Signature Resources Ltd. announced the most recent set of drilling results from the on-going 10,000-metre diamond drill program at 100%-owned Lingman Lake Gold Project in Ontario, Canada using own two diamond drill rigs. These are the final diamond drill results for 2021 and are from drill hole LM21-30 and the Central Zone which continue to extend the known envelope of mineralization for all zones to depth. Highlights: 8.24 grams-per-tonne gold ("g/t Au") over 2.0 metres ("m") from 90 to 92 metres downhole; including 10.10 g/t Au over 1.0 m from 90 to 91 metres downhole in drill hole LM21-30 in the Central Zone. 7.14 g/t Au over 2.0 m from 99 to 101 metres downhole; including 10.50 g/t Au over 1.0 m from 99 to 100 metres downhole in drill hole LM21-30 in the Central Zone. The current 10,000-metre diamond drill program up to and including LM21-30 is designed to extend the mineralized envelope to depth for the North, South, and Central zones for the purpose of generating a maiden NI 43-101 mineral resource estimate, in late 2022. Additional winter drilling and regional exploration advancements are scheduled to recommence in January 2022 and will benefit from the recently completed geophysical programs. As such, these planned activities will continue to test the extension of all zones to depth and also probe along strike to the east and west.