Report

EL 7270 VALMIN Code Valuation

Company

NuCoal Resources Ltd

Site

NSW

Date

July 2018

Doc No

NCR4718-01

NuCoal Resources Ltd

EL 7270 VALMIN Code Valuation - Report

DOCUMENT HISTORY

Report To

Megan Etcell

Project No.

NCR4718

Doc No.

NCR4718-01

Name

Date

Version

Author

Martin Hibberd Brad Willis John Pala

25 May 2018

V2

Peer Review By

John Pala

25 May 2018

V2

Draft Issued To

Megan Etcell

25 May 2018

V2

Updated Draft Issued To

Megan Etcell

31 May 2018

V3

Updated Draft Peer Review By

John Pala

31 May 2018

V3

Final Draft Review By

John Pala

31 May 2018

V3

Final Draft Issued To

Megan Etcell

31 May 2018

V3

Final Review By

John Pala

6 July 2018

V4

Final Issued To

Glen Lewis Megan Etcell

10 July 2018

FINAL

Newcastle

Brisbane

Wollongong

Palaris Europe Limited

PO Box 1225, Newcastle NSW 2300

PO Box 1225, Newcastle NSW 2300

PO Box 1225, Newcastle NSW 2300

2nd Floor, Hygeia Building

1/384 Hunter St, Newcastle NSW 2300

11/500 Queen St, Brisbane QLD 4000

3/166 Keira St, Wollongong NSW 2500

66-68 College Rd, Harrow

Australia

Australia

Australia

Middlesex HA1 1BE

P: +61 2 4927 5511

P: +61 2 4927 5511

P: +61 2 4927 5511

United Kingdom

F: +61 2 4927 5522

F: +61 2 4927 5522

F: +61 2 4927 5522

palaris.com | ABN: 13 093 424 867

NuCoal Resources Ltd

Report: EL 7270 VALMIN Code Valuation

Important Notice

The Client

This document has been produced by or on behalf of Palaris Australia Pty Ltd ("Palaris") solely for use by and for the benefit of the Client. Use of this document is subject to the provisions of Palaris' Terms and Conditions of Service.

Palaris owns copyright in this document. Palaris grants the Client a non-transferable royalty-free licence to use this report for its internal business purposes only and to make copies of this report as it requires for those purposes.

Third Parties

If the Client wishes to make this document or information contained herein, available to a third party, it must obtain Palaris' prior written consent.

Palaris will not be responsible for any loss or damage suffered by any third party who relies on anything within this report; even if Palaris knows that the third party may be relying on this report, unless Palaris provides the third party with a written warranty to that effect. The full extent of Palaris' liability in respect of this report, if any, will be specified in that written warranty.

Scope of the Document

This document should only be used for the purpose it was produced. Palaris will not be liable for any use of this document outside its intended scope. If the Client has any queries regarding the appropriate use of this document, it should address its concerns in writing to Palaris.

Currency of Information

Palaris has used its best endeavours to ensure the information included in this report is as accurate as possible, based upon the information available to Palaris at the time of its creation. Any use of this document should take into account that it provides a 'point in time' based assessment and may need to be updated. That is, any information provided within this document may become outdated as new information becomes available. Before relying upon this document, the Client, or an approved third party, should consider its appropriateness based upon the currency of the information it contains. Palaris is under no obligation to update the information within this document at any time.

Completeness of Information

This document has been created using information and data provided by the Client and third parties. Palaris is not liable for any inaccuracy or incompleteness of the information or data obtained from, or provided by, the Client, or any third party.

Reliance on Information

Palaris is proud of its reputation as a provider of prudent and diligent consultancy services when addressing risks associated with its Clients' operations. Nevertheless, there are inherent risks which can never totally be removed. As such the contents of this document, including any findings or opinions contained within it, are not warranted or guaranteed by Palaris in any manner, expressed or implied. The Client and each approved third party should accommodate for such risk when relying upon any information supplied in this report. Such risks include, but are not limited to:

  • environmental constraints or hazards and natural disasters

  • plant and equipment constraints

  • capability and availability of management and employees

  • workplace health and safety issues

  • availability of funding to the operation

  • availability and reliability of supporting infrastructure and services

  • efficiency considerations

  • variations in cost elements

  • market conditions and global demand

  • industry development

  • regulatory and policy changes

  • changes in macroeconomic assumptions

July 2018 | NCR4718-01 | Page 3 of 48

NuCoal Resources Ltd

Report: EL 7270 VALMIN Code Valuation

Contents

Executive Summary ........................................................................................................................................... 6

1 Overview .................................................................................................................................................. 8

1.1 Introduction .................................................................................................................................... 8

1.2 Purpose of Report ......................................................................................................................... 8

1.3 Public Reporting ............................................................................................................................ 8

1.3.1 Written Engagement ......................................................................................................... 8

1.3.2 Previous Reports and Limitations ..................................................................................... 9

1.3.3 Type of Report .................................................................................................................. 9

1.4 Materiality ...................................................................................................................................... 9

1.4.1 Confidential Information .................................................................................................. 10

1.5 Indemnities .................................................................................................................................. 10

1.6 Declaration .................................................................................................................................. 10

1.6.1 Capability and Competence ............................................................................................ 10

1.6.2 Sign-Off ........................................................................................................................... 11

1.7

Site Inspection ............................................................................................................................. 11

  • 2 Tenure ................................................................................................................................................... 12

    • 2.1 Location ....................................................................................................................................... 12

    • 2.2 Purpose of Report ....................................................................................................................... 13

    • 2.3 Tenement Details ........................................................................................................................ 13

    • 2.4 Adjacent Tenements ................................................................................................................... 14

    • 2.5 History ......................................................................................................................................... 14

  • 3 Technical Assessment .......................................................................................................................... 16

    • 3.1 Regional and Local Geology ....................................................................................................... 16

      • 3.1.1 Regional Geology ............................................................................................................ 16

      • 3.1.2 Local Geology and Structure .......................................................................................... 16

      • 3.1.3 Stratigraphy ..................................................................................................................... 17

      • 3.1.4 Intrusions ......................................................................................................................... 19

    • 3.2 Exploration History ...................................................................................................................... 19

      • 3.2.1 Austen and Butta ............................................................................................................. 19

      • 3.2.2 Bayswater Colliery Company .......................................................................................... 19

      • 3.2.3 Departmental of Mineral Resources Drilling ................................................................... 19

      • 3.2.4 Seismic Survey ............................................................................................................... 22

    • 3.3 Exploration Results ..................................................................................................................... 22

    • 3.4 Prospectivity ................................................................................................................................ 24

      • 3.4.1 Bayswater Colliery Company .......................................................................................... 24

      • 3.4.2 Department of Mineral Resources .................................................................................. 25

    • 3.5 Coal Quality ................................................................................................................................. 26

    • 3.6 Coal Resources, Ore Reserves, Exploration Results and Exploration Targets .......................... 27

      • 3.6.1 Findings from Historical Exploration ............................................................................... 27

      • 3.6.2 Coal Resources ............................................................................................................... 27

    • 3.7 Infrastructure Availability and Requirements .............................................................................. 28

    • 3.8 Environmental, Social and Heritage Impacts .............................................................................. 28

    • 3.9 Geological and Geotechnical Risks ............................................................................................ 29

July 2018 | NCR4718-01 | Page 4 of 48

NuCoal Resources Ltd

Report: EL 7270 VALMIN Code Valuation

  • 4 Valuation ................................................................................................................................................ 30

  • 4.1 Background ................................................................................................................................. 30

    4.2 Basis of Value ............................................................................................................................. 31

    4.3 Common Valuation Methods ....................................................................................................... 31

    4.3.1 Multiples of Exploration Expenditure Approach .............................................................. 33

    4.3.2 Comparable Transactions ............................................................................................... 34

    4.3.3 Geoscientific Rating Approach ........................................................................................ 35

    4.4 Valuation Results ........................................................................................................................ 35

    4.5 Valuation ..................................................................................................................................... 39

  • 5 References ............................................................................................................................................ 42

Figures

Figure 2.1

Doyles Creek project area location ............................................................................................. 12

Figure 3.1

Doyles Creek area fault locations ............................................................................................... 17

Figure 3.2

Stratigraphic column ................................................................................................................... 18

Figure 3.3

Historical borehole location plan ................................................................................................. 21

Figure 3.4

Graphic log from DM Jerrys Plains DDH10 (Hawley, 1991) ....................................................... 22

Figure 3.5

The Doyles Creek area relative to A172 and A400 ..................................................................... 25

Tables

Table 1.1

Valuation summary - EL7270 ....................................................................................................... 7

Table 1.1

Contributors qualifications and contributions .............................................................................. 11

Table 2.1

History of the Doyles Creek area ................................................................................................ 14

Table 3.1

Summary of Departmental Drilling Programs ............................................................................. 20

Table 3.2

Summary of seam intervals in boreholes .................................................................................... 23

Table 3.3

Summary of coal quality results .................................................................................................. 26

Table 3.4

Doyles Creek geological and geotechnical risks ......................................................................... 29

Table 4.1

Valuation methods (Spence, 2000) ............................................................................................. 32

Table 4.2

PEM multiplier used in MEE valuation technique ....................................................................... 34

Table 4.3

Multiples of exploration expenditure method valuation summary ............................................... 36

Table 4.4

List of comparable transactions for early stage exploration projects .......................................... 37

Table 4.5

Comparable transaction values per unit of area ......................................................................... 37

Table 4.6

Comparable transaction method valuation summary .................................................................. 38

Table 4.7

Base Acquisition Cost basis of calculation .................................................................................. 38

Table 4.8

Geoscientific ratings and valuation ranges ................................................................................. 39

Table 4.9

Valuation summary - EL7270 ..................................................................................................... 40

July 2018 | NCR4718-01 | Page 5 of 48

Attachments

  • Original document
  • Permalink

Disclaimer

NuCoal Resources Ltd. published this content on 01 November 2018 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 01 November 2018 03:37:07 UTC