only

Q4 FY22 Investor

use

Update Presentation

ersonal

Approved by the Board of Genex Power Limited

Renewable Energy, On Tap | Q4 FY2022 Investor Update

Diverse renewable energy

KIDSTON CLEAN ENERGY HUB

project portfolio

50MW Kidston Solar Project (Operating)

only

250MW/2000MWh Kidston Pumped Storage

Hydro Project (Construction)

By 2025 our portfolio of

Up to 200MW Kidston Wind Project

renewable energy and storage

(Development)

Up to 270MW Kidston Stage 2 Solar Project

projects will provide clean

(Feasibility)

energy to over 350,000 homes

use

offsetting up to 2mtpa of CO2

BOULDERCOMBE BATTERY PROJECT (BBP)

emissions

50MW/100MWh Large-Scale Battery Energy

ersonal

Storage System "BESS" (Construction)

JEMALONG SOLAR PROJECT (JSP)

50MW Jemalong Solar Project (Operating)

2

Q4 FY22 Activities Update

Kidston Solar

Jemalong Solar

50MW

50MW

only

K2-Hydro

Bouldercombe

Battery Project

250MW/2000MWh

50MW/100MWh Large

Scale Battery Energy

Storage System

Revenue totalled $4.8M1

Revenue generated on a merchant

Generation of 26,334MWh of renewable

basis totalled $3.8M1

energy for the period

Revenue comprised of $3.0M1 from

Average price of $182/MWh for the

electricity sales and $0.8M1 from LGC

sales

use

period2

Generation of 17,044MWh of renewable

energy for the period

Average bundled price of $209/MWh for

ersonal

the period

  • The project remains on schedule and within budget for energisation in H2 FY25
  • Key site activities and works undertaken during the period included:
    • Completion of ~45% of the Main Access Tunnel;
    • Surface blasting for the Wises Dam intake Canal;
    • Geo-technicalworks for the Powerlink 186km transmission line to connect the project; and
    • Commencement of construction of the Wises Dam, approximately 17% of the 7km embankment completed.
  • Detailed design near finalised, onsite construction activities scheduled for Q1 FY23
  • Tesla Megapacks due to arrive at the site in Q3 FY23
  • Project on track for energisation by end of H2 FY23 and positioned to capitalise on the recent market conditions

Renewable Energy, On Tap | Q4 FY2022 Investor Update

1.

Revenue figures are on an unaudited basis

3

2.

Average price per MWh doesn't include the sale of LGCs

Q4 FY22 operational and performance overview

ersonal use only

Q4 FY22

Q4 FY22

Total generation

Revenue of

43,378MWh

$8.6 million

Full year FY22

Full year FY22

Total generation

Revenue of

223,517MWh

$26.1 million

Q4 FY22

Positive Cash flow from operations

$3.5 million

Full year FY22

Positive Cash flow from operations

$4.0 million

Cash position of

$62.9m

As at 30 June 2022

Full year FY22

Lost time injury = zero Environmental incident = zero

Renewable Energy, On Tap | Q4 FY2022 Investor Update

Revenue figures are on an unaudited basis

4

Energy and LGC pricing - 2021 vs.

Average Black Electricity Regional

2022

Reference Price (RRP) $/MWh

$600

$500

• 2022 has seen a rapid increase in black electricity prices in NSW

$400

$300

and QLD caused by:

$200

only

• Increases in international coal and gas prices; and

$100

$-

Baseload (coal) generators undergoing scheduled and non-scheduled

Oct-21

Nov-21Dec-21Jan-22Feb-22Mar-22Apr-22May-22Jun-22Jul-22

maintenance.

Qld Average RRP

NSW Average RRP

Source: AEMO data

• Large Scale Generation Certificate (LGC) prices have increased

LGC Price

from ~$41.00 in Sept 2021 to ~$50.75 in July 2022

$52

use

• LGCs are generated for every MWh produced, forming an additional

$50

revenue source for renewable energy generators

$48

• Both KS1 and JSP have been significant beneficiaries of this

$46

$44

increase in pricing

ersonal

$42

$40

Oct-21

Nov-21Dec-21Jan-22Feb-22Mar-22Apr-22May-22Jun-22Jul-22

Source: Genex sourced figures

Renewable Energy, On Tap | Q4 FY2022 Investor Update

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Genex Power Ltd. published this content on 25 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 25 July 2022 22:48:01 UTC.