S e c o n d F l o o r , 9 H a v e l o c k S t r e e t

W e s t P e r t h W A 6 0 0 5

P o s t a l A d d r e s s :

P O B o x 6 8 9 , W e s t P e r t h W A 6 8 7 2

ABN 60 060 628 524

T e l e p h o n e : ( 6 1 8 ) 9 4 8 1 8 4 4 4

E m a i l : i n f o @ h a m p t o n h i l l . c o m . a u

W e b : w w w . h a m p t o n h i l l . c o m . a u

5 July 2021

Company Announcements Office

ASX Limited

Level 4, 20 Bridge Street

SYDNEY NSW 2000

DIAMOND DRILLING COMMENCES AT MILLENNIUM

Hampton Hill Mining NL is pleased to announce the commencement of the long planned diamond drill program at our 25% owned Millennium base metal project in the Paterson Province of the East Pilbara. The project is managed by 75% owner, Encounter Resources Limited.

Drilling will target downdip of the 800 metre long zone of copper anomalism defined in previous drilling which included a 26 metre section assaying 0.6% Copper from 100 metre depth that included a 10 metre interval assaying 0.9% Copper (Ref: ENR ASX release on 19 July 2012).

The 400 metre diamond drill tail extending drill hole EPT 2278 will test for primary copper at the base of a thick carbonaceous shale unit within the Broadhurst Formation and below previous anomalous drill results.

Drilling will be completed in July 2021 with assays expected in September 2021.

Millennium is located on the Tabletop Fault in an area of no outcrop, with up to 20 metres of transported overburden. This structure is known to be metallogenically important and is closely associated with the position of the Nifty copper deposit located some 50 kilometres along strike to the north-west.

Authorised by the Board

Joshua Pitt

Chairman

Attachments

Disclaimer

Hampton Hill Mining NL published this content on 05 July 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 July 2021 09:25:04 UTC.