in consultation (with track changes):

You are kindly invited to send your written comments to marketing@fluxys.com by 22 April 2024 before 17:00 CET.

Please mention in your response whether the content is to be treated as confidential or not. Unless otherwise specified, all comments will be treated as non-confidential.

Attachments

  • Original Link
  • Permalink

Disclaimer

Fluxys SA published this content on 21 March 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 21 March 2024 12:53:10 UTC.