ASX / MEDIA RELEASE

31 January 2022

QUARTERLY REPORT DECEMBER 2021

Odin Metals Limited (Odin, ODM or the Company) is pleased to report on activities undertaken in the

December 2021 quarter and its financial position at the end of the period.

only

HIGHLIGHTS

use

Odin's 5000m maiden drilling programme at the district scale Koonenberry Copper project

commenced in November 2021

ODM has completed ~2,800m of Reverse Circulation drilling in December, predominantly

focusing on the Grasmere and Cymbric Vale Targets

Copper mineralisation was intersected in the majority of holes with assays pending

Drilling Contractor and ODM's technical team will mobilise to site during the first week of

February to continue the RC drilling

+2,000m RC drilling is planned with multiple drill campaigns to be completed throughout

2022

Post initial RC drilling, diamond core drilling is planned followed by further RC drilling

KOONENBERRY PROJECT

personal

The Koonenberry Project is an emerging, district scale, Copper and Base Metals exploration package located 80km east of Broken Hill, New South Wales. The Company considers the Koonenberry Belt to be highly prospective for a number of styles of mineralisation including VMS hosted Cu-Zn-Au-Ag deposits (which is substantiated by the presence of the Grasmere deposit), magmatic Ni-Cu-PGE, epithermal Ag- Pb-Cu and orogenic Au.

ForThe Koonenberry Project covers 2600km2 of land holding, ~150km strike of the significantly under- explored Koonenberry Belt which is considered highly prospective for VMS-hostedCu-Zn-Ag-Au, magmatic Ni-Cu-PGE, epithermal Ag-Pb-Cu and orogenic Au.

Grasmere

The largest copper rich massive sulphide zone identified to date in Western NSW. Grasmere contains an Indicated and Inferred Mineral Resource Estimate reported in accordance with JORC (2004) totalling 5.75 Mt @ 1.03% Cu, 0.35% Zn, 0.05 g/t Au and 2.3 g/t Ag1.

Grasmere is hosted in a semi continuous mineralised zone over a strike length of 4km and defined by 75 drill holes and is open at depth. EM results confirm higher magnitude anomalism along strike and in proximity to the Grasmere deposit, highlighting the potential association with increased sulphide mineralisation.

Odin Metals Limited

ABN: 32 141 804 104 35 Richardson Street, West Perth WA 6005

Cymbric Vale

Minimal modern exploration has identified significant copper prospectively at Cymbric Vale with a shear hosted Cu system and similar structural and geological setting to Grasmere. EM survey results confirm onlytargets have been identified at Cymbric Vale over >7km of strike and incorporating known copper

mineralisation that extends over >1.2km of strike.

Wertago

Historic mining trend, highly prospective for VMS along strike, a further untested anomalous "Western" trend has been identified that extends for over 12km and includes 2 high priority targets.

For usepersonal

Figure 1: HeliTEM EM targets at the Koonenberry Cu Project (Airborne Magnetics Background, NE Shaded TMI Image)

Odin Metals Limited

ABN: 32 141 804 104 35 Richardson Street, West Perth WA 6005

DRILLING

Odin's maiden ~2,800m drilling programme was completed in December 2021. Drilling intersected shallow onlyoxide copper in most holes at Cymbric Vale with a deeper hole completed to the north of the most southern hole intersecting visual Copper sulphide mineralisation over approximately 12m from 84m, assays pending. Initial drilling at Grasmere intersected mineralisation as ODM continues to scope and confirm the

resource and to extend the known mineralised footprint.

Odin has continued to engage a NSW based RC drilling contractor and will re-commence drilling at the Koonenberry project with technical team and drill rig due to arrive on site in the first week of February.

The company plans to drill a minimum of 5,000m RC drilling prior to May as well as diamond core drilling initially targeting Grasmere, followed by Cymbric Vale and Wertago.

useGrasmere

Drilling focussed on the HeliTEM priority targets that were identified along strike to the SSE of the Grasmere Deposit and under the southern end of the Deposit (Indicated and Inferred Mineral Resource Estimate totalling 5.75 Mt @ 1.03% Cu1).

Cymbric Vale

personalOdin has targeted drilling at Cymbric Vale within an area where the HeliTEM survey identified targets over >7km of strike. RC drilling was completed proximal to a southern historic RC hole and mine working (20m

t 0.73% Cu). Drilling intersected shallow visual oxide Cu mineralisation in most holes (<60m deep) with a deeper hole completed to the north (100m along strike) of the southern historic hole intersecting visual Cu sulphide mineralisation (chalcopyrite) over approximately 12m from 84m.

Forigure 2: A small section of Copper mineralisation (chalcopyrite) intersected in RC chips from hole CV0010, 87 to 94m shown of a broader mineralised interval of 84 to 96m

Wertago

Odin plans to commence Pattern Geochemical Auger Drilling post the RC drilling program to specifically drill the newly identified anomalous EM trends identified at Wertago that extend for over 10km, including two high priority targets that are ~1,200 metres apart.

Odin Metals Limited

ABN: 32 141 804 104 35 Richardson Street, West Perth WA 6005

FINANCIAL COMMENTARY

The Quarterly Cashflow Report (Appendix 5B) for the period ending 31 December 2021 provides an overview of the Company's financial activities. The Company was in a strong financial position at the end onlyof the quarter with $2.2 million in cash. This will be sufficient to fund corporate costs for the remainder of

2022 and also facilitate further exploration activities.

Expenditure on exploration during the reporting period amounted to A$243k, including drilling costs of A$165k. A further $210k of payments were made in January 2022 relating to Odin's maiden ~2,800m

drilling programme which was completed in December 2021, including drilling costs f A$145k. Payments for administration and corporate costs amounted to $165K and related to costs for and associated with director's fees, listing and compliance, legal fees, corporate advisory and consulting fees. The aggregate amount of payments to related parties and their associates included in

the current quarter cash flows from operating activities was $64k (refer to Table 1).

Notes on Release:

1.

See ASX Announcements "District Scale Copper Project Acquisition", 18 February 2021 and

use

"Acquisition of Grasmere Copper Deposit", 06 April 2021, for further information, Competent

Person's Consent, material assumptions, and technical parameters concerning historical work at

the Koonenberry project.

personalas defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) "Australasian Code for

ENDS

This ASX release was authorised by the Board of the Company

For further information please contact info@odinmetals.com.au

Competent Persons Statement:

The information in this report that relates to Exploration results is an accurate representation of the available data and is based on information compiled by Mr Simon Mottram who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Mottram is a Director of Odin Metals Limited. Mr Mottram has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person (CP)

Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Mottram consents to the

inclusion in the report of the matters based on his information in the form and context in which it

For

appears.

Table 1: Payments to Related Parties of the Entity and their Associates

Current

Previous

Quarter

Quarter

Item

(A$)

(A$)

Directors' Remuneration

Executive Chairman Fees

30,000

30,000

Non-Executive Director Fees and Superannuation

19,000

19,000

Company Secretarial and CFO Fees

15,000

15,000

Total payments to related parties of the entity and their associates

64,000

64,000

Odin Metals Limited

ABN: 32 141 804 104 35 Richardson Street, West Perth WA 6005

only

Table 2: Odin Metals Limited Tenements

Tenement

Project

Location

Area

Structure

EL 8721

Koonenberry

NSW, Australia

119 BL

100%

EL 8722

Koonenberry

NSW, Australia

253 BL

100%

EL 8790

Koonenberry

NSW, Australia

200 BL

100%

EL 8791

Koonenberry

NSW, Australia

249 BL

100%

EL 8909

Koonenberry

NSW, Australia

9 BL

100%

EL9289

Koonenberry

NSW, Australia

28 BL

100%

EL9296

Koonenberry

NSW, Australia

19BL

100%

EL 6400

Koonenberry

NSW, Australia

4 BL

100%

BL - Blocks. HA - Hectares. Km2 - Kilometres squared

Changes during the December 2021 Quarter: N/A

For personaluse

Odin Metals Limited

ABN: 32 141 804 104 35 Richardson Street, West Perth WA 6005

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Odin Metals Limited published this content on 30 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 January 2022 21:50:01 UTC.