Te Rere Hau Wind Farm Repowering

26 OCTOBER 2023

Visual simulation of the repowered Te Rere Hau wind farm

Project timeline

Te Rere Hau

Stage 1

commissioning

31 Dec 2006

Te Rere Hau

Stage 2/3

commissioning

31 Dec 2009

Te Rere Hau

Stage 4

commissioning

31 Dec 2011

Te Rere Hau

repowering

consent

granted

May

2023

Aokautere

Expansion

consent

referred

June 2023

Joint

venture

announced

Oct

2023

Project FID

expected

Q2

2025

Project first

power

expected

Q1

2027

Project

completion

expected

Q4

2027

26 OCTOBER 2023 TE RERE HAU WIND FARM REPOWERING

3

Meridian and NZ Windfarms relationship

  • Joint venture is a dual limited partnership structure (Project SPV), 50% initial equity allocation each
  • Meridian is the lead project developer and will fund a capped development contribution
  • Meridian intends enter a 15-year power purchase agreement (PPA) with the Project SPV for all of the electricity produced
  • PPA consists of two pricing periods, prices are indexed to ASX and include rolling locational and average price adjustments
  • Project SPV Board consists of 2 directors from

each JV partner

Existing turbines at the Te Rere Hau wind farm

  • Meridian has also agreed to subscribe for shares in NZ Windfarms representing up to a 19.99% shareholding, on terms separately announced by NZ Windfarms
  • NZ Windfarms board will appoint Neal Barclay (Meridian Chief Executive) as a director

26 OCTOBER 2023 TE RERE HAU WIND FARM REPOWERING

4

About NZ Windfarms Limited

  • NZ Windfarms Ltd is a long-term specialist wind farm owner and operator, with its revenue coming from the sale of sustainably generated electricity from its Te Rere Hau wind farm
  • The Te Rere Hau wind farm is located on North Range Road in the Tararua Ranges outside of Palmerston North
  • The wind farm currently has 91 turbines with a capacity of 45.5 MW producing enough clean energy to power about 16,000 homes, or in excess of half the households in Palmerston North
  • New Zealand Windfarms Ltd (NWF.NZ) is a publicly listed company on the NZ Stock Exchange

Existing turbines at the Te Rere Hau wind farm

26 OCTOBER 2023 TE RERE HAU WIND FARM REPOWERING

5

Disclaimer

The information in this presentation was prepared by Meridian Energy with due care and attention. However, the information is supplied in summary form and is therefore not necessarily complete, and no representation is made as to the accuracy, completeness or reliability of the information. In addition, neither the company nor any of its directors, employees, shareholders nor any other person shall have liability whatsoever to any person for any loss (including, without limitation, arising from any fault or negligence) arising from this presentation or any information supplied in connection with it. This presentation may contain forward-looking statements and projections. These reflect Meridian's current expectations, based on what it thinks are reasonable assumptions. Meridian gives no warranty or representation as to its future financial performance or any future matter. Except as required by law or NZX or ASX listing rules, Meridian is not obliged to update this presentation after its release, even if things change materially.

This presentation does not constitute financial advice. Further, this presentation is not and should not be construed as an offer to sell or a solicitation of an offer to buy Meridian Energy securities and may not be relied upon in connection with any purchase of Meridian Energy securities.

This presentation may contain non-GAAP financial measures, including EBITDAF. Because they are not defined by GAAP or IFRS, Meridian's calculation of these measures may differ from similarly titled measures presented by other companies and they should not be considered in isolation from, or construed as an alternative to, other financial measures determined in accordance with GAAP. Although Meridian believes they provide useful information in measuring the financial performance and condition of Meridian's business, readers are cautioned not to place undue reliance on these non-GAAP financial measures.

The information contained in this presentation should be considered in conjunction with the company's financial statements, which are included in Meridian's integrated report for the year ended 30 June

2023 and is available at:

www.meridianenergy.co.nz/investors

All currency amounts are in New Zealand dollars unless stated otherwise.

26 OCTOBER 2023 TE RERE HAU WIND FARM REPOWERING

6