5f8c77f0-9742-4bfe-9d54-05144b3decc7.pdf


NEWS RELEASE Merrex Gold - RC Drilling Results for Siribaya's Zone 1B and Taya Ko Deposits


HALIFAX, NOVA SCOTIA -- (March 7, 2016) - Greg Isenor, President and CEO of Merrex Gold Inc., ("Merrex" or the "Company") (TSX Venture: MXI) is pleased to announce the assay results from 31 reverse circulation ("RC") drill holes within the Siribaya Structure located on the Siribaya Joint Venture Gold Project in West Mali. The Siribaya Gold project is owned jointly by Merrex (50%) and IAMGOLD Corporation (50%) ("IAMGOLD").


Highlights from 31 Holes Reporting Hole SRC15-615: From 30 to 102 metres - 72 m @ 1.61 g/t including 8 m @ 6.38 g/t Hole SRC15-610: From 22 to 74 metres - 52 m @ 1.4 g/t Hole SRC15-616: From 20 to 62 metres - 42m @ 1.62 g/t including 6m @ 6.26 g/t; and from 84 to 112 metres - 28 m @ 1.1 g/t 22 of 31 holes returned significant mineralization Drilling on the Siribaya Structure

Prior to the end of the 2015 drilling season the Merrex-IAMGOLD joint venture completed a 31 hole (3,474

metres) drill program on the Siribaya main structure. (news release December 29, 2015)


The objective of the drilling program was to evaluate for additional shallow oxide mineralization at the Zone 1B deposit area (20 holes totalling 2231 metres) and the adjacent Zone Taya-Ko deposit area (11 holes totalling 1243 metres) within areas that were sparsely drilled in 2005-2015 campaigns. The drill plans for the two zones were based on a review and reinterpretation of the geologic model of the deposit areas completed by IAMGOLD earlier in the year.


The drill program was successful with 22 of 31 drill holes returning significant mineralization (see tables of assays below) including Hole 615 which returned 72 metres @ 1.61 g/t, and validating the reinterpretation of the geologic model. Additional drilling within Zone 1B, Taya Ko and other selected zones within the Siribaya Structure is warranted and will be considered in future programs although for 2016 continued drilling at Diakha will be the exploration priority.


Zone 1B and Taya Ko were included in the December 31, 2015 NI 43-101 resource estimate (see table below) (see also news release February 9, 2016 for additional details of the resource estimate including Qualified Person disclosures). The holes released today were not included in that estimate but will be in future estimates as warranted.


SIRIBAYA PROJECT - MINERAL RESOURCE ESTIMATE

December 31, 2015


Classification

Zone

Tonnage (000s)

Gold Grade (g/t Au)

Contained Ounces (Au) (000s)

Indicated

Zone 1B

2,102

1.90

129

Total Indicated

2,102

1.90

129

Inferred

Zone 1B

4,094

1.52

200

Inferred

Taya Ko

882

1.02

29

Inferred

Diakha

14,840

1.81

863

Total Inferred

19,816

1.71

1,092


Notes:

  1. CIM definitions were followed for classification of Mineral Resources.

  2. Cut-off grades range from 0.45 to 0.60 g/t Au and vary by weathering material type.

  3. Mineral Resources are estimated using a gold price of US$1,500 per ounce.

  4. Bulk density varies from 1.55 g/cm3 to 2.63 g/cm3 based on deposit and weathering code.

  5. The resources are constrained by a Whittle optimized pit shell.

  6. Numbers may not add due to rounding.

  7. Assays are capped prior to compositing. Capping levels reduced the resource estimate gold grade for Diakha by approximately 12%, and for Zone 1B and Taya Ko by approximately 4%.


Table of Significant Assays for Zone 1B


Hole#


UTM WGS84 Zone29


AZ


DIP


EOH


From


To


Length


Gold


Comment

Easting

Northing

Elevation

(m)

(m)

(m)

(g/t)

SRC15-590

261645

1373004

155

270

-55

108

48

56

8

0.52

Comment 1

SRC15-596

261509

1372528

161

270

-55

114

26

30

4

1.36

Comment 2


SRC15-599


261492


1372405


177


270


-55


114

28

62

40

70

12

8

2.03

1.46

Comment 1


SRC15-600


261487


1372322


168


270


-55


96

4

26

14

28

10

2

1.61

1,33


Comment 1

48

52

4

0.80

SRC15-601

261485

1372281

169

270

-55

114

6

28

22

1.70

Comment 1

SRC15-602

261451

1372220

180

270

-55

124

8

30

22

1.03

Comment 1

SRC15-603

261459

1372166

175

270

-55

120

2

18

16

1.61

Comment 1

SRC15-604

261450

1372115

180

270

-55

120

24

46

22

1.37

Comment 1

SRC15-605

261482

1372042

174

270

-55

78

2

16

14

1.63

Comment 1

24

32

8

1.45

SRC15-607

261401

1372002

171

270

-55

90

4

10

6

0.63

Comment 1

SRC15-608

261530

1372466

172

270

-55

150

36

48

12

2.78

Comment 3

61

68

7

1.02

SRC15-616

261448

1372042

184

270

-55

132

20

62

42

1.62

Comment 1

including

40

46

6

6.26

84

112

28

1.11


Table of Significant Assays for Taya Ko


Hole#


UTM WGS84 Zone29


AZ


DIP


EOH


From


To


Length


Gold


Comment

Easting

Northing

Elevation

(m)

(m)

(m)

(g/t)

SRC15-609

262133

1371510

180

290

-55

132

76

84

8

1.39

Comment 3


including

90

94

110

100

20

6

3.87

6.29

SRC15-610

262095

1371526

180

290

-55

114

22

74

52

1.49

Comment 4

108

112

4

1.43

SRC15-611

262041

1371545

178

290

-55

78

20

28

8

0.65

Comment 4

44

48

4

0.59

SRC15-612

262096

1371422

177

290

-55

123

108

114

6

0.77

Comment 1

SRC15-613

262044

1371439

183

290

-55

120

32

50

18

2.08

Comment 4

64

68

4

0.92

SRC15-614

261998

1371459

184

290

-55

110

8

18

10

1.38

Comment 1

SRC15-615

261800

1371266

187

110

-55

114

30

102

72

1.61

Comment 1

including

36

44

8

6,38

SRC15-619

261855

1371287

174

290

-55

104

36

40

4

0.74

Comment 1

52

58

6

1.96

64

68

4

1.02

SRC15-620

261878

1371262

178

290

-55

126

80

94

14

0.62

Comment 1


Comment 1 Drill hole is within the historical zone of mineralization Comment 2 Drill home is 90 metres north of the delineated mineralization

Comment 3 Drill home is 60 metres northeast of the delineated mineralization Comment 4 Drill home is 40 metres northeast of the delineated mineralization


Note 1: All samples sent to the laboratory are two meter samples

Note 2: QA/QC and additional technical information are described below

Note 3: Drill hole intercepts are calculated using a minimum down-hole length of 2 meter, a cut-off grade of 0.5 g/t gold, and may include up to 4 metres of internal dilution

Note 4: The widths of intersections are downhole lengths; true widths are unknown at this time

Note 5: Holes SRD15-591, 592, 593, 594, 595, 597, 598, 606, 617, and 618 did not return any significant values

Note 6: Elevations and hole locations were taken with hand held GPS. SOH means Start of Hole; EOH means End of Hole


All previously reported assay results are available in the Company's news release archive at

www.merrexgold.com.


Drill Plan Map Zone 1B

Merrex Gold Inc. issued this content on 07 March 2016 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 14 March 2016 21:17:54 UTC

Original Document: http://www.merrexgold.com/i/pdf/March 7, 2016 1B and Taya Ko drill results FINAL.pdf